KitLog pro

Powered By Kitlog Pro v2.0

Bob Leffler's RV-10
Work Logs Found: 1456
Category Work Time: 3249 Hours
 Date
Hours
Work Log Summary

Details

 06-21-2015
0.00
Ram Air and Flap Positioner
Details
     

 06-13-2015
0.00
Seat Levers
Details
     

 06-07-2015
0.00
My Victory - Elliot's Landing
Details
       

 04-12-2015
0.00
New Baffles
Details
       

 02-12-2015
0.00
Blast Tube Flanges
Details
     

 04-24-2014
0.00
Interior Door Handles
Details
     

 04-19-2014
0.00
Flying to PCW with Ken Wood
Details
       

 04-13-2014
0.00
Installed interior panels and carpet
Details
       

 04-06-2014
0.00
Flying to I74
Details
     

 03-11-2014
0.00
Wheel Pants and Gear Fairings installed
Details
       

 02-16-2014
0.00
Panel & Electrical
Details
       

 02-09-2014
0.00
Misc Interior
Details

 12-25-2013
0.00
Phase I Complete
     

 12-23-2013
0.00
ADSB & Transponder
Details
       

 12-14-2013
0.00
Weather Sucks!
Details
     

 12-14-2013
0.00
Navworx
Details
       

 12-13-2013
0.00
Comm1 Amtenna
Details
     

 12-12-2013
0.00
Autopilot
Details
       

 12-02-2013
1.50
Battery Charger
Details
     

 12-01-2013
0.00
Flying Phase I
Details
       

 11-30-2013
0.00
Flying Phase I
Details
       

 11-29-2013
0.00
Flying Phase I
Details
       

 11-29-2013
0.00
Flying Phase I
Details
       

 11-29-2013
3.00
10 Hour Oil Change
Details
     

 11-28-2013
0.00
Flying Phase I
Details
       

 10-27-2013
16.00
Replaced Fuel Pump and added Cooling SHroud
Details
       

 10-11-2013
1.00
First Flight
Details
       

 09-15-2013
6.00
OAT, Wingtips, and Empennage Fairings
Details
       

 09-14-2013
6.00
Trim
Details
       

 09-08-2013
4.00
Control Surfaces
Details

 09-05-2013
2.00
Trim
Details

 09-01-2013
4.00
Magnetometer, Flaps, and Flap Sensor
Details
       

 08-25-2013
6.00
Fuel Testing & Spinner
Details
       

 08-24-2013
6.00
Control Sticks & Fuel Lines
Details
     

 07-16-2013
2.00
FSDO Airworthiness Inspection
Details
     

 07-14-2013
1.00
Seat Belts and Fire bottle mount
Details
       

 07-14-2013
4.00
Misc final assembly
Details
       

 07-14-2013
4.00
Installed interior panels
Details
       

 07-14-2013
1.00
Final Preparation for FSDO inspection
Details

 07-13-2013
4.00
Remount Prop & Oil Cooler Valve
Details
       

 07-12-2013
2.00
Finished Stick Grip Wiring
Details
       

 07-11-2013
3.00
Take prop off and remove plug
Details
       

 07-10-2013
2.00
First Engine Start
Details
     

 07-07-2013
6.00
Interior Panels & Fuel Testing
Details
       

 07-06-2013
8.00
Battery Hookup, Re-install EFIS, & Ground Power
Details
       

 07-04-2013
3.00
Seat Belts, Interior Panel, and Lens
Details
       

 07-03-2013
4.00
Weight & Balance
Details
       

 07-02-2013
2.00
Seat Belts
Details
       

 07-02-2013
1.00
Baffle and Wing
Details
       

 07-02-2013
2.00
Access Panel
Details
       

 07-01-2013
2.00
Brakes
Details
       

 06-30-2013
3.00
Cowl
Details
     

 06-29-2013
2.00
Right Wing Root and Pilot Stick
Details
       

 06-29-2013
2.00
Empennage Fairing and Covers
Details
       

 06-28-2013
2.00
Left Bottom Wing Root & Fuel Vent
Details
       

 06-24-2013
2.00
Backup Alternator, Fuel Gage, Fuel Vent
Details
       

 06-23-2013
2.00
Troubleshoot Annunciator
Details
       

 06-23-2013
1.00
Riveted Wing Roots & Brakes
Details
       

 06-23-2013
1.00
Ram Air
Details
       

 06-23-2013
2.00
Heater Hoses and Wing Tip
Details
       

 06-22-2013
3.00
Wing Root Electrical Connections
Details
     

 06-22-2013
1.00
RIght Wing Tip Installed
Details
       

 06-22-2013
1.00
Nav/Strobe Lighting
Details
       

 06-22-2013
2.00
Engine Baffle
Details
       

 06-01-2013
5.00
Oil Lines
Details
       

 05-29-2013
6.00
Brakes
Details
       

 05-28-2013
4.00
Starter and Alternator Wiring
Details
       

 05-27-2013
4.00
Oil Cooler, ANL Fuses, Left Mag
Details
       

 05-19-2013
3.00
Secure Prop Control Cable
Details
       

 05-19-2013
3.00
Oil Cooler Vent & Fuel and Oil Pressure Sensors
Details
       

 05-18-2013
6.00
Exhaust and Engine Sensors
Details
       

 05-17-2013
2.00
Oil Cooler, RMP Sensor, and Oil Pressure Switch
Details
       

 05-16-2013
2.00
Oil Breather Tube
Details
     

 05-16-2013
3.00
Fuel Lines
Details
       

 05-15-2013
4.00
Fuel Flow Sensor Mount and Ram Air Control Cable
Details
       

 05-14-2013
4.00
Fuel Flow Sensor Mount and Excess Fuel tube
Details
       

 05-13-2013
1.00
Elevator Control and Mixture Control
Details
       

 05-11-2013
3.00
Engine Sensors and Mixture Control Cable
Details
       

 05-09-2013
4.00
Mixture Control Cable
Details
     

 05-08-2013
6.00
Governor and Mixture Control Cables
Details
       

 05-06-2013
4.00
Engine Sensor Termination
Details
     

 05-04-2013
3.00
Fuel Injection and Purge Valve Control Cable
Details
       

 05-04-2013
3.00
Control Cables #2
Details
       

 05-03-2013
0.00
AFS 4500
Details

 05-02-2013
6.00
Control Cables
Details
       

 04-30-2013
3.00
Heater Control Cables & Purge Valve Control Cable
Details
       

 04-30-2013
3.00
Baffling
Details
       

 04-28-2013
3.00
Heat Shields and Heater Cable Adel Clamps
Details
       

 04-27-2013
3.00
Trim Heater Control Cables & Engine Instrumentatio
Details
       

 04-27-2013
4.00
Heat Shields for Control Cables
Details
       

 04-26-2013
1.00
GTN650 & Oil Pressure
Details
       

 04-25-2013
0.50
GTN650
Details

 04-23-2013
1.50
Engine Wiring
Details
     

 04-21-2013
8.00
Lower Console, Engine Mount, & Purge Valve
Details
       

 04-20-2013
7.00
Lower Console
Details
       

 04-17-2013
2.00
AFS EFIS and GTN650
Details
     

 04-16-2013
2.00
GPS Troubleshooting
Details
       

 04-15-2013
3.00
GTN650 Configuration
Details
       

 04-14-2013
8.00
Panel, Heat, Nav, and Magnetos
Details
       

 04-13-2013
8.00
Panel, GPS Antenna, and Magneto Timing
Details
       

 04-12-2013
1.00
Upgrade AFS 3400
Details
     

 04-11-2013
3.00
Finishing mounting the 4500s
Details
       

 04-10-2013
4.00
Install AFS EFIS Screens
Details
     

 04-08-2013
3.00
Panel
Details
       

 04-07-2013
8.00
Mags, Throttle Quadrant, Glareshield, Heater Contr
Details
       

 04-06-2013
8.00
Panel Wiring
Details
       

 04-05-2013
3.00
Panel Wiring
Details

 04-04-2013
2.50
Rudder Trim
Details

 04-03-2013
3.00
Left Panel Insert and Throttle Quadrant
Details
       

 04-02-2013
3.00
GTN650 Fan and Final Panel Wiring
Details
       

 04-01-2013
2.50
Center Panel
Details
     

 03-31-2013
8.00
Central Panel / Radio Stack
Details
       

 03-30-2013
6.00
Rudder Trim and Panel Switches
Details
       

 03-29-2013
5.00
Panel Wiring
Details

 03-28-2013
2.00
Battery Tray, Seat Release Arm, and Throttle Quadr
Details
       

 03-27-2013
2.00
Thread Throttle Lock and Baffle Rod
Details
       

 03-24-2013
4.00
Throttle Quadrant
Details
       

 03-24-2013
1.00
Rudder Trim and Alternate Static Air Switch
Details
       

 03-24-2013
2.00
Install Static, and Pitot Quick Disconnects, and A
Details
       

 03-23-2013
3.00
Spark Plug Wire Holders and Engine Mount Covers
Details
       

 03-23-2013
3.00
Baffle and Engine Heater
Details
       

 03-22-2013
1.50
Baffle Install
Details
     

 03-21-2013
2.00
Equipment Port Mapping
Details

 03-18-2013
2.00
Gemini and TS-83 wrining installation
Details
       

 03-17-2013
5.00
Continued panel installation
Details
       

 03-16-2013
5.00
Left Panel Wiring and Seat Levers
Details
       

 03-15-2013
5.00
Left Wing Root WIring and Overhead Inserts
Details
       

 03-12-2013
2.00
Elevator Trim and Overhead Inserts
Details
       

 03-11-2013
2.00
Installed 4 adel clamps in tail
Details
       

 03-10-2013
5.00
Wing Walk and Headliner Installation
Details
       

 03-10-2013
1.00
Installed foil insulation on the lower cowl
Details
     

 03-09-2013
3.00
Wing Tip, Baffles, Wiring Prep
Details
       

 03-09-2013
3.00
Pitot and AOA lines, Wing Root Connector
Details
       

 03-08-2013
1.00
Left Headliner
Details
     

 03-07-2013
2.00
Right Headliner
Details
       

 03-05-2013
1.00
Left Headliner
Details
     

 03-03-2013
6.00
Wing Tips
Details
       

 03-02-2013
3.00
Tail Light & Panel
Details
       

 03-02-2013
3.00
Pitot
Details
       

 02-25-2013
2.00
Antenna Cables and Drill Hole in Fuselage
Details
       

 02-24-2013
2.00
Tail Position & Strobe Light and Elevator Trim
Details
       

 02-24-2013
2.00
Insulation
Details
     

 02-24-2013
2.00
ADSB UAT, APRS, and ELT Antenna Installation
Details
       

 02-23-2013
4.00
Seats & Misc.
Details
       

 02-21-2013
1.00
Labeled Inserts and Clear Coat
Details
     

 02-20-2013
1.00
Paint Panel Inserts
Details
     

 02-17-2013
5.00
Seats, Wing Attach, & Overhead
Details
       

 02-16-2013
4.00
VP/X, Flap, and Transponder Antenna
Details
       

 02-10-2013
4.00
Left Wing and VP/X-Pro
Details
       

 02-09-2013
1.00
Wings Installation #2
Details
       

 02-09-2013
1.00
Final Wing Installation
Details
       

 02-08-2013
2.00
OAT
Details

 02-07-2013
2.00
Door Trim, OAT, and Hangar Cleanup
Details
       

 02-06-2013
2.00
Aileron Trim, Wing Wires, Rear Seat Air Vents
Details
       

 02-05-2013
2.00
AIleron Trim & Wing Wiring
Details
       

 02-03-2013
5.00
Ailerons & Flaps
Details
       

 02-02-2013
4.00
Transponder Antenna, Wing Connector, Ailerons
Details
       

 02-02-2013
1.00
Brake Fluid
Details
       

 01-30-2013
2.00
Comm Antenna & Aileron Gap Seal
Details
       

 01-29-2013
2.00
Left Comm Antenna Access Plate and Left Seat Rail
Details
       

 01-28-2013
2.00
Comm Antenna Access Plate
Details
     

 01-27-2013
3.00
Seats Rails, Insulation, and Comm Antenna cable ru
Details
       

 01-27-2013
0.00
Picked up last pieces to be painted
Details
     

 01-26-2013
5.00
Flap Switch, Rudder, Audio DB37, & Seat Rails
Details
       

 01-24-2013
1.00
Right Headliner Insert
Details
     

 01-23-2013
2.00
Passenger Headset Jacks
Details
     

 01-21-2013
1.00
Left Headliner Panel
Details
     

 01-20-2013
6.00
Wing Root Connectors & Audio Panel Connector
Details
       

 01-19-2013
4.00
Flap Sensor and Flaps
Details
       

 01-18-2013
0.00
Picked up the painted Wheel Pants
Details
       

 01-17-2013
2.50
Install Rudder and Elevators
Details
       

 01-15-2013
2.00
Taped Striping on Wheel Pants
Details
       

 01-14-2013
0.00
Paint Gray on Wheel Pants
Details
       

 01-13-2013
2.00
Panel Inserts
Details
       

 01-13-2013
2.00
Painted the Cabin Cover, Seat Access Cover, and Ba
Details
       

 01-13-2013
2.00
Finshing Riveting Nutplates and Attach Vertical St
Details
     

 01-12-2013
0.00
Tech Counselor Visit
Details
     

 01-12-2013
2.00
Tape Gray Line on Wheel Pants
Details
       

 01-12-2013
4.00
Install Reiff Engine Heaters
Details
       

 01-11-2013
0.00
White Paint on Wheel Pant
Details
     

 01-05-2013
4.00
Move Wings Back to the Hangar
Details
       

 01-04-2013
1.00
Countersink Wheel Pant Holes
Details
     

 01-03-2013
1.00
Marked up Panel Inserts
Details

 12-30-2012
4.00
VPX, NAV Antenna, and Horizontal
Details
       

 12-27-2012
2.00
Taping the Red Stripe on the Left Wing
Details
       

 12-27-2012
0.00
Painted Silver Stripe on Left Wing
Details
       

 12-22-2012
1.00
Tape Silver Stripe on Left Wing #2
Details
       

 12-22-2012
1.00
Tape Silver Stripe on Left Wing
Details
       

 12-16-2012
1.00
Swapped Left and Right Wing in Rotissorie
Details
       

 12-10-2012
1.00
Taped Right WIng for Outward Silver Stripes
Details
       

 12-09-2012
5.00
Taped Red and Sliver Stripes on Right Wing
Details
       

 12-09-2012
1.00
Started to install panel components
Details
       

 12-08-2012
0.00
Painted Gray on the Right Wing
Details
       

 12-08-2012
6.00
Left Wing Connector
Details
       

 12-06-2012
0.50
Attached Rudder Fairing Covers
Details
     

 12-05-2012
1.00
Prep wing for painting
Details
       

 12-03-2012
3.00
Taped gray areas on right wing
Details
       

 12-02-2012
0.00
Right Wing Paint
Details
       

 12-02-2012
4.00
Right Wing Connector #2
Details
       

 12-01-2012
5.00
Horizontal, Doors, and Mags
Details
       

 11-29-2012
2.00
Wing Root Connectors #2
Details
     

 11-27-2012
1.50
Assemble wing stands
Details
       

 11-26-2012
1.50
Left Wing Root Connector
Details
       

 11-25-2012
2.00
Moved Wings to the Paint Shop
Details
       

 11-24-2012
0.00
Moved Fuselage back to the hangar #3
Details
       

 11-24-2012
0.00
Moved Fuselage back to the hangar #2
Details
       

 11-24-2012
0.00
Moved Fuselage back to the hangar
Details
       

 11-20-2012
0.00
N#s and Red Stripe #2
Details
       

 11-20-2012
0.00
N#s and Red Stripe #1
Details
       

 11-18-2012
2.00
Clear Coat Panel Inserts and Clean Hangar
Details
       

 11-15-2012
1.00
Left Side N# Paint Mask
Details
     

 11-14-2012
3.00
Red Stripe on Left Side of Fuselage
Details
       

 11-13-2012
4.00
Taping Red Stripe on Fuselage
Details
       

 11-12-2012
1.50
Putting the doors on
Details
       

 11-11-2012
0.00
Silver Stripe and Clear Coat Painted on Fuselage
Details
       

 11-11-2012
1.00
Painted Instrument Panel & Hangar Cleaning
Details
       

 11-10-2012
1.50
Tape Silver Stripe
Details
       

 11-10-2012
4.00
Re-Painted Panel
Details
       

 11-09-2012
0.00
Phantom Pray Painted on Fuselage
Details
       

 11-04-2012
3.50
Taped the Phantom Gray line on Fuselage
Details
       

 11-03-2012
3.00
Panel Labeling
Details
       

 11-02-2012
0.00
White on Fueslage
Details
       

 11-02-2012
3.00
Painting Aerosport Panels
Details
     

 10-28-2012
4.50
Instrument Panel and Bafflers #2
Details
       

 10-27-2012
0.50
Remote Control for heater
Details
     

 10-27-2012
6.00
Instrument Panel and Baffles
Details
       

 10-25-2012
0.00
Sanding Primer on Fuselage
Details
       

 10-24-2012
0.00
Epoxy Primer on the Fuselage
Details
       

 10-24-2012
2.00
Baffles and Instrument Panel
Details
       

 10-23-2012
1.00
Taping the Fuselage
Details
       

 10-22-2012
2.00
Baffles and Instrument Panel
Details
       

 10-21-2012
6.00
Baffles & Instrument Panel
Details
       

 10-20-2012
1.50
Paint Screw Caps and Throttle Quadrant Insert
Details
       

 10-19-2012
2.00
Painted Baggage Door and Interior Door Handles
Details
       

 10-18-2012
2.00
Paint Panel Inserts & Filler on Instrument Panel
Details
       

 10-17-2012
2.00
Paint Aerosport Interior Panels and Panel Inserts
Details
       

 10-15-2012
2.00
Tape and Filler
Details
       

 10-14-2012
2.50
Cabin Cover Interior Paint
Details
       

 10-13-2012
4.00
Fuselage move to the paint shop
Details
       

 10-12-2012
2.50
Fuselage Prep
Details
       

 10-12-2012
0.00
Clear coating the tail feathers
Details
       

 10-11-2012
3.50
Silver on the tail feathers
Details
       

 10-10-2012
0.00
Phantom Gray on the tail feathers
Details
       

 10-09-2012
4.00
Covered the parts and painted the red striping
Details
       

 10-08-2012
2.50
Finish Taping and Re-Hanigng Parts
Details
       

 10-07-2012
5.00
Tape the Horitzontal and Vertical
Details
       

 10-06-2012
5.00
Doors, Cabin Cover, Stick, and a little proseal
Details
       

 10-05-2012
2.00
White Paint - Tail Feathers & Cowl
Details
       

 10-04-2012
2.00
Primer - Tail Feathers & Cowl
Details
       

 10-03-2012
2.50
Paint Prep #2 - Tail Feathers and Cowl
Details
       

 10-02-2012
3.50
Paint Prep - Tail Feathers & Cowl
Details
       

 10-01-2012
1.00
Stick & Nose Wheel
Details
       

 09-30-2012
5.00
Sticks and Cabin Cover Door Frame
Details
       

 09-29-2012
4.00
Transport to the Painter
Details
       

 09-29-2012
4.00
Stick, Nose Wheel, & Cabin Cover
Details
       

 09-28-2012
2.50
Rudder, Interior Panels, & Horizontal
Details
       

 09-27-2012
2.60
Stick Wiring & Cleaning Tail Feathers
Details
       

 09-26-2012
2.00
Doors, Stick Wiring, and Tail Feather Cleaning
Details
       

 09-25-2012
2.50
Doors, Cowl, and Scoop
Details
       

 09-24-2012
2.50
Doors, Scoop, and Hangar Lights
Details
       

 09-23-2012
6.00
Doors & Interior #3
Details
       

 09-22-2012
3.00
Interior Panels
Details
     

 09-21-2012
0.00
Seats
Details
       

 09-19-2012
2.00
Doors and Interior #2
Details
       

 09-18-2012
2.50
Doors and Interior Panels
Details
       

 09-16-2012
6.50
Scoop & Lights
Details
       

 09-15-2012
8.00
Doors, Scoop, and Lights
Details
       

 09-14-2012
2.50
Doors & Interiors
Details
       

 09-13-2012
2.50
Aerosport Interior and Scoop
Details
       

 09-11-2012
2.50
Doors and Scoop
Details
       

 09-10-2012
2.50
Door Hinge Covers & Doors
Details
       

 09-06-2012
2.00
OAT, Doors, Scoop, and Rudder
Details
       

 09-05-2012
2.50
Cowl & Doors
Details
       

 09-03-2012
8.00
Cowl Finishing
Details
       

 09-02-2012
8.00
Cowl & Eppennage
Details
       

 09-01-2012
4.00
Wing Access Panels
Details
       

 09-01-2012
4.00
Cowl and Wing Access Panels
Details
       

 08-31-2012
2.50
Wing Access Panel & Cabin Cover
Details
       

 08-30-2012
2.50
Cowl, Doors, and Elevators
Details
       

 08-29-2012
2.50
Cowl & Doors
Details
       

 08-28-2012
2.50
Cowl and Scoop #2
Details
     

 08-27-2012
1.00
Doors and Door Frame
Details
       

 08-27-2012
1.50
Cowl and Scoop
Details
       

 08-26-2012
4.00
Doors
Details
       

 08-26-2012
4.00
Cowl
Details
       

 08-25-2012
5.00
Cabin Cover, Cowl, & Aerosport Products Panels
Details
       

 08-25-2012
2.00
Cabin Cover & Door Windows
Details
       

 08-24-2012
2.50
Cowl, Baffles, and Cabin Cover
Details
       

 08-23-2012
2.50
Oil Door, Cowl, and Cabin Cover
Details
       

 08-22-2012
2.50
Doors, Cabin Cover, and Cowl
Details
       

 08-21-2012
2.50
Door Windows Again!
Details
       

 08-20-2012
2.50
Door Windows
Details
       

 08-19-2012
7.00
Nose Wheel, Doors, Cabin, and Cowl
Details
       

 08-18-2012
2.00
Nose Wheel Pant & Fairings
Details
       

 08-18-2012
4.00
Doors & Windows
Details
       

 08-18-2012
2.00
Cabin Cover
Details
       

 08-17-2012
2.50
Doors, Flaps, and Cabin Cover
Details
       

 08-16-2012
3.00
Doors, Flaps, Nose Wheel Pants, and Cabin Cover
Details
       

 08-15-2012
3.50
Door Windows and Cabin Cover
Details
       

 08-14-2012
3.00
Door Windows
Details
     

 08-13-2012
2.00
Doors, Cabin Cover, and Hangar Lighting
Details
       

 08-12-2012
5.00
Doors, Nose Wheel Pants, & Cabin Cover #2
Details
       

 08-11-2012
6.00
Doors, Nose Wheel Pants, & Cabin Cover
Details
       

 08-10-2012
2.50
Doors
Details
     

 08-09-2012
2.50
Door Windows
Details
       

 08-08-2012
2.50
Doors and Windows #2
Details
       

 08-07-2012
3.00
Doors and Door Windows
Details
       

 08-06-2012
2.50
Doors, Nose Wheel Pant, and Cowl
Details
       

 08-05-2012
5.00
Doors. Nose Wheel, Cowl. & Cabin Cover
Details
       

 08-04-2012
6.00
Cowl, Doors, and Nose Wheel
Details
       

 08-03-2012
2.00
Sanded Oil Filler Door Opening
Details
       

 08-02-2012
2.50
Cowl
Details
       

 08-01-2012
3.00
Cowl, Doors, and Wheel Pants
Details
       

 07-31-2012
2.50
Cowl and Cabin Cover
Details
       

 07-30-2012
2.50
Cabin Cover and Cowl
Details
       

 07-29-2012
6.50
Doors and Cowl
Details
       

 07-28-2012
3.50
Doors and Oil Door
Details
       

 07-28-2012
4.00
Cowls
Details
       

 07-27-2012
2.50
Doors #8
Details
     

 07-26-2012
2.50
Body Icing on Door Interiors #7
Details
     

 07-21-2012
0.00
Oshkosh
Details

 07-18-2012
3.00
Doors #6
Details
     

 07-16-2012
3.00
Doors #5
Details
       

 07-15-2012
0.00
Seats
Details
       

 07-15-2012
6.00
Cabin Cover & Doors #4
Details
       

 07-14-2012
8.00
Doors & Cabin Cover #3
Details
       

 07-13-2012
3.00
Left Door Lock
Details
     

 07-12-2012
3.00
Door Lock and Cabin Cover
Details
       

 07-11-2012
3.00
Door Lock and Nose Wheel Pant
Details
       

 07-09-2012
2.50
Cabin Cover & Nose Wheel Pant #2
Details
       

 07-08-2012
6.00
Cabin Cover & Nose Wheel
Details
       

 07-07-2012
7.00
Wheel Pants and Cabin Cover
Details
       

 07-06-2012
4.00
Nose Wheel Pant and Wing Tip
Details
       

 07-05-2012
2.50
Wing Tip, Doors, and Cabin Cover
Details
       

 07-04-2012
8.00
Cabin Cover and Wheel Pants
Details
       

 07-03-2012
2.50
Doors
Details
       

 07-02-2012
3.00
Wheel Pants & Doors
Details
       

 07-01-2012
7.00
Cabin Cover, Doors, & Wheel Pants
Details
       

 06-30-2012
8.00
Cabin Cover, Doors, & Wheel Pants
Details
       

 06-29-2012
1.00
Windscreen
Details
     

 06-28-2012
1.00
Windscreen
Details
     

 06-27-2012
3.00
Windscreen, Wheel Pants, & Gemini PFD
Details
       

 06-26-2012
3.00
Windscreen & Doors
Details
     

 06-25-2012
3.00
Windows, Wing Tips, & Wheel Pants
Details
       

 06-24-2012
2.00
Wing Tip Lense
Details
       

 06-24-2012
6.00
Windows #4
Details
       

 06-23-2012
8.00
Windows #3
Details
     

 06-22-2012
3.00
Windows #2
Details
       

 06-21-2012
3.00
More micro on the windows
Details
       

 06-20-2012
2.50
Windscreen Fairing
Details
     

 06-19-2012
2.00
Micro to Windscreen and Wheelpants
Details
       

 06-18-2012
2.00
Sand Windscreen Fairings
Details

 06-17-2012
1.00
Glareshield Template
Details
     

 06-17-2012
6.00
Fiberglass window joints
Details
       

 06-16-2012
6.00
Fiberglass Windscreen
Details
       

 06-15-2012
2.00
Nose Wheel
Details
     

 06-14-2012
2.00
Windscreen and Nose Wheel
Details
       

 06-12-2012
2.50
Tape the windows, prep for fiberglassing the joint
Details
       

 06-10-2012
6.00
Windshield, Nose Wheel Pants, & Wingtip
Details
       

 06-09-2012
5.00
Front Window
Details
       

 06-07-2012
2.00
Rudder trim and cabin cover window brace
Details
       

 06-07-2012
1.00
Empennage Fairing and Wing Tip
Details
       

 06-06-2012
2.00
Trim Front Window
Details
     

 06-05-2012
1.50
Rear Windows and Wing Tips
Details
       

 06-04-2012
2.00
Empennage Fairing, Flaps, and Wing Tip
Details
       

 06-03-2012
3.00
Rear Windows
Details
       

 06-03-2012
4.00
Empennage Fairing, Wing Tips, and Flaps
Details
       

 06-02-2012
6.00
Cabin Cover and WIng Tips
Details
       

 05-31-2012
3.00
Sanding the horizontal, flaps, and empennage fairi
Details
       

 05-30-2012
3.00
Horizontal, Flasp, and Empennage Fairing
Details
       

 05-28-2012
6.00
More sanding and vertical nutplates
Details
       

 05-27-2012
3.00
More sanding......
Details
       

 05-24-2012
1.00
Sanded horizontal fairings
Details
     

 05-22-2012
2.00
Second smooth prime coat
Details
       

 05-18-2012
0.00
Sheppard AFB and Transition Training
Details
     

 05-15-2012
2.00
Horizontal Fairing
Details
       

 05-14-2012
2.00
First smooth prime coat on fairings
Details
       

 05-13-2012
6.00
Fairings and Tail Removal
Details
       

 05-12-2012
6.00
Fairings, Nose Wheel Pant, Tail Electrical, Cabin
Details
       

 05-11-2012
3.00
More Sanding & Micro
Details
       

 05-10-2012
3.00
Rear Window, Headliner, and Wheel Pants
Details
       

 05-08-2012
3.00
Fairings and more Fairings
Details
       

 05-07-2012
2.00
Empennage Fairing
Details
       

 05-06-2012
5.00
Some riveting, some sanding, more micro, and more
Details
       

 05-05-2012
9.00
Last fuselage skin and more fairing work
Details
       

 05-04-2012
3.00
A bunch of misc tasks
Details
       

 05-03-2012
2.00
Countersink APRS Doubler & Pull GPS Antenna Cable
Details
       

 05-02-2012
3.00
Ground Power & Rudder Fairing
Details
       

 05-01-2012
1.50
Aux Battery Charger
Details
       

 04-30-2012
2.00
Vertical Stab Fairing and Battery Ground Terminal
Details
       

 04-29-2012
7.00
Battery Connections and Fairing Sanding
Details
       

 04-28-2012
8.00
Ground Power & More Fairing Sanding
Details
       

 04-27-2012
2.50
Ground Power Plug & Fairing Sanding
Details
       

 04-26-2012
2.00
ELT Doubler and Vertical Fairing
Details
       

 04-24-2012
3.00
GPS Doublers #2 and More Micro
Details
       

 04-23-2012
2.00
GPS Doublers
Details
       

 04-22-2012
5.00
More micro filler and dimple top skin
Details
       

 04-21-2012
6.00
ELT Installation
Details
       

 04-20-2012
1.00
ELT Bracket
Details
       

 04-19-2012
0.00
Steve Stella
Details

 04-18-2012
2.00
Installing adel clamps in the tail
Details
     

 04-16-2012
2.00
Overhead Wiring
Details
       

 04-15-2012
4.00
Static Ports and Empennage Wiring
Details
       

 04-15-2012
2.00
Static Ports and Baggage Bulkhead
Details
       

 04-14-2012
6.00
Misc Wiring
Details
       

 04-13-2012
2.00
Pull Wiring and NACA Valve Installation
Details
       

 04-11-2012
1.00
NACA Air Vent Valve Installation
Details
       

 04-11-2012
1.00
Battery Contactor Wiring
Details
       

 04-11-2012
1.00
Autopilot Pitch Servo Wired
Details
       

 04-09-2012
3.00
Autopilot Wiring
Details
       

 04-08-2012
5.00
Fairings, ADSB, ADSB Antenna
Details
       

 04-07-2012
2.00
Trim Windshield and Glaresheild Template
Details
       

 04-07-2012
0.50
Tech Counselor Visits
Details
       

 04-07-2012
1.00
Removing Wings
Details
       

 04-06-2012
4.00
WIng Root Access Panels
Details
       

 04-06-2012
2.00
Wheel Pants #15
Details
       

 04-05-2012
1.00
Cleanup
Details

 04-04-2012
2.00
Wheel Pants #14
Details
       

 04-03-2012
3.00
Wheel Pants #13
Details
       

 04-02-2012
1.00
Wheel Pants #12
Details
       

 04-02-2012
1.00
Wheel Pants #11
Details
     

 04-02-2012
1.00
Wheel Pants #10
Details
       

 04-01-2012
4.00
Wheel Pants #9
Details
       

 03-31-2012
1.00
Wheel Pants #8
Details
       

 03-31-2012
5.00
Gear Leg Fairings
Details
       

 03-27-2012
3.00
Wheel Pants #7
Details
       

 03-26-2012
1.00
Wheel Pants #6
Details
     

 03-25-2012
6.00
Wheel Pants #5
Details
       

 03-18-2012
2.00
Wheel Pants #4
Details
       

 03-18-2012
4.00
Wheel Pants #3
Details
       

 03-18-2012
0.00
Airplane Jacks
Details
       

 03-17-2012
3.00
Wheel Pants #2
Details
       

 03-17-2012
0.50
Farings #5
Details
       

 03-15-2012
1.50
Wheel Pants and Pitch Servo Mount
Details
       

 03-15-2012
1.50
Fairings #4
Details
       

 03-14-2012
2.00
Fairings #3 and Wheel Pants
Details
       

 03-13-2012
2.00
Fairings #2
Details
       

 03-12-2012
0.50
Riveted Horizontal Fairings
Details
       

 03-12-2012
2.00
Glassing tail fairings
Details
       

 03-11-2012
4.00
Tail fairings
Details
       

 03-09-2012
1.00
ADSB DB-37
Details
     

 02-28-2012
2.00
Crossbow Magnetometers wired
Details
       

 02-27-2012
1.50
Install Magentometers
Details
     

 02-26-2012
4.00
Magnetomer Tray
Details
       

 02-25-2012
6.00
Misc Panel
Details
       

 02-23-2012
1.00
Magnetometers
Details
     

 02-22-2012
1.50
Annuciator Wiring Change
Details
     

 02-21-2012
1.50
Auto Pilot Switch
Details
       

 02-19-2012
4.00
More Panel Wiring
Details
     

 02-18-2012
5.00
CO & CLA Wiring, Upgrading Adel Clamps
Details
       

 02-16-2012
2.00
CO Wiring
Details
     

 02-15-2012
0.00
Air Compressor Back
Details
     

 02-12-2012
4.00
Ignition Switch Wiring, Magnetometer Mount, & Door
Details
       

 02-05-2012
5.00
Panel Switch Wiring and Door Remount
Details
       

 02-04-2012
5.00
Panel Switch Wiring and Compressor Repair
Details
     

 02-02-2012
3.00
Switch Wiring
Details
     

 01-29-2012
4.00
Switch & LED wiring
Details
       

 01-28-2012
6.00
Switch & LED Wiring
Details
       

 01-24-2012
1.50
Panel switch assembly
Details
     

 01-22-2012
4.00
Panel Supports
Details
       

 01-21-2012
4.00
Radio Stack Support
Details
       

 01-17-2012
2.00
More nutplates on the panel
Details
       

 01-15-2012
4.00
Misc Panel Tasks
Details
       

 01-11-2012
2.00
Door switches and Fuel Lines
Details
       

 01-10-2012
2.00
Panel Wiring
Details
     

 01-09-2012
1.50
Right Side Panel Wiring
Details
     

 01-08-2012
5.00
Panel & Wiring
Details
       

 01-07-2012
6.00
Panel Inserts & Misc
Details
       

 01-04-2012
0.00
Center Panel Insert
Details
     

 01-01-2012
3.50
Throttle Quadrant, Upper Fuselage Assembly, & Cabi
Details
       

 12-31-2011
4.00
More Panel #2 and Riveting
Details
       

 12-28-2011
2.00
Cutting holes in the carbon fiber panel
Details
       

 12-26-2011
4.00
More wiring and some riveting
Details
       

 12-25-2011
0.00
Panel Layout
Details
     

 12-24-2011
4.00
Pulling wire
Details
       

 12-24-2011
2.00
Panel Inserts and Firewall Passthrough
Details
     

 12-23-2011
0.00
Picked up panel inserts from Aerosport Products
Details
     

 12-20-2011
3.00
Riveting the upper fuselage assembly
Details
       

 12-19-2011
4.00
Started to install upper fuselage assembly
Details
       

 12-18-2011
6.00
More Panel Wiring
Details
       

 12-17-2011
3.00
Wired G3i Ignition
Details
       

 12-17-2011
2.00
More wiring support
Details
       

 12-17-2011
3.00
Manifold Pressure
Details
       

 12-14-2011
2.00
Cleaning up the wiring
Details
       

 12-13-2011
2.00
Wired Strobes Circuit & AFS EFIS
Details
     

 12-10-2011
4.00
Annunciator Board and Fuel Lines
Details
       

 12-04-2011
4.00
Fans and Door Relays
Details
       

 12-03-2011
4.00
Installed shelf for ADSB and antenna doubler
Details
       

 12-03-2011
1.00
Install defroster fans
Details
       

 11-30-2011
2.00
Wire Mgmt and Fuel Lines
Details
       

 11-29-2011
2.00
Finish radio stack mount
Details
       

 11-28-2011
2.50
Radio Stack Mount
Details
       

 11-27-2011
3.00
Install insulation and start radio stack mount
Details
       

 11-26-2011
6.00
Installed brake lines
Details
       

 11-25-2011
4.00
Moved Upper Fueselage Assembly back to the hangar
Details
       

 11-24-2011
6.00
More panel work
Details
       

 11-15-2011
2.00
Firewall Insulation
Details
       

 11-14-2011
6.00
Re-plumbing the fuel lines
Details
       

 11-06-2011
10.00
Working on the harness
Details
       

 11-01-2011
2.00
Baffling & Battery
Details
       

 10-30-2011
4.00
Misc Catch Up Items
Details
       

 10-29-2011
6.00
GTN 650, PSE 8000B, and GTX 327 wiring
Details
       

 10-27-2011
0.00
AFS AP arrives
Details

 10-23-2011
1.00
Tail weight
Details
       

 10-23-2011
1.00
Jack Stands
Details
     

 10-23-2011
2.00
Baffle Re-work
Details
       

 10-23-2011
2.00
Alternator Spacers Re-Work
Details
       

 10-09-2011
4.00
Install Starter and Alternator
Details
       

 10-09-2011
2.00
Battery Cables
Details
       

 10-02-2011
4.00
AFS Main EFIS Connectors Completed
Details
       

 09-25-2011
3.00
Started fuselage electrical
Details
       

 09-25-2011
3.00
Misc items
Details
       

 09-17-2011
2.00
VP-X J-2 Connector
Details
       

 09-14-2011
4.00
VP-X J1 Connector Completed
Details
       

 09-11-2011
10.00
Panel Wiring #2
Details
       

 09-05-2011
20.00
Wiring of VP-X power connectors
Details
     

 08-29-2011
1.50
Mounting panel devices #2
Details
       

 08-29-2011
0.50
Drilling out stainless shields
Details
     

 08-28-2011
4.00
Mounting more devices
Details
       

 08-27-2011
6.00
VP-X, Electronic Ignition, Wire Pass Throughs
Details
       

 08-26-2011
2.00
VP-X Pro installation
Details
       

 08-24-2011
1.50
Door Handles
Details
       

 08-23-2011
2.00
Reassmeble of door handles
Details
     

 08-22-2011
2.00
Re-hang left exhaust
Details
       

 08-21-2011
2.00
APRS Antenna Doubler
Details
       

 08-20-2011
8.00
Antenna Doublers
Details
       

 08-19-2011
2.00
Installing the VP-X Pro
Details
       

 08-19-2011
0.00
Chloe
Details
       

 08-15-2011
2.00
Misc Panel Tasks
Details
       

 08-14-2011
5.00
Baffles #20
Details
       

 08-13-2011
3.00
Wing Tips #7
Details
       

 08-13-2011
3.00
Baffles #19
Details
       

 08-12-2011
2.00
Baffles #18
Details
       

 08-08-2011
3.00
Baffles #17
Details
       

 08-07-2011
4.00
Baffles #16
Details
       

 08-06-2011
0.00
Avionics started to arrive
Details
       

 08-05-2011
1.00
Wing Tips #5
Details
       

 08-05-2011
2.00
Air ramps fabricated
Details
       

 08-03-2011
2.00
Wing Tips & Rudder Stop
Details
       

 08-01-2011
0.00
Airventure
Details

 07-17-2011
4.00
Exhaust #4
Details
       

 07-16-2011
3.00
Exhaust #3
Details
       

 07-14-2011
1.00
AFS CHT Installation
Details
       

 07-13-2011
2.00
Exhaust #2
Details
       

 07-11-2011
2.00
Baffles #15
Details
       

 07-10-2011
1.00
Match drill, dimple, and primed fairing supports
Details
     

 07-10-2011
4.00
Drain oil, install exhaust pipes, and EGT sensors
Details
       

 07-09-2011
0.10
Dimple Rudder for Fairing
Details
     

 07-08-2011
1.00
Wing Root Faring -Redux
Details
       

 07-08-2011
2.00
Rudder Fairing and Strobe
Details
       

 07-08-2011
1.00
Nav Lights
Details
       

 07-07-2011
1.00
Baffles #14 and Wing Tip Lights
Details
       

 07-06-2011
2.00
Baffles #13
Details
     

 07-04-2011
2.00
Baffles #12
Details
       

 07-03-2011
5.00
Baffles #11
Details
       

 07-02-2011
4.00
Baffles #10
Details
       

 07-01-2011
2.00
Baffles #9
Details
       

 06-30-2011
0.50
Baffles #8
Details
       

 06-30-2011
0.50
Baffles #7
Details
       

 06-30-2011
1.00
Baffles #6
Details
       

 06-29-2011
2.00
Baffle #5
Details
       

 06-27-2011
2.00
Wing Tip & Baffle
Details
       

 06-26-2011
2.00
Wing Tips #4
Details
       

 06-26-2011
2.00
Right Wing Root Faring
Details
     

 06-25-2011
1.00
Left Wing Root Fairing
Details
     

 06-21-2011
1.00
Aileron Trim #2
Details
     

 06-19-2011
4.00
Wing Tip #4, Aileron Trim
Details
       

 06-18-2011
4.00
Wing Tips #3
Details
       

 06-17-2011
1.00
Wing Tips #2
Details
       

 06-16-2011
0.00
New Compressor
Details
       

 06-13-2011
1.50
Cowl #2
Details
       

 06-12-2011
2.00
Wing Tips
Details
       

 06-12-2011
2.00
Wing Root Fairings #4
Details
       

 06-12-2011
2.00
Cowl
Details
       

 06-10-2011
1.00
Wing Root Fairings #3
Details
       

 06-10-2011
0.00
Technical Counselor Visit
Details
     

 06-09-2011
2.00
Cowl, Wings, and Rudder
Details
       

 06-07-2011
2.50
Wing Root Fairings #2
Details
       

 06-06-2011
2.00
Wing Root Fairings
Details
       

 06-05-2011
5.00
Flaps and Ailerons
Details
       

 06-04-2011
2.00
Wing Attach
Details
       

 06-04-2011
2.00
Aileron Pushrods
Details
       

 06-04-2011
2.00
Aileron and Flaps
Details
       

 06-01-2011
1.00
Seat Supports
Details
     

 05-31-2011
2.00
Wing Attach and Ailerons
Details
       

 05-28-2011
3.00
Cowl and Wing Attach
Details
       

 05-27-2011
1.00
Cowl Mod and Wing Fairings
Details
       

 05-26-2011
2.00
Attaching Cabin Cover
Details
     

 05-25-2011
2.00
Wing Attach and Cabin Cover Attach
Details
       

 05-24-2011
2.00
Cabin Cover and Cowl #11
Details
       

 05-23-2011
2.00
Cabin Cover and Cowl #10
Details
       

 05-22-2011
6.00
Cabin Cover and Cowl #9
Details
       

 05-21-2011
6.00
Cabin Cover and Cowl #8
Details
       

 05-20-2011
2.00
Cabin Cover #7
Details
       

 05-19-2011
2.00
Cabin Cover #6 and Headliner
Details
       

 05-18-2011
2.00
Cabin Cover and Cowl #5
Details
     

 05-17-2011
2.00
Cabin Cover and Cowl #4
Details
       

 05-15-2011
5.00
Cabin Cover and Cowl #3
Details
       

 05-14-2011
6.00
Cabon Cover and Cowl #2
Details
       

 05-13-2011
2.00
Cabin Cover - one more time #4 / Bottom Cowl
Details
       

 05-12-2011
2.00
Cabin Cover - one more time #3
Details
       

 05-10-2011
2.00
Ram Air Mod
Details
       

 05-10-2011
2.00
Cabin Cover - one more time #2
Details
       

 05-09-2011
2.00
Cabin Cover - one more time
Details
       

 05-08-2011
4.00
Cabin cover and cowl scoop
Details
       

 05-07-2011
3.00
Cowl Hinges
Details
       

 05-07-2011
4.00
Cowl and Cabin Cover
Details
       

 05-05-2011
2.50
Upper Cowl
Details
       

 05-03-2011
2.00
Cowl Pin Hinge Covers #2
Details
       

 05-03-2011
1.50
Baffles #4
Details
       

 05-01-2011
0.75
Empennage Fairings #4
Details
       

 05-01-2011
2.00
Cowl Pin Hinge Covers
Details
       

 05-01-2011
2.00
Cowl Hinges
Details
       

 05-01-2011
2.00
Cabin Cover and Cowl Fairings
Details
       

 05-01-2011
1.00
Baffle #3
Details
     

 04-30-2011
6.00
Cabin Cover, Empennage Fairing, & Cowl
Details
       

 04-28-2011
2.00
Empennage Fairings #3
Details
       

 04-17-2011
2.00
Overhead #5
Details
       

 04-17-2011
3.50
Empennage fairings #2
Details
       

 04-16-2011
1.00
Rudder
Details
     

 04-16-2011
1.50
Overhead #4
Details
       

 04-16-2011
1.00
Install Brakes
Details
       

 04-16-2011
1.00
Elevator Fairings
Details
       

 04-14-2011
2.00
FIlling the cowl
Details
       

 04-12-2011
2.00
Cowl Scoop
Details
     

 04-10-2011
5.00
Overhead #3
Details
       

 04-09-2011
5.00
Cowl #8
Details
     

 04-07-2011
2.00
Cowl #7
Details
       

 04-05-2011
2.00
Cowl #6
Details
       

 04-03-2011
3.00
Cowl #5
Details
       

 04-02-2011
5.00
Cowl #4
Details
       

 03-31-2011
2.00
Baffles #2
Details
       

 03-29-2011
2.00
More Cowl work #3
Details
       

 03-27-2011
3.00
More Cowl work #2
Details
       

 03-26-2011
3.00
More Cowl work
Details
       

 03-24-2011
3.00
Bottom Cowl
Details
       

 03-22-2011
2.00
Top Cowl
Details
       

 03-22-2011
1.00
Bottom Cowl and Inlet Ramps
Details
       

 03-20-2011
4.00
Bower Ram Air - Throttle/Mixture Cable Bracket
Details
       

 03-20-2011
0.25
Baffles
Details
     

 03-19-2011
5.00
Overhead Console #2
Details
       

 03-17-2011
2.00
Overhead Console
Details
       

 03-15-2011
2.00
Routing Elevator Trim Cables
Details
       

 03-13-2011
3.00
Misc Empennage Parts
Details
       

 03-12-2011
2.00
Trim Bellcrank Assembly #2
Details
       

 03-12-2011
2.00
Trim Bellcrank Assembly #1
Details
       

 03-12-2011
1.00
Elevators
Details
     

 03-10-2011
1.00
Vertical Stabilizer
Details
       

 03-10-2011
2.00
Elevator Push Rod
Details
       

 03-08-2011
2.00
Trimming aft edge of top cowl
Details
       

 03-08-2011
2.00
Forward Cowl Trimming
Details
       

 03-05-2011
1.50
Horizontal Stabilizer
Details
     

 03-05-2011
0.50
Cowl Trimming
Details
     

 03-05-2011
1.50
Bolting the horiztontal to the empennage
Details
       

 03-03-2011
2.00
Horizontal Stabilizer and Cowl
Details
       

 03-01-2011
1.00
Rudder Cable Fairings
Details
       

 03-01-2011
1.25
Hang the Propeller
Details
       

 02-27-2011
3.00
Spinner Completion and Rudder Fairing
Details
       

 02-26-2011
3.00
Spinner Filler Plates
Details
       

 02-22-2011
2.00
Nav Antenna Doubler & Spinner Filler Plate
Details

 02-20-2011
3.00
Spinner, Cowl, and NAV Antenna Doubler
Details
       

 02-19-2011
0.00
Brad's ROTC Air Force Dining Out
Details
       

 02-18-2011
1.00
Spinner #5
Details
       

 02-16-2011
2.00
Spinner
Details
       

 02-15-2011
0.25
FM-200 Uninstall
Details
     

 02-12-2011
2.00
Spinner, Cowl, and Rudder Fairings
Details
       

 02-12-2011
2.00
Rod Bower Ram Air
Details
       

 02-06-2011
2.00
Alternator
Details
       

 02-05-2011
2.00
Hang engine, install governor and alternator
Details
       

 02-05-2011
1.00
Engine #2
Details
       

 02-05-2011
1.00
Backup Alternator
Details
       

 01-29-2011
2.00
Engine #1
Details
       

 01-27-2011
1.00
Firewall Forward and Engine
Details
       

 01-22-2011
2.00
Spinner Prep #3 and Fuelage on it's gear
Details
       

 01-16-2011
1.00
Spinner Prep #2
Details
     

 01-15-2011
1.00
Working on mounting tires
Details
       

 01-15-2011
1.00
Spinner Prep
Details
       

 01-12-2011
2.00
Nose and Main Wheels
Details
       

 01-08-2011
2.00
Nose Wheel
Details
       

 01-08-2011
1.00
Brake Mounts
Details
       

 01-06-2011
2.00
Priming Prop and Gear Parts
Details
       

 01-05-2011
1.00
Preping Parts for Priming
Details
       

 01-02-2011
2.00
Nose Gear
Details
       

 01-01-2011
2.00
Re-doing the Cowl Hinges and Motor Mount
Details
     

 12-31-2010
3.00
Nose Wheel and Main Gear Legs
Details
       

 12-30-2010
4.00
Engine Mount and Main Tire Assembly
Details
       

 12-29-2010
0.25
Raising the Fuselage
Details
       

 12-28-2010
3.00
Remove Cabin Cover and Start Motor Mount Install
Details
       

 12-24-2010
2.00
Finished Left Door
Details
       

 12-24-2010
1.00
Door Strut and Snap Bushings
Details
       

 12-16-2010
0.00
Engine Arrival
Details
       

 12-05-2010
2.00
Left Door #9
Details
       

 12-04-2010
2.00
Left Door #8
Details
       

 12-01-2010
1.50
Propellor Back Plate
Details
       

 11-29-2010
1.00
Left Door #7
Details
     

 11-27-2010
1.50
Left Door #6
Details
     

 11-27-2010
0.00
Door #6 - Repeat
Details
     

 11-27-2010
0.00

Details

 11-26-2010
1.00
Left Door #5
Details
       

 11-26-2010
2.00
Left Door #4
Details
       

 11-25-2010
2.00
Left Door Hardware Fabrication
Details
       

 11-22-2010
1.00
Left Door - Safety Latch
Details
       

 11-15-2010
1.50
Left Door #3
Details
       

 11-14-2010
2.00
Left Door #2
Details
       

 11-13-2010
2.00
Left Door
Details
       

 11-09-2010
1.00
More Doors
Details
       

 11-07-2010
3.00
More Right Door Fitting
Details
       

 11-06-2010
0.00
Let there be heat
Details
     

 11-03-2010
1.00
Right Door
Details
     

 10-30-2010
3.00
Sub Panel Access Hole and VP-200 CU
Details
       

 10-25-2010
1.50
Misc Sub Panel Supports
Details
       

 10-24-2010
2.00
Back trimming left door
Details
       

 10-22-2010
1.50
Trimming the Right Door
Details
     

 10-21-2010
1.50
More sanding the door rain gutters
Details

 10-17-2010
0.00
High Performance Rating
Details
     

 10-16-2010
3.00
Start working on right door again
Details
       

 10-15-2010
1.00
Sanded door rain gutters
Details
       

 10-12-2010
0.00
Hangar Lighting
Details
       

 10-09-2010
4.00
Reinforce rain gutter with fiberglass
Details
       

 10-03-2010
0.00
Moving back into the garage
Details
     

 10-02-2010
0.00
The Move to the Airport
Details
       

 09-25-2010
0.00
Got keys to the hangar
Details
       

 09-14-2010
0.25
Sanding off micro balloons
Details
     

 09-13-2010
0.50
Put micro on door handle patch
Details
       

 09-12-2010
1.00
Removing flush handles and lowering door hinges
Details
       

 09-11-2010
0.00
New Cars and an OSU win over Miami
Details
       

 09-06-2010
4.00
Right Door Hardware #12
Details
       

 09-05-2010
2.00
Right Door Hardware #11
Details
     

 08-31-2010
0.00
BFR and Engine Order
Details

 08-28-2010
0.00
A day of flying RV-10s with friends
Details
       

 08-25-2010
0.50
Right Door Hardware #10
Details
       

 08-24-2010
1.00
Right Door Hardware #9
Details

 08-23-2010
1.00
Right Door Hardware #8
Details
       

 08-22-2010
2.00
Right Door Hardware #7
Details
       

 08-21-2010
2.00
Right Door Hardware #6
Details
       

 08-19-2010
0.50
Right Door Hardware #5
Details
     

 08-18-2010
1.50
Right Door Hardware #4
Details
       

 08-15-2010
2.00
Right Door Hardware #3
Details
       

 08-15-2010
2.00
Right Door Hardware #2
Details
       

 08-12-2010
1.00
Right Door Hardware
Details
       

 08-08-2010
2.00
Right Door #10 - Door Hardware
Details
       

 08-07-2010
1.00
Right Door #9 - Strut Attached
Details
       

 07-20-2010
1.00
Right Door #8
Details
       

 07-19-2010
1.00
Right Door #7
Details
     

 07-18-2010
3.00
Right Door #6
Details
       

 07-17-2010
1.50
Left Door Trim #2
Details
       

 07-11-2010
1.00
Left Door Trimming and OSH Prep
Details
       

 07-10-2010
2.00
Sub Panel Access Hole
Details
       

 07-08-2010
0.50
Sub Panel Access Hole for Radio Stack
Details
     

 07-07-2010
0.75
Misc Door stuff and a little panel work
Details
       

 07-06-2010
1.00
Right Door #5
Details
       

 07-02-2010
1.00
Right Door #4
Details
       

 07-01-2010
3.00
Trimming Doors #3
Details
       

 06-30-2010
1.00
Triming Right Door #2
Details
       

 06-29-2010
2.00
Trimming Left Door and second pass at Right Door
Details
       

 06-26-2010
2.00
Trimming Right Door and Forest of Tabs
Details
       

 06-20-2010
1.00
Epoxy Right Door Shells together
Details
       

 06-19-2010
1.00
Gas Strut Attach Doublers and Prepped Right Door
Details
       

 06-19-2010
2.00
Epoxy Left Door Shells together
Details
       

 06-18-2010
1.00
Cleco left door to fuselage
Details
       

 06-13-2010
3.00
Trim Doors #2
Details
       

 06-12-2010
0.50
Trim Doors
Details
     

 06-11-2010
0.00
Inventory Finish Kit
Details
     

 06-08-2010
0.00
Inventory Finish Kit
Details
       

 06-07-2010
1.00
Mounting Oild Cooler Mount and Finish Kit
Details
       

 06-05-2010
1.00
Oil Cooler Mount #2
Details
     

 06-03-2010
1.50
Oil Cooler Mount
Details
       

 06-02-2010
1.00
Tunnel Fairings #2
Details
       

 06-01-2010
1.00
Tunnel Fairings
Details
       

 05-31-2010
2.00
Power pass through - Tunnel Fairings
Details
       

 05-25-2010
1.00
Panel design
Details
     

 05-23-2010
2.00
Aileron torque tube and TruTrak roll servo
Details
       

 05-22-2010
2.00
Nutplates on the right wing
Details
       

 05-19-2010
0.00
Wiring Kits and racks
Details
     

 05-09-2010
2.00
Right Outboard Bottom Wing Skin #2
Details
     

 05-08-2010
2.00
Remote Starter Engaged Annuciator
Details
       

 05-02-2010
3.00
Right Outboard Bottom Wing Skin
Details
     

 05-01-2010
3.00
Right Inboard Bottom Wing Skin
Details
       

 04-25-2010
0.50
Left Rear Naca Vent
Details
       

 04-24-2010
0.75
Right Rear Naca Vent
Details
       

 04-20-2010
0.25
Power Schematic Review
Details
       

 04-17-2010
2.00
Aileron Pushrod - Right Aileron Gap Fairing #3
Details
       

 04-16-2010
0.50
Right Wing Aileron Gap Fairing #2
Details
       

 04-15-2010
1.00
Right Wing Aileron Gap Fairing
Details
       

 04-12-2010
1.00
Left Wing Access Plate Nutplates
Details
       

 04-10-2010
1.00
Left Aileron Brackets
Details
       

 04-10-2010
1.00
Attaching Left Aileron #2
Details
       

 04-10-2010
1.00
Attaching Left Aileron
Details
       

 04-09-2010
1.00
Left Torque Tube Installation
Details
     

 04-07-2010
1.00
Torque Tube Assembly #3
Details
     

 04-06-2010
0.75
Torque Tube Assembly #2
Details
     

 04-06-2010
0.75
Torque Tube Assembly #1
Details
     

 04-05-2010
1.00
Left Aileron Bellcrank
Details
       

 04-05-2010
0.00
Finish Kit Ordered
Details

 04-04-2010
2.00
Torque Tube to Bellcrank Pushrod
Details
       

 04-04-2010
1.00
Bellcrank to Aileron Pushrod
Details
     

 04-03-2010
4.00
Left Outboard Bottom Wing Skin
Details
       

 04-02-2010
3.00
Cabin Cover #4 and Pitot/Static
Details
       

 03-28-2010
3.00
Data Schematic and Wire Book
Details
     

 03-27-2010
2.00
Power Schematic Update
Details
     

 03-21-2010
2.00
Power Wire Book #4
Details

 03-19-2010
4.00
Cabin Cover Interior #4
Details
       

 03-16-2010
4.00
Cabin Cover #3
Details
       

 03-14-2010
3.00
Data Wire Book #1
Details

 03-12-2010
2.00
Power Wire Book #3
Details

 03-11-2010
4.00
Cabin cover interior #2
Details
     

 03-10-2010
1.00
Power Wire Book #2
Details

 03-09-2010
5.00
Cabin cover interior finishing #1
Details
       

 03-07-2010
2.00
Power Wire Book #1
Details

 03-05-2010
2.00
Cut holes in the bulkhead for the overhead console
Details
       

 03-04-2010
2.00
Rear NACA Vents
Details
       

 02-28-2010
2.00
Audio Schematic
Details
     

 02-27-2010
10.00
Avionics Data Schematic
Details
     

 02-12-2010
5.00
VP-200 Power Schematic
Details
     

 02-06-2010
0.00
Tech Counselor Visit
Details
     

 01-25-2010
1.00
Panel Planning
Details
     

 01-22-2010
1.00
Cabin Cover & Center Arm Rest
Details
       

 01-19-2010
1.00
Cabin Cover continued
Details
       

 01-18-2010
1.00
Match drilling cabin cover
Details
       

 01-15-2010
2.00
Cabin Cover #3
Details
       

 01-13-2010
2.00
Match drill Cabin Cover #2
Details
       

 01-12-2010
2.00
Mounting Andair Fuel Valve in Center Arm Rest
Details
       

 01-11-2010
1.00
Lower console side panel and Andair installation
Details
       

 01-10-2010
1.00
Attach throttle quadrant
Details
       

 01-09-2010
2.00
Match drill canopy cover
Details
       

 01-05-2010
1.00
Cowl Hinges #4
Details
     

 01-04-2010
1.00
Cowl Hinges #3
Details
       

 01-03-2010
2.00
Cowl HInges #2
Details
       

 01-02-2010
1.00
Cowl Hinges
Details
       

 12-25-2009
1.00
Throttle quadrant #2
Details
       

 12-19-2009
1.00
Throttle Quadrant
Details
       

 12-17-2009
1.00
Throttle quandrant insert
Details
       

 12-10-2009
1.00
Nutplates on lower console
Details
       

 12-06-2009
1.00
Rivet nutplates on panel
Details
     

 12-05-2009
1.00
Working on panel mounts
Details
       

 12-02-2009
1.00
Instrument Panel Insert
Details
       

 12-01-2009
0.00
Rearrange the shop/garage
Details
       

 11-23-2009
0.00
Overhead Console
Details
       

 11-20-2009
1.00
Misc - Conduits
Details
       

 11-14-2009
1.00
Painting Interior Fuselage Parts
Details
       

 11-13-2009
2.00
Interior Paint Prep
Details

 11-12-2009
2.00
Complete Seat Backs
Details
       

 11-11-2009
2.00
Rear Seat Back Fabrication
Details
       

 11-10-2009
3.00
Flap Torque Tube and Flap Crank #3
Details
       

 11-09-2009
2.00
Flap Torque Tube and Flap Crank #2
Details
       

 11-08-2009
1.00
Flap Torque Tube and Flap Crank
Details
       

 11-06-2009
3.00
Instrument Panel
Details
       

 11-05-2009
2.00
Control Sticks Continued #3
Details
       

 11-05-2009
1.00
Control Sticks Continued #2
Details
     

 11-04-2009
2.00
Right Control Stick
Details
     

 11-03-2009
2.00
Left Control Stick and Instrument Panel
Details
       

 11-02-2009
2.00
Install elevator idler arm and control column
Details
       

 10-31-2009
2.00
Aileron pushrods and Elevator Idler Arm
Details
       

 10-30-2009
1.00
Elevator Pushrod (Mid)
Details
     

 10-30-2009
1.00
Elevator Pushrod (Forward)
Details
     

 10-29-2009
2.00
Rudder cables
Details
       

 10-28-2009
2.00
Fuselage brake lines completed
Details
       

 10-27-2009
2.00
Brakes continued #3
Details
       

 10-26-2009
2.00
Brakes, continued #2
Details
       

 10-25-2009
2.00
Some painting and starting on the brakes
Details
       

 10-22-2009
2.00
Putting a second coat on the forward cabin
Details
     

 10-21-2009
2.00
Painting the fuselage interior
Details
       

 10-20-2009
2.00
Fuselage interior painting prep
Details

 10-15-2009
0.00
Overhead Console test
Details

 10-11-2009
0.50
Fuel lines
Details
     

 10-08-2009
1.50
Fuel Pump and Filter Installation
Details
     

 10-07-2009
2.00
Fuel lines
Details
       

 10-06-2009
2.00
NACA Vent and Andair Fuel Valve
Details
       

 10-05-2009
2.00
NACA Vent, Heat Duct Tee, Fuel Fittings
Details
       

 10-02-2009
3.00
Brake lines in the tunnel
Details
       

 10-01-2009
2.00
Brakes lines under the front seats installed
Details
       

 09-30-2009
2.00
Tunnel insulation and overhead console
Details
       

 09-29-2009
2.00
Starting on the brakes
Details
       

 09-27-2009
3.00
Cabin Cover trimming #3
Details
       

 09-25-2009
1.00
Cover Panels Continued #5
Details
     

 09-22-2009
3.00
Rear Seat Floors
Details
       

 09-21-2009
3.00
Cover panels continued #4
Details
       

 09-18-2009
3.00
Cabin Cover trimming continued
Details
       

 09-16-2009
4.00
Starting to trim cabin cover
Details
       

 09-14-2009
3.00
Cover Panels Continued #3
Details
       

 09-10-2009
1.00
Andair Fuel Valve
Details
       

 09-06-2009
2.00
Cover Panels Continued #2
Details
       

 09-01-2009
2.00
Cover Panels
Details
       

 08-31-2009
1.00
Baggage door #6
Details
       

 08-31-2009
1.00
Baggage door #5
Details
       

 08-31-2009
1.00
Baggage door #4
Details
     

 08-29-2009
2.00
Baggage Door #3
Details
       

 08-27-2009
2.00
Baggage door #2
Details
       

 08-26-2009
1.00
Baggage door
Details
       

 08-26-2009
1.00
Baggage area continued #5
Details
       

 08-25-2009
2.00
Baggage area continued #4
Details
       

 08-24-2009
1.50
Baggage area continued #3
Details
     

 08-24-2009
1.50
Baggage area continued #2
Details
       

 08-23-2009
2.00
Baggage area continued #1
Details
       

 08-22-2009
3.00
Fuselage baggage floor continued
Details
       

 08-21-2009
3.00
Conduit and Baggage area continued
Details
       

 08-19-2009
2.00
Baggage and rear seat insulation
Details
       

 08-18-2009
3.00
Fuselage flooring
Details
       

 08-16-2009
3.00
Fuselage conduit con't.
Details
       

 08-15-2009
1.00
Fuselage conduit
Details
       

 08-14-2009
1.00
Installed comm antenna doublers
Details
       

 08-12-2009
1.00
Fabricate second antenna doubler
Details
       

 08-10-2009
1.00
Fabricate antenna doubler
Details
     

 08-09-2009
4.00
Service Bulletin 08-6-1
Details
       

 08-03-2009
1.00
Baggage area continued #5
Details
       

 08-01-2009
0.00
Airventure 2009
Details
       

 07-21-2009
1.00
Baggage floor stiffners & OSH
Details

 07-20-2009
1.00
Baggage Compartment, con't
Details
       

 07-20-2009
1.00
Baggage compartment started
Details
     

 07-19-2009
2.00
Upper fuselage section completed
Details
       

 07-17-2009
1.00
Upper fuselage assembly, con't.
Details

 07-17-2009
1.00
Upper fuselage assembly, con't
Details

 07-16-2009
2.00
Upper fuselage panel, cont.
Details
       

 07-15-2009
2.00
Instrument Panel
Details
       

 07-14-2009
3.00
Upper fuselage panel, con't.
Details
       

 07-13-2009
2.00
Finished steps, continued on upper fuselage panel
Details
       

 07-12-2009
2.00
Finished inspection panel, started upper fuselage
Details
       

 07-11-2009
2.00
Inspection Panel and Panel Ribs
Details
       

 07-10-2009
1.00
Adding an inpsection plate to the tunnel
Details
       

 07-09-2009
1.00
Installing steps
Details
     

 07-07-2009
1.00
Finished vents, continued working on steps
Details
       

 07-06-2009
1.00
Fuselage vents and start steps
Details
       

 07-02-2009
0.00
Modified fuselage stand to accomodate tailcone
Details
       

 06-30-2009
1.00
Fuselage vent doors
Details

 06-29-2009
3.00
Finishing riveting the tailcone to the fuselage
Details
       

 06-28-2009
2.00
Started riveting tailcone to fuselage
Details
       

 06-27-2009
2.00
Match drill and deburr tailcone attach
Details
     

 06-27-2009
2.00
Dimple tailcone attach
Details
     

 06-26-2009
1.00
Mounting the tailcone to the fuselage (part 2)
Details
       

 06-26-2009
1.00
Mounting the tailcone to the fuselage (part 1)
Details
       

 06-25-2009
1.00
Forward fuselage ribs & garage musical chairs
Details
       

 06-23-2009
5.00
Fuselage middle cabin deck and landing gear mount
Details
       

 06-22-2009
8.00
Forward Cabin Floors
Details
       

 06-16-2009
1.00
Started upper fuselage assembly
Details
     

 06-14-2009
2.00
Insulating the front floor area
Details
       

 06-13-2009
3.50
Riveting fuselage - the end is almost in sight
Details
       

 06-12-2009
1.50
Riveting fuselage, the saga continues
Details
     

 06-11-2009
2.00
Some rework on a couple parts
Details

 06-10-2009
2.00
Riveting fuselage skins - con't
Details
     

 06-08-2009
2.00
Fuselage skin riveting - con't
Details
       

 06-07-2009
2.00
Riveting fuselage sikins - con't
Details
       

 06-05-2009
0.50
Riverting fuselage skins - con't
Details
     

 05-31-2009
1.00
Riveting fuselage skins - con't
Details
       

 05-29-2009
1.50
Riveting fuselage skins - con't
Details
     

 05-25-2009
1.00
Fuselage riveting - con't
Details

 05-24-2009
3.00
Riveting fuselage - con't.
Details
     

 05-21-2009
3.00
Riveting left fuselage skins
Details

 05-20-2009
3.00
Riveting fuselage skins
Details
     

 05-19-2009
4.00
Started riveting fuselage skins
Details
       

 05-18-2009
3.00
Fuselage continued.....
Details
     

 05-17-2009
2.00
Rivet upper and lower fuselage side channels
Details
       

 05-16-2009
3.00
Finish countersinking and start riveting fuselage
Details
       

 05-15-2009
1.00
Finished priming
Details
     

 05-14-2009
3.00
Cleaning and priming fuselage parts
Details
       

 05-13-2009
3.00
Deburring and scuffing all the fuselage parts
Details
     

 05-12-2009
4.00
Dimple more fuselage skins
Details
       

 05-11-2009
4.00
More deburring and dimpling fuselage parts
Details
     

 05-10-2009
4.00
Machine countersinking fuselage parts
Details
     

 05-08-2009
1.00
Forward fuselage con't
Details

 05-07-2009
2.00
Forward fuselage con't
Details

 05-06-2009
0.00
Pitot
Details

 05-06-2009
1.00
Forward fuselage skins con't
Details
       

 05-06-2009
2.00
Forward Fuselage Skins - con't
Details

 05-05-2009
1.00
Pitot
Details

 05-05-2009
1.00
Left forward fuselage skin
Details
       

 05-04-2009
1.00
Cleco the various side channels
Details
       

 05-04-2009
0.50
Bending fuselage channels
Details

 05-04-2009
1.00
Bending forward fuselage skins
Details
     

 05-03-2009
4.00
Middle fuselage skins
Details
       

 05-02-2009
2.00
Rolling middle side skins
Details
       

 05-01-2009
1.50
Installing longerons con't
Details
       

 05-01-2009
1.50
Installing longerons
Details
       

 04-30-2009
1.50
Bending the fuselage longerons
Details
       

 04-30-2009
1.50
Bending fuselage longerons con't
Details
       

 04-29-2009
2.00
Landing gear mount
Details
       

 04-28-2009
2.00
Rivet the bottom flange of the Aft Center Section
Details
       

 04-27-2009
0.00
Building a fuselage stand
Details
     

 04-26-2009
2.00
Assembly of seat floors and mid seat rail supports
Details
       

 04-25-2009
2.00
Prepping and priming seat floor assemblies
Details
     

 04-25-2009
0.00
OSU Spring Game - ROTC Color Guard
Details
       

 04-24-2009
1.00
Started seat floors
Details
     

 04-23-2009
4.00
Install bulkhead side channel & fueslage bulkhead
Details
       

 04-22-2009
2.00
Riveting fuselage bottom skin
Details

 04-21-2009
6.00
Mating the forward and mid fuselage sections
Details
       

 04-20-2009
1.00
Back riveting forward fuselage ribs
Details
       

 04-18-2009
4.00
Started riveting forward fuselage
Details
       

 04-17-2009
1.00
Priming forward fueselage parts
Details
       

 04-16-2009
3.00
Etch and alodine forward fuselage parts
Details
       

 04-15-2009
2.00
Finished deburring and dimpling fuselage skins
Details
     

 04-14-2009
2.00
Forward fuselage con't
Details

 04-13-2009
1.00
Forward fuselage con't
Details
     

 04-12-2009
3.00
Forward fuselage con't
Details
       

 04-10-2009
2.00
Forward fuselage con't
Details
       

 04-09-2009
2.00
Forward fuselage con't.
Details
       

 04-08-2009
2.00
Forward fuselage bulkhead assembly & bottom skin
Details
       

 04-07-2009
2.00
Finished bottom rear fuselage skin
Details
       

 04-06-2009
1.00
Rivet seat supports and bulkhead side channels
Details
     

 04-05-2009
4.00
More forward fuselage part preparation and install
Details
       

 04-04-2009
4.00
Rivert bottom skins and forward fuselage assembly
Details
       

 04-02-2009
2.00
Started front rib assembly
Details
       

 04-01-2009
2.00
Match drill forward fuselage rib & riveting skin
Details
     

 03-31-2009
3.00
Rivet the various angle supports on the firewall
Details
     

 03-30-2009
1.00
Started riveting angle supports on the firewall
Details
     

 03-29-2009
3.00
Rivet bottom skin and dimple/prime firewall parts
Details
       

 03-28-2009
3.00
Right fuel tank & rivet rear fuselage skins
Details
       

 03-27-2009
1.00
Prime rear bottom fuselage skins & floor stiffners
Details
       

 03-26-2009
2.00
Started the firewall
Details
     

 03-25-2009
1.50
Dimple and machine countersink bottom flanges
Details
     

 03-24-2009
2.00
Etch / alodine skins & stiffners, prime fuel tank
Details
       

 03-23-2009
3.00
Debur and dimple fuse skins
Details
       

 03-22-2009
3.00
Match drilling bottom rear bottom fuselage skins
Details
     

 03-20-2009
3.00
Left outboard bottom wing skin
Details
     

 03-19-2009
3.00
Fuel tank, pitot, and wings
Details
       

 03-18-2009
0.00
Right fuel tank and misc fuselage
Details
       

 03-17-2009
2.00
Fuselage bulkhead attach and skins
Details
       

 03-16-2009
2.00
Right fuel tank & baggage area ribs
Details
       

 03-15-2009
3.00
Mount fuel tank and started riveting bottom skins
Details
       

 03-14-2009
2.00
Fuel tank and started rib to fuselage attach
Details
       

 03-13-2009
3.00
Finished the rear seat ribs and rear spar bulkhead
Details
     

 03-12-2009
3.00
Continuation on the rear seat ribs
Details
       

 03-11-2009
2.00
Fuel tank and started ribs to connect bulkheads
Details
       

 03-10-2009
3.00
Attach the rib subassemblies to aft center section
Details
       

 03-09-2009
2.50
Completed outboard seat ribs subassemblies
Details
       

 03-08-2009
3.00
Left and right inboard seat ribs completed
Details
       

 03-07-2009
1.00
Finished fuselage bulkhead, started inboard seat
Details
       

 03-07-2009
3.00
Finish rear spar bulkhead, start fuselage bulkhead
Details
       

 03-06-2009
2.50
Started the rear spar bulkhead assembly
Details
     

 03-05-2009
2.50
Completion of aft center section bulkhead assembly
Details
     

 03-04-2009
2.00
Debur, clean, and prime aft center bulkhead parts
Details
     

 03-04-2009
1.00
Cleco, rivet, and assemble aft center bulkhead
Details
     

 03-03-2009
2.00
Finished forward center bulkhead, started the aft
Details
       

 03-01-2009
3.00
Riveting center section bulkhead
Details
     

 02-28-2009
4.00
Started fuselage construction
Details
       

 02-28-2009
0.50
Riveted left flap trailing edge
Details
       

 02-27-2009
0.50
Rivet right flap trailing edge
Details
       

 02-25-2009
1.00
Riveted trailing edge of both ailerons
Details
     

 02-24-2009
2.00
Pitot plumbing and adel clamps on left wing
Details
       

 02-22-2009
3.00
Left wing - gap fairings
Details
       

 02-21-2009
2.00
Prosealed traling edges on flaps and ailerons
Details
     

 02-20-2009
0.50
Plugging fuel tank leak
Details

 02-19-2009
0.50
Fuel tank testing - found another leak
Details

 02-18-2009
0.50
Testing fuel tank again
Details
       

 02-18-2009
1.50
Blind rivets on the flaps
Details
       

 02-17-2009
3.00
Riveted top and bottom skin to the right flap spar
Details
       

 02-15-2009
3.00
Riveted bottom left flap skin and continued right
Details
       

 02-14-2009
2.00
Started right flap and riveted left top skin
Details

 02-13-2009
2.00
Riveted top left flap skin to spar
Details

 02-12-2009
2.00
Started assembly and riveting the left flap
Details
       

 02-11-2009
0.75
Started left flap assembly
Details
     

 02-11-2009
1.00
More right aileron assembly
Details
       

 02-11-2009
0.50
Left fuel tank leak patching
Details
       

 02-10-2009
2.00
Started assembly and riveting the right aileron
Details
       

 02-09-2009
3.00
Assembled and riveted left aileron
Details
     

 02-08-2009
0.00
Finished fuselage kit inventoried
Details
       

 02-07-2009
0.00
Inventory of small parts box
Details
     

 02-06-2009
0.00
Fuselage inventory
Details

 02-05-2009
1.00
Starting to assemble the left aileron
Details
       

 02-05-2009
0.50
More fuel tank testing
Details

 02-05-2009
0.00
Fuselage Kit arrives
Details
       

 02-04-2009
1.00
More fuel tank testing
Details

 02-03-2009
1.00
Fuel tank leak testing
Details

 02-02-2009
0.50
Fuel tank - leak testing
Details
     

 01-31-2009
1.00
Pitot module install and wing wiring
Details

 01-30-2009
0.00
Clean the shop/garage
Details

 01-29-2009
6.00
Prime wing, aileron, and flap parts
Details
       

 01-28-2009
4.00
Alodine wing, flap, and aileron parts
Details

 01-27-2009
3.00
More etching
Details

 01-26-2009
1.50
Etched wing and flap skins
Details

 01-25-2009
5.00
Cleaned, etched, alodined aileron and flap parts
Details
       

 01-24-2009
4.00
Debur and dimple flaps parts
Details
       

 01-23-2009
0.30
Debur and dimple flap leading edge skins
     

 01-23-2009
2.00
Debur and dimple aileron parts
Details
       

 01-22-2009
1.00
Dimple and debur last flap skin
Details
       

 01-22-2009
2.00
Dimple and debur aileron skins and spar
Details
     

 01-21-2009
1.00
Debur and dimple flap skins
Details
       

 01-20-2009
3.00
Debur and dimple bottom wing skins and flap
Details
       

 01-19-2009
1.50
Debur and dimple left outward bottom skin
Details
     

 01-18-2009
2.00
Debur and dimple right bottom outward wing skin
Details
     

 01-17-2009
3.00
Bottom wing skins and pitot mount
Details
       

 01-16-2009
0.00
Renee upholstered my stools
Details
     

 01-16-2009
1.00
Blue plastic removal, pitot, and priming
Details
       

 01-13-2009
0.00
Moved left wing to cart and cleaned up shop/garage
Details
       

 01-12-2009
1.00
Installed AFS AOA wing ports
Details
       

 01-11-2009
0.00
Fixed sling on wing cart
Details
       

 01-10-2009
4.00
Mount right leading edge to wing spar
Details
       

 01-09-2009
0.50
Right leading edge - HID wiring
Details

 01-08-2009
0.50
Updated wing cart
Details
       

 01-07-2009
0.15
Moving AOA
Details

 01-04-2009
1.00
Wiring for left leading edge
Details
       

 01-04-2009
4.00
Mounting left leading edge to the wing spar
Details
       

 01-03-2009
0.00
Fuel tanks complete
Details

 01-03-2009
4.00
Finished fuel tanks and installed AOA ports
Details
       

 01-02-2009
0.25
Wing conduit run and clean left fuel tank
Details
       

 01-01-2009
3.50
Rear baffle on the right fuel tank
Details
       

 12-30-2008
1.00
Fuel Senders, Fuel Guardian, and Fuel Vents
Details
       

 12-29-2008
1.00
Fuel Senders and Fuel Guardian
Details
     

 12-28-2008
0.00
Started panel planning
Details
     

 12-21-2008
0.50
Fuel Senders
Details
       

 12-20-2008
4.00
Fuel vents and inboard rib on both fuel tanks
Details
       

 12-19-2008
2.00
More fuel tank sealing
Details
       

 12-18-2008
1.00
Riveted tank attach bracket on both fuel tanks
Details
       

 12-17-2008
1.00
Sealing left fuel tank ribs
Details
     

 12-16-2008
1.00
More sealant on the right fuel tank
Details
     

 12-15-2008
1.00
Sealing shop heads on right fuel tank
Details
     

 12-13-2008
4.00
Finished right fuel tank ribs and stiffner
Details
       

 12-10-2008
1.00
Match drilled left flap
Details
     

 12-08-2008
0.00
Updated parts organizers in the shop
Details
       

 12-07-2008
1.00
Started left flap
Details

 12-06-2008
4.00
Right fuel tank and match drill right flap
Details
       

 12-05-2008
4.00
Right fuel tank and right flap
Details
       

 12-04-2008
1.00
Cleco right flap spar and ribs
Details

 12-03-2008
1.00
Cleco left flap spar and ribs
Details
       

 12-02-2008
1.00
Started the flaps
Details
       

 12-01-2008
0.25
Disassemble ailerons
Details

 11-30-2008
0.00
Re-arrange shop
Details
       

 11-27-2008
3.00
More fun with Proseal and fuel tanks
Details

 11-23-2008
4.00
Match drilling left and right ailerons
Details
       

 11-22-2008
1.00
Aileron skins
Details

 11-21-2008
3.50
Started right and left ailerons
Details
       

 11-17-2008
1.00
Attach nutplates to z-brackets
Details

 11-16-2008
4.00
Right fuel tank ribs
Details
       

 11-15-2008
3.50
Finish right tank stiffners
Details
     

 11-11-2008
1.00
Started right tank stiffners
Details
       

 11-10-2008
0.75
Left & right fuel tank attach bracket sub-assembly
Details
     

 11-09-2008
4.00
Dimple fuel tank skins and start prosealing
Details
       

 11-08-2008
3.00
Finished deburring and started dimpling
Details
       

 11-06-2008
0.25
Stripped blue plastic off tank skins
Details

 11-04-2008
1.00
More deburring
Details

 11-03-2008
1.00
More deburring and patching
Details

 11-02-2008
3.00
Deburring fuel tank parts
Details

 11-01-2008
0.00
Installed new heaters in the garage
Details
       

 11-01-2008
3.00
Finished machine countersinking fuel tank
Details
       

 10-30-2008
1.00
More Match Drilling on Right Fuel Tank
Details

 10-29-2008
1.50
Machine Counter sink left fuel tank skins
Details
       

 10-27-2008
1.00
More match drilling on left tank
Details
       

 10-26-2008
4.00
Working on the fuel tanks
Details
       

 10-25-2008
2.00
Match drilled parts on the right fuel tank
Details

 10-23-2008
1.00
Match drilled left fuel tank ribs
Details

 10-20-2008
1.00
Cleco'd bottom stiffners and ribs in left tank
Details
       

 10-19-2008
1.00
More deburring parts
Details

 10-19-2008
1.00
Left Landing Light Lens
Details
     

 10-18-2008
0.50
Deburring parts
Details

 10-17-2008
1.00
Fuel Tank stiffners and z-bracket
Details

 10-13-2008
1.00
Stall Warning
Details
       

 10-12-2008
2.00
Left Leading Edge Assembly
Details
       

 10-10-2008
0.75
Duckworks Lens
Details
       

 10-09-2008
1.00
Nutplates and Landing Light Lens
Details
       

 10-08-2008
0.50
Finished riveting nutplates on right leading edge
Details

 10-07-2008
0.50
Riveted fuel tank nutplates - Right Leading Edge
Details

 10-05-2008
3.00
Finished Riveting Leading Edge Skins
Details
       

 10-05-2008
0.00
Duckworks HIDs Part #2
Details
       

 10-05-2008
0.00
Duckworks HIDs
Details
       

 10-04-2008
0.00
Passed FCC Technician Test
Details

 10-02-2008
1.00
Riveting Leading Edge Skin and HID Assembly
Details
       

 10-01-2008
1.50
Re-assembly of leading edge
Details
       

 09-30-2008
1.00
Assembling Leading Edge
Details

 09-29-2008
1.00
Finished priming the Leading Edge parts and skins
Details
       

 09-28-2008
5.00
Clean, rough, and prime
Details

 09-27-2008
2.00
Dimpling skins
Details

 09-26-2008
0.00
CreativAir LED Postion/Strobe
Details
       

 09-24-2008
0.50
Dimpling Leading Edge Skins
Details

 09-23-2008
0.25
Debur Leading Edge Skins
Details

 09-22-2008
1.50
Deburring and Dimpling Leading Edge
Details

 09-21-2008
2.00
Deburring Leading Edge Components
Details

 09-20-2008
2.50
HID Lights and AOA
Details
       

 09-19-2008
1.50
Duckworks HIDs and Stall Access Panel
Details
       

 09-14-2008
1.50
Duckworks HID Mount
Details
       

 09-13-2008
2.00
Cutting Leading Edge Holes
Details
       

 09-12-2008
0.25
Drilled Stall Warning Vane holes
Details

 09-11-2008
1.50
Left Leading Edge
Details
       

 09-10-2008
0.00
Technical Counselor Visit #3
Details
     

 09-10-2008
1.00
Left Leading Edge
Details
     

 09-09-2008
0.25
Started Duckworks light install
Details
     

 09-08-2008
0.00
Technical Counselor Visit #2
Details

 09-07-2008
4.00
Match drilled leadig edge
Details
       

 09-06-2008
4.00
Started wing leading edge
Details

 09-05-2008
0.00
Wings Milestone Marker 550.55 hours
Details

 09-05-2008
1.00
Misc Wing Assembly
Details
       

 09-05-2008
0.50
Leading Edge Cradle Assembly
Details
     

 09-04-2008
1.50
Completed riveting top wing skins
Details
       

 09-03-2008
1.00
Almost finished with the top wings skins
Details
       

 09-02-2008
1.00
Right Wing Riveting
Details

 09-01-2008
4.00
Riveting Right Wing
Details
       

 08-31-2008
3.00
Continued wing assembly
Details

 08-30-2008
2.00
Misc wing construction and fire drills
Details

 08-29-2008
0.10
Primed new tie down brackets
Details

 08-28-2008
0.75
Tie down brackets
Details

 08-27-2008
1.00
More wings stuff
Details

 08-26-2008
1.00
More wing riveting
Details

 08-25-2008
2.00
Another day working on the wings
Details
       

 08-24-2008
0.00
Another day on the wings (more pics)
Details
       

 08-24-2008
4.00
Another day on the wings
Details
       

 08-23-2008
2.00
Started Right Wing Assembly
Details
       

 08-23-2008
3.00
Continued Right Wing assembly
Details
       

 08-21-2008
2.00
Continued left wing assembly and riveting
Details
       

 08-21-2008
1.00
Cleco left wing top skins
Details
       

 08-20-2008
2.00
Continue riveting the left wing
Details
       

 08-19-2008
2.00
Riveting left wing parts
Details
     

 08-18-2008
1.50
Continued Left wing assembly
Details
       

 08-17-2008
1.00
Spar Extension and Tie Down Bracket
Details
       

 08-17-2008
2.00
Finished priming wing parts
Details
       

 08-16-2008
5.00
Started priming wing parts
Details
       

 08-15-2008
2.00
Alodined wing parts
Details

 08-11-2008
1.50
Finished etching wing parts
Details

 08-10-2008
2.50
Etching wing parts
Details

 08-09-2008
3.00
Etching wing ribs
Details

 08-07-2008
1.00
Etching wing ribs
Details

 08-04-2008
1.00
Etching Wing Ribs
Details

 07-25-2008
0.00
AirVenture 2008
Details

 07-22-2008
1.00
Left top inward wing skin
Details

 07-20-2008
3.00
Right wing top outward skin
Details

 07-19-2008
3.50
Left wing skin completed dimpling
Details

 07-17-2008
2.00
Left wing skin
Details

 07-16-2008
1.50
Left wing skin
Details

 07-13-2008
1.00
Left Wing Skin
Details

 07-12-2008
1.00
Finished dimpling left wing parts
Details

 07-11-2008
0.25
Dimple wing ribs
Details

 07-10-2008
2.00
Deburring and dimpling left wing
Details

 07-09-2008
0.75
More deburring
Details

 07-05-2008
3.00
Dimpling right wing and deburring left wing
Details

 07-04-2008
3.00
Dimpling right wing parts
Details

 07-03-2008
1.50
Deburring and dimpling
Details

 07-01-2008
0.50
More deburring
Details

 06-28-2008
1.00
Deburring wing parts
Details

 06-22-2008
3.00
Debur right wing parts
Details

 06-21-2008
0.00
A month of diversions
Details

 05-01-2008
1.00
Match drilled bottom left wing skins
Details

 04-30-2008
1.00
Cleco'd left wing back together
Details

 04-26-2008
3.00
Match drill bottom right wing skins
Details
       

 04-19-2008
0.00
OSU Spring Football Game
Details
       

 04-19-2008
0.00
Cecilia A. Tochman Funeral
Details

 04-18-2008
1.00
Countersinking wing walk - right wing
Details

 04-17-2008
1.00
Match drill top skins - right wing
Details

 04-16-2008
1.00
Cleco right wing top skins
Details

 04-14-2008
1.00
Right Wing prep
Details

 04-13-2008
0.50
Left Wing disassemble
Details
     

 04-12-2008
7.00
Left wing assembly and match drilling
Details
       

 04-06-2008
1.00
Wing Stand Complete
Details
       

 04-04-2008
0.75
More work on Wing Stand
Details

 04-02-2008
1.00
Wing Stand
Details

 04-01-2008
0.25
Drilled pitot line in wing ribs
Details

 03-31-2008
0.50
Modifying a couple wing ribs
Details

 03-30-2008
3.00
Prepping Wing Ribs
Details
       

 03-29-2008
1.00
Prepping Wing Parts
Details

 03-23-2008
3.00
Installing nutplates on the wing spar
Details
       

 03-22-2008
3.00
More countersinking
Details

 03-16-2008
2.00
More countersinking hell
Details

 03-15-2008
3.00
Countersinking Hell
Details

 03-09-2008
3.00
Preparing the spar
Details

 03-01-2008
3.00
Match drill spar j-channel
Details
       

 02-24-2008
0.50
Match drill spar splice plates
Details

 02-23-2008
0.00
Tailcone flies!
Details
       

 02-22-2008
0.50
Van's Official Response - Not a problem
Details
       

 02-18-2008
0.10
Started Wings
Details
       

 02-18-2008
0.00
Hiatus to attend my step father's funeral
Details
     

 02-10-2008
0.00
Tailcone Complete
Details

 02-10-2008
1.00
Attached seat belt anchor and battery tray
Details
       

 02-09-2008
0.00
More tailcone pics - to get over 3 pic limit
Details
       

 02-09-2008
0.00
More tailcone pics - to get over 3 pic limit
Details
       

 02-09-2008
3.00
Attaching tailcone top skin
Details
       

 02-06-2008
1.00
Attaching tailcone rear deck
Details
     

 02-05-2008
1.50
Assembly of tailcone
Details
     

 02-03-2008
3.00
Finshed wings inventory
Details

 02-02-2008
4.00
Parts Inventory
Details

 02-01-2008
4.00
Parts inventory
Details

 01-31-2008
1.00
Wings arrived
Details

 01-26-2008
0.00
AirCrafters Composite Class
Details
       

 01-20-2008
4.00
Riveting Tailcone
Details
       

 01-19-2008
4.00
Riveting Right Tailcone Skin
Details
       

 01-13-2008
0.00
Heading to Las Vegas
Details

 01-12-2008
4.00
Riveting Tailcone skin
Details

 01-07-2008
0.00
BCS Champhionship Game
Details
       

 01-03-2008
1.00
Riveting Tailcone
Details

 01-02-2008
0.50
More riveting
Details

 01-01-2008
3.00
Back riveting tailcone skins
Details
       

 12-30-2007
2.00
Tear down paint booth, start assembly
Details
       

 12-30-2007
2.00
Continued tailcone assemby
Details
       

 12-30-2007
2.00
Continued tailcone assembly
Details
       

 12-29-2007
4.00
Priming tailcone parts
Details
       

 12-28-2007
0.00
Set up for painting
Details

 12-27-2007
2.00
Alodine tailcone parts
Details
     

 12-26-2007
3.00
Finished etching and battery mount
Details
       

 12-25-2007
3.00
Etching and battery box
Details

 12-24-2007
3.00
Etching
Details

 12-23-2007
1.00
Etching
Details

 12-19-2007
1.00
Deburr and dimple
Details

 12-18-2007
1.00
Deburr and dimple
Details

 12-17-2007
1.00
Deburr and dimple
Details

 12-14-2007
3.00
Deburr and dimple
Details

 12-13-2007
2.00
Deburr and Dimple
Details

 12-12-2007
1.50
Deburr and dimple
Details
       

 12-11-2007
1.00
Deburr and dimple
Details

 12-09-2007
1.00
Deburr and dimple
Details

 12-09-2007
0.00
AMP Crimper and Daniels AFM8
Details
       

 12-08-2007
4.00
Deburring and Dimpling - 1st of many session
Details

 12-05-2007
0.00
EAA Chapter 9 Holiday Dinner
Details

 12-04-2007
1.00
Disassembly and dimpling
Details

 12-03-2007
1.00
Start of the disassembly for deburring and dimplin
Details

 12-02-2007
1.00
Continuing match drilling
Details
       

 12-01-2007
0.00
AeroElectric Seminar
Details
       

 11-30-2007
2.00
Match drilling some more
Details
       

 11-28-2007
1.00
Clecoing the top skins on the tailcone
Details
       

 11-26-2007
0.00
Wings Ordered
Details

 11-25-2007
4.00
Match drilling - almost done
Details
       

 11-24-2007
4.00
More match drilling
Details

 11-23-2007
4.00
Match Drill
Details
       

 11-22-2007
3.00
Match drilling
Details
       

 11-21-2007
2.00
Match drilling
Details
       

 11-18-2007
1.00
Bending longerons
Details

 11-14-2007
1.50
Parts prep
Details

 11-11-2007
2.00
Parts prep
Details

 11-10-2007
4.00
Started prepping parts
Details

 11-04-2007
2.00
Rolled leading edge
Details
       

 11-04-2007
0.00
Elevator Completed - 320 Total Hours
Details

 11-02-2007
0.00
Dan Lloyd - Gone West
Details
       

 10-30-2007
1.50
Cleaning clecos
Details

 10-27-2007
2.00
Finished riveting trailing edge
Details

 10-25-2007
0.00
EAA 9 Homebuilder's SubGroup
Details

 10-24-2007
1.50
Cleaning proseal and riveting
Details

 10-23-2007
1.00
Cleaning up the proseal
Details

 10-20-2007
3.00
More riveting and proseal application
Details

 10-17-2007
0.00
Another oops!
Details

 10-13-2007
1.00
Finished riveting elevators
Details

 10-09-2007
0.50
Riveting
Details

 10-07-2007
2.00
Continued riveting
Details

 10-06-2007
4.00
Continued Riveting
Details

 10-04-2007
0.50
Pounding Rivets
Details

 10-03-2007
0.50
Pounding Rivets
Details

 09-23-2007
0.00
EAA Sport Air Composite Workshop
Details

 09-22-2007
0.00
EAA Sport Air Composite Workshop
Details

 09-20-2007
0.00
Texas Tour
Details

 09-16-2007
3.00
Assemby and riveting left elevator
Details

 09-15-2007
4.00
Assemble and rivet right elevator
Details
       

 09-14-2007
4.00
Riveting ribs to elevator skins
Details

 09-12-2007
1.00
Start assembly and riveting
Details

 09-11-2007
0.00
20th Wedding Anniversary
Details

 09-10-2007
3.00
Prime elevator parts
Details
       

 09-09-2007
3.00
Applied alodine to all elevator parts
Details

 09-08-2007
5.00
Cleaning and Etching
Details

 09-07-2007
3.00
Finished prep work
Details

 09-06-2007
3.00
More dimpling and match drilling
Details

 09-05-2007
1.50
Continue elevator and trim match drilling - right
Details
       

 09-04-2007
1.00
New elevator skin arrived
Details

 09-03-2007
2.00
Paint Table
Details
       

 08-30-2007
1.00
Trim Tabs
Details
     

 08-28-2007
1.00
Trailing edge and tab ribs
Details

 08-27-2007
0.75
Continued dimpling
Details
       

 08-26-2007
4.00
More dimpling
Details

 08-25-2007
6.00
Misc prep and dimpling
Details

 08-23-2007
0.00
Visited Greg Schroeder's Sportman's Build
Details

 08-22-2007
1.00
Started dimpling
Details

 08-19-2007
1.00
Added more garage storage
Details
       

 08-18-2007
3.00
Young Eagles
Details

 08-15-2007
1.00
Dis-assembly for dimpling and deburring
Details

 08-13-2007
0.50
Elevator Prep
Details

 08-12-2007
0.50
EAA Technical Counselor Visit #1
Details
     

 08-12-2007
5.00
Continue elevator prep
Details
       

 08-08-2007
0.75
Continue elevator prep
Details

 08-06-2007
1.00
Continue elevator prep
Details

 08-05-2007
2.00
Continue elevator prep
Details

 08-04-2007
3.00
Started elevator
Details

 08-04-2007
1.00
Clean garage
Details

 07-28-2007
0.00
Oshkosh
Details
       

 07-14-2007
0.00
Horizontal Stabilizer Completed
Details

 07-14-2007
1.00
Finished the horizontal stabilizer
Details
       

 07-12-2007
2.00
Riveting the rear spar
Details
       

 07-10-2007
3.00
Riveting HS
Details

 07-07-2007
4.00
More riveting
Details

 07-01-2007
2.00
Riveting HS skins
Details
     

 06-26-2007
1.00
Riveting HS Skins
Details

 06-18-2007
1.00
More assembly and riveting
Details

 06-17-2007
2.00
Starting to re-rivet
Details

 06-17-2007
0.00
EAA Ford Trimotor
Details
       

 06-16-2007
2.00
Removing rivets
Details

 06-13-2007
3.00
Removing Rivets
Details

 06-06-2007
0.00
Trip to Orlando
Details

 06-02-2007
0.00
Brad's Graduation
Details

 06-01-2007
3.00
Starting HS assembly
Details

 05-29-2007
1.00
Cleaning and prep for riveting
Details
       

 05-27-2007
5.00
Prime the HS
Details

 05-26-2007
5.00
Etching and Alodine
Details
       

 05-22-2007
2.00
Etching
Details

 05-18-2007
2.00
More etching
Details

 05-15-2007
1.50
More dimpling
Details

 05-14-2007
1.00
Dimpling
Details

 05-11-2007
1.50
Preping for dimpling
Details

 05-10-2007
2.00
Deburring
Details

 05-07-2007
1.00
Disassemble to deburr and dimple
Details
       

 05-05-2007
4.00
Continued assembly and final drill
Details
       

 04-29-2007
2.00
Continue to assemble and final drill
Details

 04-28-2007
3.00
HS Assemble and final drill
Details
       

 04-22-2007
3.00
Rear/Front Spar
Details
       

 04-20-2007
1.00
Rear Spar
Details

 04-16-2007
1.00
Re-arranged shop
Details
       

 04-15-2007
0.00
Rudder Completed
Details

 04-15-2007
1.50
Final Rudder Assembly
Details
       

 04-14-2007
3.00
Rudder Assembly
Details
       

 04-14-2007
3.00
Rivet Rudder
Details
       

 04-07-2007
4.00
Rudder riveting, rudder trim finalize
Details
     

 04-07-2007
1.00
Joining the skins is complete
Details
       

 04-07-2007
2.00
Final rudder assembly and proseal
Details
       

 04-05-2007
1.00
Rivet stiffners
Details
       

 03-31-2007
2.00
Primed rudder parts
Details

 03-30-2007
3.00
Alodine Rudder part
Details

 03-29-2007
2.00
Etched Rudder parts
Details

 03-24-2007
4.00
Dimple skins
Details

 03-23-2007
1.00
Cut rudder trim holes
Details

 03-18-2007
6.00
VS Finished!
Details
       

 03-18-2007
0.00
Vertical Stabilizer Completed
Details

 03-17-2007
4.00
Riveting VS Skin
Details
       

 03-10-2007
1.00
Started VS Skin Riveting
Details

 03-06-2007
1.00
Rivet VS
Details
     

 03-04-2007
2.00
Set up paint booth
Details
       

 03-04-2007
3.00
Prime VS
Details
       

 03-03-2007
8.00
Etch & Alodine VS
Details
       

 02-22-2007
2.00
VS-1014 (one more time)
Details

 02-13-2007
3.00
Rudder match drilling
Details
       

 02-12-2007
1.50
Match drilling rudder ribs
Details
     

 02-11-2007
1.50
More match drilling and dimpling
Details
     

 02-11-2007
3.00
Cutting and deburring parts
Details
     

 02-10-2007
8.00
Match Drilling skin and ribs, dimpling
Details
       

 02-09-2007
2.00
Counter sinking VS-1008
Details
     

 02-08-2007
1.50
Match drilling
Details

 02-06-2007
1.50
VS-1003 match hole drilling
Details
       

 02-05-2007
1.00
First Cut VS-1014
Details
       

 02-04-2007
3.00
Tool Box
Details

 01-24-2007
1.00
Misc containers to store parts, tool bits, etc
Details
       

 01-23-2007
3.00
DRDT-2
Details
       

 01-22-2007
2.00
Shop Area
Details
       

 01-22-2007
1.00
Misc Tools
Details
       

 01-21-2007
6.00
Finished Inventory and Shop Clean up
Details
     

 01-20-2007
6.00
Inventory
Details
       

 01-19-2007
2.00
Started inventory
Details

 01-17-2007
2.00
Picked up empennage kit
Details

 01-14-2007
7.00
Shop almost finished
Details
       

 01-13-2007
6.00
Started EAA tables
Details

 01-06-2007
5.00
Getting the Shop ready
Details
       

 12-27-2006
8.00
Garage - Con't
Details

 12-27-2006
0.50
Compressor Arrives
Details

 12-26-2006
8.00
Garage - Con't
Details

 12-25-2006
8.00
Preparing Garage
Details
       

 12-22-2006
2.00
Avery Tools Arrive
Details
       

 12-20-2006
0.50
Uncrated Tool Chest
Details
     

 12-19-2006
0.50
U.S. Tool
Details

 12-19-2006
1.00
Tool Chest
Details
       

 12-19-2006
0.50
Empennage Kit ordered
Details

 12-19-2006
0.50
Brown Tool
Details

 12-18-2006
0.50
Cleaveland Tool
Details
     

 12-18-2006
0.50
Avery Tool
Details

 12-17-2006
1.00
Grov-Air RV Builder Class (more pictures)
Details
       

 12-17-2006
1.00
Grov-Air RV Builder Class (more pictures)
Details
       

 12-17-2006
16.00
Grov-Air RV Builder Class
Details
       

 12-10-2006
4.00
Electrical
Details

 12-08-2006
1.00
Tool Quotes
Details

 11-26-2006
1.00
Tool Selection
Details

 11-25-2006
0.10
RV Builder Class
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.