Date:  4-21-2013
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Lower Console, Engine Mount, & Purge Valve

I finished the lower console and install the previously overlooked the nutplates. I also installed the switch bank beneath the throttle quadrant. I tested the switches with the VP/X Configurator and all switches functioned properly.

Several weeks ago Mike Cencula did an impromptu inspection of the project. He found one item that I corrected this morning. I needed to add additional washers to the engine mount bolts. That was taken care of firstthing this this morning.

I started working on routing the purge valve control cable FWF.

I uninstalled both AFS 4500s EFIS. I had to remove the left one to remove the right one. I have to ship it back to AFS for repair.