KitLog pro

Powered By Kitlog Pro v2.0

Bob Leffler's RV-10
' style=
Date:  4-27-2013
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Heat Shields for Control Cables

Trimmed the heat shields for the control cables to fit. Several of them were a little too large. Then I drilled the mounting holes in the firewall. I installed shields for the two heater control cables, the oil cooler control cable, the ram air control cable, and the purge valve control cable.

The shields for the throttle, prop, and mixture were done previously.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.