KitLog pro

Powered By Kitlog Pro v2.0

Bob Leffler's RV-10
' style=
Date:  2-5-2012
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Panel Switch Wiring and Door Remount

I finished wiring and lacing the radio stack switch bank.

I started to re-install the doors for final alignment and finishing. Geoff Combs stopped by to take a look at the fit and to experiment with one of his future products.
' style=

Radio Stack Switch Bank Wired

Radio Stack Switch Bank Wired

' style=

Left door hung.

Left door hung.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.