Powered By Kitlog Pro v2.0
Bob Leffler's RV-10
RV-10
Brakes
9 Logs Found
Date
Hours
Work Log Summary
Details
02-02-2013
1.0
Brake Fluid
Details
11-26-2011
6.0
Installed brake lines
Details
10-28-2009
2.0
Fuselage brake lines completed
Details
10-27-2009
2.0
Brakes continued #3
Details
10-26-2009
2.0
Brakes, continued #2
Details
10-25-2009
2.0
Some painting and starting on the brakes
Details
10-02-2009
3.0
Brake lines in the tunnel
Details
10-01-2009
2.0
Brakes lines under the front seats installed
Details
09-29-2009
2.0
Starting on the brakes
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
All
Ailerons
Avionics
Brakes
Cabin Cover
Control System
Diversions
Doors
Electrical
Elevator
Empennage
Engine
Final Assembly
Finish Kit
Firewall Forward
Flaps
Fuel System
Fuel Tanks
Fuselage
Horizontal Stab
Interior
Lighting
Milestones
Miscellaneous
Paint
Panel
Prep
Prop
Rudder
Shop
Tailcone
Tools
Vertical Stabilizer
Wing Leading Edge
Wings
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.