Powered By Kitlog Pro v2.0
Bob Leffler's RV-10
RV-10
Brakes
11-26-2011
< Previous Log Entry
Next Log Entry >
Date:
11-26-2011
Number of Hours:
6.00
Manual Reference:
Brief Description:
Installed brake lines
Installed the new brake lines. I still need to install something to keep the two lines from rubbing where they cross over.
Moved the upper fuelage assembly to the hanger.
Started to work on installing more insulation.
Cutting my finger on the stainless foil and having the OSU game on, didn't help with productivity.
Lines run to the parking brake
Brakes lines run through the tunnel
Brake lines run underneath the seats
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1456
3251
Ailerons
13
27
Airworthiness
1
2
Avionics
8
21
Brakes
10
24
Cabin Cover
18
50
Condition Inspection
1
Control System
9
15
Diversions
46
6
Doors
77
144
Electrical
24
60
Elevator
38
80
Empennage
27
56
Engine
1
Final Assembly
58
174
Finish Kit
167
541
Firewall Forward
91
228
First Flight
1
1
Flaps
22
35
Flying
3
Fuel System
4
10
Fuel Tanks
45
80
Fuselage
192
375
Horizontal Stab
26
59
Interior
14
22
Lighting
4
5
Maintenance
3
3
Milestones
11
0
Miscellaneous
35
78
Paint
71
139
Panel
118
375
Phase I
12
16
Pre-Flight
7
34
Prep
4
18
Prop
1
2
Rudder
16
34
Shop
20
56
Tailcone
46
96
Tools
12
12
Vertical Stabilizer
14
44
Wing Leading Edge
38
57
Wings
147
272
Wings
1
Copyright © 2001-2025 Matronics. All Rights Reserved.