All the wing parts are now deburred and dimpled. I'll wait until after Airventure to start the etching, alodining, and priming.
If you are going to Airventure, look me up at the RV-10 HQ at Camp Scholler. A map can found at: http://www.myrv10.com/osh/2008_RV10HQ_Campsite_Layout_Group1.jpg