KitLog pro

Powered By Kitlog Pro v2.0

Bob Leffler's RV-10
' style=
Date:  4-30-2013
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Heater Control Cables & Purge Valve Control Cable

I installed the the fittings for the bowden cables for the heater controls.

I installed three adel clamps on the purge valve control cable.

I installed some spiral wrap on the spark plug cables.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.