KitLog pro

Powered By Kitlog Pro v2.0

Bob Leffler's RV-10
' style=
Date:  2-28-2012
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Crossbow Magnetometers wired

I wired both Crossbow magnetometers to their respective EFIS. I installed six adel clamps in support of that wiring. As you can see from the last photo, I still have more wiring to complete in the tail.
' style=

Magnetometers wired

Magnetometers wired

' style=

Three adel clamps installed on the builkhead

Three adel clamps installed on the builkhead

' style=

Two adel clamps on the j-channel

Two adel clamps on the j-channel

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.