Brief Description: Seats Rails, Insulation, and Comm Antenna cable ru
While I was resolving the hole alignment issue and installing the front seat rails, Janice made some templates for cutting out insulation. She then installed the insulation on both sides of the aircraft.
We then attempted to pull the antenna cable for the two comm radios, but the pull strings weren't in the holes after the fuseelage returned from painting. I have to come up with a plain B. There are about 50 pulled rivets per seat pan if I have to go that route.