KitLog pro

Powered By Kitlog Pro v2.0

Cowboy's RV-10
247 Logs Found 
 Date
Hours
Work Log Summary

Details

 08-15-2012
2.5
Cleaned Proseal from R-Tank Ribs
Details
       

 08-08-2012
1.5
Remove Proseal from R-Tank Ribs
Details
       

 08-07-2012
4.0
Remove Proseal from L-Wing Skin
Details
       

 08-06-2012
3.0
That's Right, Disassemble the L-Tank!!!
Details
       

 08-05-2012
2.0
Rivet L-Tank Bottom Ribs to Inner Ribs
Details
       

 08-02-2012
2.5
Rivet L-Tank Top Skin to Inner Ribs
Details
       

 07-31-2012
2.0
Proseal L-Tank Inner Ribs
Details
       

 07-30-2012
2.0
Soda Blast Tank Rib Edges for Proseal
Details
       

 07-29-2012
2.5
Riveted L-Flap TE
Details
       

 07-29-2012
1.5
Cleaned and Prepped L-Tank and Ribs for Proseal
Details
       

 07-26-2012
1.5
Proseal L-Flap TE
Details
       

 07-24-2012
1.5
Rivet R-Flap TE; Press brass bushing into Flap Hin
Details
       

 07-23-2012
2.0
Prep R-Flap for Rivetting
Details
       

 07-21-2012
1.5
Proseal TE of R-Flap
Details
       

 07-20-2012
5.5
Rivet R-Flap to Spar; Blind Rivet L & R Flap Nose
Details
       

 07-19-2012
4.3
Rivet L-Flap Skins to Spar; Rivet Top Skin to Ribs
Details
       

 07-18-2012
2.5
Rivet R-Flap Skeleton;Assemble L LE skins to Skele
Details
       

 07-17-2012
3.0
Rivet L-Flap Ribs and Sub Assemblies
Details
       

 07-16-2012
2.0
Rivet R-Flap Hinge Subassemblies
Details
       

 07-15-2012
5.0
Prime LE Skins;Rivet L Flap Hinge Subassemblies
Details
       

 07-14-2012
2.5
Prime all Flap parts, Left and Right
Details
       

 07-13-2012
2.0
Clean L & R Flap Skins and Ribs for Priming
Details

 07-12-2012
1.0
Dimple R-Flap Spar and Ribs
Details
       

 07-11-2012
2.0
Soda Blast R-Flap Ribs; Dimple R-Flap Skins
Details
       

 07-09-2012
2.1
Scotchbrite and Debur R-Flap Assy
Details
       

 07-08-2012
7.8
Match Drill Skeleton, Skins, C-Skin Hinges and TE
Details
       

 07-07-2012
6.3
Soda Blast L-Flap Ribs; Assemble R-Flap
Details
       

 07-06-2012
10.5
Final DrillSkins and Ribs of L-Flap
Details
       

 07-05-2012
1.8
Rivet R-Aileron TE; Install hardware
Details
       

 07-05-2012
7.0
Cleco L-Flap Assembly Together
Details
       

 07-04-2012
2.3
Rivet Left Aileron TE; Install Hardware
Details
       

 07-01-2012
1.3
Right Aileron TE Proseal and Clamp
Details
       

 07-01-2012
5.5
Mark and Debur L Flap Ribs, Doublers, and Hinge Br
Details
       

 06-30-2012
1.5
L Aileron Trailing Edge Proseal and Clamp
Details
       

 06-26-2012
1.5
Rivet R Aileron Nose and Main Ribs; Pop rivet C-we
Details
       

 06-24-2012
5.0
Rivet Bottom Aileron Skins, end Ribs, and C-Balanc
Details
       

 06-21-2012
1.0
Rivet Right Aileron Top Skin
Details
       

 06-20-2012
1.0
Rivet L Top Aileron Skin
Details
       

 06-18-2012
2.6
Assemble Left and Right Aileron LE
Details
       

 06-17-2012
4.3
Prime L & R Aileron Parts and Begin L Assy.
Details
       

 06-16-2012
2.0
Prime L and R Aileron Parts
Details
       

 06-10-2012
7.0
Scotchbrite and Dimple L and R Ailerons
Details
       

 06-09-2012
2.5
L and R Aileron TE Countersink
Details
       

 06-03-2012
3.0
Final Drill Right Aileron
Details
       

 06-02-2012
5.0
Final Drill Left Aileron
Details
       

 05-28-2012
2.7
Final Drill and Temp Assemble Bottom Skins
Details
       

 05-27-2012
5.7
Prime Skins and Stiffeners; Back-rivet same
Details
       

 05-26-2012
5.0
Final Drill, Debur, Dimple Aileron Skin and Stiffe
Details
       

 05-25-2012
6.7
Aileron Bracket Fitting and Skin Stiffener Constr
Details
       

 05-10-2012
1.0
Final-Drill Outboard Right Aileron Hinge Bracket
Details
       

 05-02-2012
4.0
Refine Fuel Tank Sensor Location
Details
       

 04-30-2012
2.5
Calculate Low Fuel Sensor Location
Details
       

 04-29-2012
1.0
Rivet and Proseal Xtended Tank Flanges
Details
       

 04-27-2012
0.5
Determine Low Fuel Sensor Location
Details
       

 04-25-2012
0.5
Proseal Xtra Rng Tank Bungs to Tank End Ribs
Details
       

 04-24-2012
1.0
Drill Tank End Ribs for Xtra Rng Tank Bungs
Details
       

 04-23-2012
1.0
Drill Extended RngTank Fuel Flange Adapters
Details
       

 04-22-2012
1.4
Drill Left Aileron Outboard Hinge Bracket
Details
       

 04-17-2012
2.0
Drill Right Aileron Counterbalance
Details
       

 04-16-2012
1.5
Drill Right Aileron Nose Ribs to Spar
Details
       

 04-15-2012
4.0
Encapsulate shop heads with Proseal, rivet Tanks R
Details
       

 04-14-2012
2.0
Rivet Right Wing Drain and Fuel Cap Flanges
Details
       

 04-12-2012
2.5
Right Wing Tank Stiffener Riveting
Details
       

 04-11-2012
2.5
Right Wing Tanks Stiffener Riveting
Details
       

 04-10-2012
2.5
Left Wing Tank Bottom Stiffener Riveting
Details
       

 04-09-2012
2.0
Left Wing Bottom Stiffener Riveting
Details
       

 04-08-2012
1.5
Rivet Top Left Wing Tank Stiffeners
Details
       

 04-07-2012
4.8
Proseal Right Tank Stiffeners
Details
       

 04-06-2012
6.0
Left Wing Tank Stiffeners and End Rib Proseal
Details
       

 04-05-2012
4.5
Prep Wing Tank Hardware for Proseal
Details
       

 04-04-2012
1.0
Right Tank Attach Bracket Riveting
Details
       

 04-03-2012
1.0
Right Tank Attach Bracket Sub-Assembly
Details
       

 04-02-2012
0.6
Left Tank Attach Bracket Riveting
Details
       

 04-01-2012
4.0
Left Tank Attach Bracket Sub-Assembly
Details
       

 03-31-2012
0.1
Aileron and Flap Torsion Box Assy
Details
       

 01-08-2012
3.5
Assemble and Drill L-aileron Nose Structure.
Details
       

 01-07-2012
3.5
Construct Flap and Aileron Cradle, Inventory
Details
       

 01-02-2012
3.5
Finish Dimpling L/R Tank Skins
Details
       

 01-01-2012
3.5
Fit Check L-Tank Assy and begin Dimpling
Details
       

 12-31-2011
9.0
Wing Tanks Sub-Structure C-sink and Dimple
Details
       

 12-30-2011
2.3
Deburring, C-sink, and Dimple Tank Parts
Details
       

 12-29-2011
5.0
Torsion Box Assembly Table (continued)
Details
       

 12-28-2011
4.0
Begin Torsion Box Assembly Table
Details
       

 12-26-2011
1.1
Scotchbrite Inside Tank Skin Rivet Lines
Details
       

 12-23-2011
7.8
R-Tank Assy, Match Drill, Label, and Disassemble
Details
       

 12-22-2011
5.5
R Tank Stiffeners and Rib Assembly
Details
       

 12-21-2011
8.5
LTank Assemble and Match/Final Drill
Details
       

 12-20-2011
6.0
Assemble L-Tank with Stiffeners and Ribs
Details
       

 12-19-2011
2.0
Fabricate Tank Attach Zees and J-Stiffeners
Details
       

 12-18-2011
5.5
Re-straighten ribs and Trim Tank Stiffeners
Details
       

 09-05-2011
2.5
Flute Fuel Tank Ribs
Details
     

 09-04-2011
3.0
Wing Cradle Contruction
Details
       

 08-28-2011
8.0
Riveted R & L Wing LE Assy to Main Spars
Details
       

 08-27-2011
2.0
Assembled R Wing LE Assy to R-Wing Spar
Details
       

 08-26-2011
3.5
Finish riveting the RightWing LE wing assembly
Details
       

 08-25-2011
1.5
Continue riveting the Right Wing LE wing assembly
Details
       

 08-24-2011
1.5
Began rivet the Right Wing LE wing assembly
Details
       

 08-23-2011
2.0
Finished riveting the Left Wing LE wing assembly
Details
       

 08-22-2011
1.5
Continue riveting the Left Wing LE wing assembly
Details
       

 08-21-2011
4.2
Left Wing LE assemble and begin riveting
Details
       

 08-07-2011
2.0
Reassembled Leading Edges after priming
Details
       

 07-24-2011
2.5
Primed all LE Wing Parts
Details
       

 07-14-2011
1.0
Dimple LE L-Wing
Details
       

 07-12-2011
2.0
Dimple all LE Parts Except L-Skin
Details
       

 07-10-2011
7.7
Debur and Prep LE of Wings for Dimpling and Primer
Details
       

 07-09-2011
11.0
Fit Outboard Leading Edge Left and Right
Details
       

 07-07-2011
1.0
Created Cradle Assy for Leading Edge and Tanks
Details
     

 07-06-2011
1.5
Leading Edge Rib Trim Left and Right
Details
     

 07-04-2011
2.0
1 Leading Edge - Flute Ribs & make J-Stiffeners
Details
       

 07-04-2011
1.5
0 Rivetted Top Skin 5 rear inner rivets
Details
       

 07-03-2011
4.5
Rivet Top Right Wing Skins
Details
       

 06-27-2011
1.5
R Wing Align and Cleco Top Skins
Details
       

 06-26-2011
6.5
L WingTop Outboard & Inboard Wing Skin Riveting
Details
       

 06-25-2011
1.5
L Wing Top Outboard Skin Riveting
Details
       

 02-13-2011
2.0
Reassemble Left Wing for Rivetting
Details
       

 01-30-2011
10.0
Scuff,Dimple, and Prime L & R Wing Top Skins
Details
       

 01-29-2011
8.5
Match Drill and Machine C-Skin R-Wing Top Skins
Details
       

 01-28-2011
2.0
Cleco on the R-Wing Skins
Details
       

 01-27-2011
1.3
Dimpled Top of L-Wing Ribs and Rear Spar
Details
       

 01-26-2011
1.5
Blend Left Top Outer Wing Skin Joint
Details
       

 01-25-2011
2.0
Blend Left Top Inner Wing Skin Joint
Details
       

 01-23-2011
6.8
Final Drill L-Wing Top Skin
Details
       

 01-22-2011
2.7
Cleco L-Wing Top Skins
Details
       

 01-22-2011
6.3
0Reassemble and Rivet L & R Spars to Wing Ribs
Details
       

 01-21-2011
5.0
Prime all Rear Spar Parts
Details
       

 01-20-2011
2.0
Disassemble and Deburr Edges and Holes of Parts
Details
       

 01-19-2011
0.5
Dimpled L & R Rear Spar Upper Flange
Details
     

 01-18-2011
2.7
Match Drill R-Wing Rear Spar and Doubler Plates
Details
       

 01-17-2011
4.0
Match Drill L-Wing Rear-Spar and Doubler Plates
Details
       

 01-16-2011
2.3
Assemble Aileron Brackets, press Brngs, Rivet Assy
Details
       

 01-15-2011
6.3
Construct Aileron Hinge Brackets
Details
       

 01-14-2011
2.6
Install and Torque L & R Wing Rib Bolts
Details
       

 01-13-2011
2.3
Rivet Ribs to R-Wing Spar
Details
       

 01-12-2011
2.0
Rivet Ribs to Left Wing Spar
Details
       

 01-11-2011
1.3
Assemble Wing Ribs to L-Spar
Details
       

 01-09-2011
3.3
Rivet Flap Hinges and Torque Tube Assy
Details
       

 01-03-2011
0.5
Assemble Flap and Aileron Torque Tube Hardware
Details
       

 12-30-2010
6.0
Clean and Prime Ribs and related Hardware
Details
       

 12-29-2010
2.5
Enlarge Pilot Holes for Conduit
Details
       

 12-24-2010
6.0
Ribs Deburred and Scotchbrite for Priming
Details
       

 12-22-2010
2.0
R-Wing Debur Lightening Holes
Details
     

 12-21-2010
2.3
L-Wing Ribs Debur Lighting Holes.
Details
       

 12-20-2010
5.5
Assemble R-Wing to Spar; Debur L-Wing Ribs
Details
       

 11-28-2010
3.0
2-Assemble Left Wing Ribs to Spar
Details
       

 11-28-2010
3.5
1-Wing Rib Preparation
Details
       

 10-14-2010
1.0
L-Wing Drill Flap Hinge and Brackets
Details
       

 10-13-2010
0.8
L-Wing Match Drill Torque Tube Support Brackets
Details
       

 10-10-2010
1.0
L-Wing Manufacture Torque Tube Bracket Spacers
Details
     

 09-26-2010
2.0
Iinstall Tie-Downs on L & R Wing
Details
       

 09-26-2010
3.5
Flute and Straighten All Wing Ribs
Details
     

 09-25-2010
6.5
Wing Tank / Wing Attach Nutplates, Tie Down
Details
       

 09-25-2010
1.0
Right Spar Upper Flange Tank Nutplates
Details
       

 09-24-2010
1.2
Right Spar Tank & Access Nutplates
Details
       

 09-23-2010
1.0
Left Spar Fuel Tank / Access Nutplates
Details
       

 09-22-2010
1.5
Left Spar Rivet Top Flange Tank Nutplates
Details
       

 09-21-2010
1.0
Left & Right Wing Spar - Spot Prime
Details
       

 09-19-2010
7.0
Left & Right Spar Lower/Upper Countersink
Details
       

 09-18-2010
3.5
Left & Right Spar Lower Flange Countersink
Details
       

 09-16-2010
1.5
Right Spar - Drilling J-Stiffeners and Spar Ext.
Details
       

 09-15-2010
1.5
Right Spar - Drilling J-Stiffeners
Details
       

 09-13-2010
0.3
Shim up Right Spar from sagging
Details
     

 09-12-2010
5.7
Fabricate Left Wing Wing Box J-Stiffeners
Details
       

 08-02-2010
1.2
Rivet Spar Splice Plates L&R
Details
       

 08-01-2010
3.1
Final Drill, Prime, Re-cleco Spar Web Extentions
Details
       

 07-25-2010
1.5
Fit L&R Main Spar Web Extentions
Details
       

 03-18-2010
1.5
Install Spar Snap Bushings
Details
       

 02-16-2010
1.8
Trim Mount Bracket Assembly
Details
       

 02-15-2010
5.0
Assemble/Rivet Pushrod, Fit / Adjust Rudder Travel
Details
       

 02-14-2010
7.0
Pushrod Assy / Trim Servo Installation
Details
       

 02-13-2010
4.5
Drill, Debur, and Prime Trim Mount Bracket Assy
Details
       

 02-12-2010
3.0
Elevator Stop Adjust & Pushrod Assembly Built
Details
       

 02-10-2010
2.2
Install Elevators and Stop Adjustment
Details
       

 02-09-2010
1.0
Vertical Stabilizer Installation
Details
       

 02-08-2010
2.5
Drill Hz Stab Fwd Spar and Spacers to Tailcone
Details
       

 02-07-2010
2.5
Drill Hz Stabilizer Rear Spar to Attach Bars
Details
       

 02-06-2010
3.5
Match-Drill Elevator Horn and Pushrod Bolt Hole
Details
       

 02-06-2010
4.5
Elevator Installation
Details
       

 01-31-2010
4.5
Attaching Battery / Bellcrank Mount
Details
       

 01-30-2010
3.5
Riveted The Aft Top Skin
Details
       

 01-29-2010
2.0
Rivet and Install Aft Deck Hardware
Details
       

 01-24-2010
1.5
Rivet Rudder Stops, Static Ports
Details
       

 01-24-2010
5.8
Rivet Bellcrank Ribs and Aft Deck
Details
       

 01-23-2010
8.0
Riveted Left Side Skin
Details
       

 01-22-2010
1.0
Rivet Left Skin to Bottom Skin
Details
       

 01-20-2010
0.9
Rivet Behind J-Channel at Bulkheads
Details
       

 01-18-2010
2.0
Rivet Aft Bulkheads, Cleco Left Skin
Details
       

 01-17-2010
7.8
Rivet Right Side Skin, Bulkheads, and Stiffeners
Details
       

 01-16-2010
9.7
Rivet Bellcrank, Batt Mount, Bulkheads, Bottom Sif
Details
       

 01-10-2010
7.0
Rudder Cable Fairing & Tail Cone Prime
Details
       

 01-09-2010
2.0
Rudder Cable Fairing Template
Details
       

 01-03-2010
1.8
Drill Elev Bellcrank Assy & Trim Cable Anchor Brac
Details
       

 01-02-2010
2.0
Drilling and Deburring Battery / Bellcrank Mount
Details
       

 01-01-2010
2.0
Dimple Bulkheads & Stiffeners
Details
       

 12-31-2009
2.5
Dimple Side Skins, C-Sink Longerons & Static Ports
Details
       

 12-30-2009
1.8
Dimple Side Skins
Details
       

 12-29-2009
1.6
Dimple Bottom and Top Skins
Details
       

 12-28-2009
1.6
Countersink Longerons, Dimple Cover Plates
Details
       

 12-21-2009
2.6
Edge Roll Skins, Dimple F-1012 Bulkhead and Relate
Details
       

 12-20-2009
8.0
Debur & Scotchbrite Stiffeners & Skins, Fit Static
Details
       

 12-19-2009
1.0
Debur & Scotchbrite Stiffeners
Details
     

 12-18-2009
1.5
Debur & Scotchbrite More Frames & Bulkheads
Details
       

 12-17-2009
1.1
Debur & Scotchbrite Frames & Bulkheads
Details
     

 12-16-2009
0.5
Debur & Scotchbrite Small Bulkheads
Details
     

 12-14-2009
1.5
Debur & Scotchbrite Small Parts
Details
     

 12-13-2009
4.0
Remove Tool Marks and Debur Edges
Details
     

 12-12-2009
5.1
Drilling Aft Deck, Disassemble Tail Cone
Details
       

 12-11-2009
4.3
Install and Drill Top Skins and Stiffeners
Details
       

 12-11-2009
1.5
Drilling Skins, Frames, and Bulkheads
Details
     

 12-06-2009
6.3
Cleco Aft Deck, Drill Longerons
Details
       

 12-05-2009
1.8
Drill Rudder Stop, Cleco Bulkhead and Bellcrank Ri
Details
       

 11-24-2009
0.5
Rudder Stop Skin Stiffeners
Details
     

 11-22-2009
3.2
Assemble and drill Side Skin Stiffeners
Details
       

 11-22-2009
0.2
Aft Bulkhead Assembly
Details
     

 11-21-2009
1.6
Manufacture Longerons
Details
       

 11-21-2009
1.4
Assembled and drilled Bottom Skin to Stiffener
Details
       

 11-15-2009
2.5
Constructing Fuselage Bulkheads
Details
       

 11-15-2009
5.0
Assembled Bulkhead / contructed Fuselage Stiffener
Details
       

 11-11-2009
2.0
Aft Bulkhead and Tie Down Bar
Details
       

 11-08-2009
1.0
Trimming and Attaching Elevator Counter Weights
Details
     

 08-30-2009
2.0
Edge Riveting Skin of Vertical Stab
Details
       

 08-23-2009
1.0
Rivet Nose Rib and Front Spar
Details
       

 08-23-2009
1.0
Rivet Middle Inspar Rib and upper front spar
Details
       

 08-23-2009
1.0
Assemble Vertical Stab Skin to the skeleton.
Details
       

 07-10-2009
1.0
Rib Riveting of the Vertical Stab
Details
       

 07-09-2009
1.0
Front Spar Doubler Rivets
Details
       

 07-08-2009
1.0
More on replacing sub-standard rivets
Details
       

 07-05-2009
2.0
Reassemble and rivet Rear Spar
Details
       

 07-05-2009
1.0
Drill and redo rejected rivets
Details
       

 05-24-2009
1.0
Rolled Rudder Leading Edge and Blind Rivet
Details

 05-24-2009
2.0
Rolled Elevator Leading Edge and Blind Rivet
Details

 05-24-2009
3.0
Elevator Trim Tabs
Details
       

 05-23-2009
4.0
Rudder Assembly and Back-Riveting
Details
       

 05-23-2009
6.0
Elevators Assembly and Back-Riveting
Details

 05-22-2009
3.0
Hz Stab Rear Spar Riveting
Details
       

 05-22-2009
4.0
Hz Stab Front Spar / Rib Assembly / Riveting
Details
       

 05-22-2009
5.0
Horizonal Stab Skin Riveting
Details
       

 05-21-2009
6.0
Rudder Assembly, Match Drill, Debur, & Dimple
Details

 05-21-2009
6.0
Elevators Match Drill, Debur, Scuff, & Dimple
Details

 05-21-2009
3.0
Assemble, match drill, and debur vertical stab
Details

 05-20-2009
5.0
Horizonal Stab Disassembled, Deburred, Dimpled
Details
       

 05-20-2009
6.0
Elevator Assembly
Details
       

 05-19-2009
6.0
Horizonal Tail Assembled
Details
       

 05-19-2009
5.0
Horizonal Stab Match Drilling and Dimpling
Details
       

 05-18-2009
8.0
Front / Rear Spar Assembly
Details
       

 05-18-2009
2.0
Empennage Kit Inventory
Details
       

 04-17-2009
0.1
Purchase RV-10 Emp/Cone Kit
Details

 04-01-2009
0.1
RV Tail Kit Program
Details
     











Copyright © 2001-2013 Matronics. All Rights Reserved.