KitLog pro

Powered By Kitlog Pro v2.0

Cowboy's RV-10
' style=
Date:  5-21-2009
Number of Hours:  3.00
Manual Reference:  6-2 / 6-3
Brief Description:  Assemble, match drill, and debur vertical stab

- Trimmed flange material from two Rear Spar Caps and deburred.
- Clamped Rear Spar Caps into Rear Spar flanges. My first try I did not get these aligned and fully aligned next to the spar flanges. Reworked the clamps and properly seated the Spar Caps.
- Match drilled the Rear Spar Assembly per the instructions.
- Countersunk the #30 holes on the Rear Spar Doubler but went 4 holes beyond the Upper Attach Bolt Holes per the instructions. This was unintentional, unnecessary, but not a problem. It just means using a few more countersunk rivets.
- Assembled Vertical Stab skeleton assembly and match drilled the remaining holes
- Attached skin to skeleton and match drilled.
- Dissassembled Vertical Stab and deburred, scotchbrited, and dimpled relevant parts.
- All Vertical Stab parts went into the pile to be primed that evening.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.