KitLog pro

Powered By Kitlog Pro v2.0

Cowboy's RV-10
' style=
Date:  5-19-2009
Number of Hours:  5.00
Manual Reference:  8-9
Brief Description:  Horizonal Stab Match Drilling and Dimpling

-Deburring and smoothing edges was done after assembly and match drilling
- Machine countersinking the Front Spar Doubler was done after Stab assembly
- Final drill of Front Spar Attachment Brackets were done after Stab assembly
-Riveting of Front Spar Doubler and Spar Caps were done after debur and priming
-Horizonal Stabilizer Spar and Rib assembly were match drilled prior to clecoing skins.
-Skins were match drilled
' style=

Match drilling

Match drilling

' style=

More match drilling

More match drilling

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.