Date
|
Hours
|
Work Log Summary

|
Details

|
01-09-2021
|
2.10
|
more parts cleaning
|
Details
|
  |
|
01-08-2021
|
1.00
|
parts cleaning
|
Details
|
  |
|
01-02-2021
|
1.60
|
More upper window fitting / bench cleanup
|
Details
|
 |
|
12-31-2020
|
1.60
|
Windshiled trim and upper window install
|
Details
|
  |
|
12-21-2020
|
1.60
|
Rivet upper window side pieces
|
Details
|
  |
|
12-20-2020
|
2.80
|
Upper fuse skin rivet / tail rivet / paint upper p
|
Details
|
|
|
12-17-2020
|
2.00
|
Prepping tail for closure
|
Details
|
 |
|
12-09-2020
|
1.50
|
Install Left Rear vinyl stripe
|
Details
|
 |
|
12-08-2020
|
2.50
|
Finish Flaperons / Apply left front vinyl stiripe
|
Details
|
|
|
12-07-2020
|
3.00
|
Paint top of 4 flaperons / repaint lower horiz sta
|
Details
|
|
|
12-06-2020
|
1.50
|
Prep Flaperons
|
Details
|
  |
|
12-04-2020
|
2.20
|
Paint underside of horizontal stab & elevator
|
Details
|
  |
|
12-02-2020
|
1.20
|
First coat of horizontal stab & elevator
|
Details
|
|
|
12-01-2020
|
1.00
|
Panel tidy up and cable install
|
Details
|
 |
|
11-30-2020
|
0.50
|
"finessing" the elevator to horiz stab clearance
|
Details
|
  |
|
11-28-2020
|
1.30
|
Start rivet of horizontal stab tips to stabilizer
|
Details
|
 |
|
11-27-2020
|
1.50
|
Elevator paint prep / wiring cleanup
|
Details
|
  |
|
11-26-2020
|
1.00
|
Paint Prep
|
Details
|
  |
|
11-23-2020
|
0.80
|
Motor mount bolts / throttle cable
|
Details
|
  |
|
11-21-2020
|
1.60
|
Finish right vinyl decals; started left side
|
Details
|
|
|
11-20-2020
|
2.00
|
Finish Right side stripe
|
Details
|
 |
|
11-17-2020
|
1.90
|
Install right side front vinyl graphic
|
Details
|
 |
|
11-16-2020
|
1.30
|
Motor Mount / Vinyl Graphic
|
Details
|
  |
|
11-15-2020
|
2.00
|
More motor mount alignment & vinyl side trim
|
Details
|
 |
|
11-14-2020
|
1.50
|
Finalize (?) Motor Mount angle
|
Details
|
 |
|
11-13-2020
|
0.80
|
Trial install of motor mount
|
Details
|
 |
|
11-06-2020
|
0.80
|
Test Elevator Trim Servo / Calibrate Torque Wrench
|
Details
|
  |
|
11-04-2020
|
2.80
|
Continuation of Horiz Stab Service Builletin
|
Details
|
|
|
11-03-2020
|
3.60
|
Horiz Stab Service Bulletin
|
Details
|
|
|
11-01-2020
|
2.00
|
Avionics Config / Prep winyl insignia
|
Details
|
|
|
10-31-2020
|
1.50
|
checkout / configuration of EFIS
|
Details
|
  |
|
10-30-2020
|
1.30
|
Panel repairs
|
Details
|
 |
|
10-29-2020
|
1.80
|
First Power-On!
|
Details
|
|
|
10-26-2020
|
3.00
|
Finished panel wiring
|
Details
|
|
|
10-24-2020
|
2.60
|
almost final wiring cleanup
|
Details
|
|
|
10-21-2020
|
2.20
|
final wiring cleanup
|
Details
|
|
|
10-20-2020
|
1.60
|
more wiring harness finalization
|
Details
|
|
|
10-18-2020
|
1.20
|
Add connectors to stick grip harness
|
Details
|
 |
|
10-17-2020
|
2.00
|
still wiring cleanup
|
Details
|
  |
|
10-16-2020
|
4.80
|
Start of wiring cleanup
|
Details
|
|
|
10-14-2020
|
1.10
|
Wiring mag switch harnesses
|
Details
|
|
|
10-13-2020
|
1.00
|
3rd redeisgn of stick grip wiring
|
Details
|
 |
|
10-12-2020
|
2.30
|
Wiring close to the end
|
Details
|
  |
|
10-11-2020
|
2.20
|
more wiring
|
Details
|
  |
|
10-07-2020
|
3.00
|
Various panel tasks
|
Details
|
|
|
10-04-2020
|
2.00
|
getting close to finishing the wiring
|
Details
|
  |
|
10-02-2020
|
3.20
|
More wiring
|
Details
|
  |
|
10-01-2020
|
1.60
|
Fuel Selector installation
|
Details
|
|
|
09-29-2020
|
1.60
|
Right side wiring
|
Details
|
|
|
09-28-2020
|
1.30
|
Fuselage wiring to panel
|
Details
|
|
|
09-26-2020
|
3.40
|
More wiring detail
|
Details
|
|
|
09-25-2020
|
1.50
|
wiring cleanup
|
Details
|
  |
|
09-24-2020
|
3.20
|
Misc wiring / console / panel tasks
|
Details
|
|
|
09-22-2020
|
2.20
|
Console work / panel stiffener finessing
|
Details
|
|
|
09-21-2020
|
0.50
|
Minor prep work
|
Details
|
  |
|
09-10-2020
|
1.50
|
Finish up panel wiring
|
Details
|
 |
|
09-09-2020
|
2.70
|
more wiring; connect data paths
|
Details
|
 |
|
09-08-2020
|
0.60
|
minor cleanup work to kill time
|
Details
|
 |
|
09-06-2020
|
3.00
|
Misc Panel work
|
Details
|
 |
|
09-05-2020
|
1.00
|
continued panel work
|
Details
|
  |
|
09-04-2020
|
1.70
|
Redesigned Xpndr Wiring / Flap wiring / misc
|
Details
|
|
|
09-02-2020
|
1.60
|
more wiring
|
Details
|
  |
|
08-31-2020
|
2.80
|
More panel work
|
Details
|
|
|
08-30-2020
|
1.50
|
Initial wiring of panel
|
Details
|
  |
|
08-29-2020
|
3.30
|
Prove concept for trim / mount hardware to panel
|
Details
|
 |
|
08-25-2020
|
3.50
|
various
|
Details
|
|
|
08-23-2020
|
3.20
|
Paint panel / torque tube rear bracket
|
Details
|
|
|
08-22-2020
|
0.60
|
prep for paint
|
Details
|
 |
|
08-21-2020
|
1.40
|
Finish map box installation
|
Details
|
|
|
08-21-2020
|
0.40
|
Finish avionic rack HW install
|
Details
|
|
|
08-19-2020
|
1.50
|
Nutplates for EFIS / map box installation
|
Details
|
|
|
08-18-2020
|
1.20
|
Cut / Drill final holes in panel
|
Details
|
|
|
08-17-2020
|
1.30
|
Cut and fit the panel openings for the map box and
|
Details
|
  |
|
08-16-2020
|
3.30
|
More wire labels & drill the panel
|
Details
|
|
|
08-15-2020
|
1.80
|
Solder headphone jacks / label wires
|
Details
|
|
|
08-14-2020
|
2.30
|
Comm / Xpnder Harness Work
|
Details
|
 |
|
08-09-2020
|
2.20
|
Cleanup / finish right seat rivet
|
Details
|
 |
|
08-06-2020
|
0.60
|
Misc Riveting
|
Details
|
  |
|
07-27-2020
|
1.20
|
final elevatr ctrl rod install / verify motor mou
|
Details
|
  |
|
07-26-2020
|
2.70
|
Wire correction / bolt-up torque tube hardware
|
Details
|
 |
|
07-18-2020
|
1.00
|
Work on torque tube assemblies & area
|
Details
|
  |
|
07-17-2020
|
2.70
|
Nutplates on torque tube tunnel top
|
Details
|
|
|
07-16-2020
|
1.30
|
Cool down the garage
|
Details
|
|
|
07-13-2020
|
1.40
|
Install right side seat sliders / install grommets
|
Details
|
|
|
07-11-2020
|
1.10
|
Seat adjuster install / misc other items
|
Details
|
|
|
07-10-2020
|
3.40
|
Install seat bases
|
Details
|
|
|
07-06-2020
|
1.70
|
Finish fuselage wiring
|
Details
|
|
|
07-05-2020
|
0.80
|
"Adjust" elevator control bellcrank
|
Details
|
 |
|
07-02-2020
|
1.20
|
Install Magnetometer
|
Details
|
 |
|
07-01-2020
|
1.10
|
Fab GPS antenna shelf / rivet seat back stops / fa
|
Details
|
|
|
06-30-2020
|
1.30
|
still more punchlist items
|
Details
|
|
|
06-29-2020
|
3.20
|
even more punchlist items
|
Details
|
  |
|
06-26-2020
|
2.30
|
more punchlist work
|
Details
|
|
|
06-25-2020
|
2.30
|
punch list items
|
Details
|
|
|
06-21-2020
|
1.60
|
Add cabin heat cable bracket / rivet vertical post
|
Details
|
|
|
06-20-2020
|
2.50
|
Antennae / coax / cabin heat
|
Details
|
 |
|
06-18-2020
|
0.80
|
ADSB planning / prime interior parts / install bat
|
Details
|
 |
|
06-17-2020
|
2.00
|
Cabin side heater details & crankcase breather
|
Details
|
|
|
06-16-2020
|
3.20
|
Brain work / redesign stick wiring
|
Details
|
 |
|
06-15-2020
|
0.00
|
Install defroster flange
|
Details
|
|
|
06-15-2020
|
1.50
|
Drill Transponder antenna / trim glareshield
|
Details
|
|
|
06-13-2020
|
2.80
|
Stick wiring / battery shelf
|
Details
|
|
|
06-11-2020
|
0.50
|
Safety-wire lower bearing block for nose wheel
|
Details
|
|
|
06-11-2020
|
3.00
|
Drain / windshield trim / cabin heat
|
Details
|
|
|
06-08-2020
|
1.90
|
Drill lower instrument panel-to-cabin frame.
|
Details
|
 |
|
06-07-2020
|
0.60
|
Cylinder prep
|
Details
|
  |
|
06-06-2020
|
3.30
|
Fuel system / map box / chocks /
|
Details
|
|
|
06-05-2020
|
1.90
|
Stick grip / engine thoughts / console attachment
|
Details
|
|
|
06-04-2020
|
0.70
|
Finalized gascolator
|
Details
|
  |
|
06-02-2020
|
2.00
|
Nutplates for right side of center console
|
Details
|
  |
|
05-30-2020
|
1.60
|
Install left angle for console side panel / clean
|
Details
|
|
|
05-28-2020
|
2.10
|
Install remainder of left side nutplates
|
Details
|
|
|
05-27-2020
|
0.80
|
Nutplates for console
|
Details
|
  |
|
05-25-2020
|
2.50
|
Wire routing change / Console L-angle install
|
Details
|
|
|
05-22-2020
|
2.80
|
Add nutplates to rack & EIS, then work other panel
|
Details
|
|
|
05-19-2020
|
1.10
|
More panel placement markup
|
Details
|
  |
|
05-18-2020
|
1.70
|
Drill L angles to panel front / install EIS
|
Details
|
|
|
05-17-2020
|
1.20
|
continue avionics rack
|
Details
|
  |
|
05-15-2020
|
3.80
|
Cut first panel holes; design & fab avionics rack
|
Details
|
|
|
05-15-2020
|
0.00
|
Continuation for extra pics
|
Details
|
|
|
05-13-2020
|
1.90
|
Fuel line at bulkhead / upper panel / panel trim
|
Details
|
|
|
05-10-2020
|
1.40
|
Upper Panel Skin finess
|
Details
|
 |
|
05-09-2020
|
1.00
|
Upper panel skin drill
|
Details
|
 |
|
05-07-2020
|
1.50
|
Add L angle stiffeners to underside of upper panel
|
Details
|
 |
|
05-06-2020
|
1.80
|
Finish right door / cut upper panel skin L angles
|
Details
|
|
|
05-05-2020
|
1.60
|
Finish left door; work right door; drill firewall
|
Details
|
|
|
05-04-2020
|
1.20
|
Door finesse work
|
Details
|
  |
|
05-01-2020
|
2.70
|
Completion tasks right door; final trim & fittings
|
Details
|
|
|
04-30-2020
|
1.20
|
Fit left door plexiglass
|
Details
|
 |
|
04-29-2020
|
1.90
|
Finish reconstruction of right door
|
Details
|
  |
|
04-27-2020
|
1.80
|
Re-do right door glass
|
Details
|
 |
|
04-26-2020
|
2.40
|
Final pre-install fitting of windshield
|
Details
|
  |
|
04-24-2020
|
1.90
|
Windshield
|
Details
|
|
|
04-20-2020
|
1.00
|
Drill thru upper panel skin
|
Details
|
 |
|
04-18-2020
|
0.80
|
Fit upper panel to foreward fuse sides
|
Details
|
 |
|
04-16-2020
|
2.20
|
Upper instrument panel cover install
|
Details
|
|
|
04-15-2020
|
1.50
|
Update Panel
|
Details
|
  |
|
04-15-2020
|
1.40
|
Completed right door glass trim & drilling
|
Details
|
|
|
04-14-2020
|
1.40
|
Trim right side door plexiglass
|
Details
|
|
|
04-12-2020
|
2.60
|
Drilled right door "glass", drilled for doorknob,
|
Details
|
|
|
04-11-2020
|
1.00
|
Play with unibit and harness parts
|
Details
|
  |
|
04-10-2020
|
2.10
|
More paint, drilled rivet holes, cracked window
|
Details
|
 |
|
04-09-2020
|
1.00
|
More door prep
|
Details
|
  |
|
04-08-2020
|
1.50
|
Right door frame prep
|
Details
|
  |
|
04-07-2020
|
1.50
|
Adjust right door frame, a lot of painting
|
Details
|
|
|
04-06-2020
|
3.30
|
Initial riveting right door frame
|
Details
|
 |
|
04-02-2020
|
1.60
|
Initial Drilling Right door gussets
|
Details
|
|
|
03-31-2020
|
1.30
|
Finalize metal on left doorframe
|
Details
|
|
|
03-29-2020
|
1.80
|
Rivet left door inner gussets, prep right door
|
Details
|
|
|
03-28-2020
|
2.30
|
Left Door frame assembly
|
Details
|
|
|
03-24-2020
|
2.80
|
Finalize GRT port assignments / create L door fram
|
Details
|
|
|
03-23-2020
|
1.80
|
More GRT digging
|
Details
|
  |
|
03-22-2020
|
2.00
|
Avionics Architecture Connections
|
Details
|
  |
|
03-21-2020
|
2.00
|
Attach hinge for right side door
|
Details
|
  |
|
03-20-2020
|
2.80
|
Install left door upper frame & prep right side hi
|
Details
|
|
|
03-18-2020
|
1.10
|
Upper Door Frame fab
|
Details
|
|
|
03-15-2020
|
1.60
|
Fuel Line Manifold / upper door frame
|
Details
|
|
|
03-14-2020
|
2.90
|
ELT Harness and Bracket
|
Details
|
|
|
03-07-2020
|
1.80
|
Minor cleanup stuff
|
Details
|
  |
|
03-05-2020
|
2.40
|
Finish securing fuel / brake / pitot-static lines
|
Details
|
|
|
03-02-2020
|
2.60
|
Work line placement in controls tunnel
|
Details
|
|
|
03-01-2020
|
1.20
|
Brake lines / Pitot-static
|
Details
|
|
|
02-28-2020
|
1.20
|
Gascolator installation
|
Details
|
|
|
02-26-2020
|
2.60
|
fuel selector / adel clamps on lines / manifold
|
Details
|
|
|
02-23-2020
|
3.80
|
Trying to figure out pump/gascolator locations
|
Details
|
 |
|
02-19-2020
|
2.80
|
Brainstorming fuel lines/fittings/etc
|
Details
|
  |
|
02-17-2020
|
1.80
|
Finish line routing / hole trim on front seat supp
|
Details
|
|
|
02-16-2020
|
2.40
|
Front seat support / panel redesign
|
Details
|
|
|
02-14-2020
|
2.30
|
Update wiring diagram
|
Details
|
 |
|
02-12-2020
|
1.00
|
Prep for fuel line routing
|
Details
|
  |
|
01-08-2020
|
1.10
|
Make up fuel lines
|
Details
|
  |
|
01-05-2020
|
1.30
|
Install Right Side Fuel & electric lines
|
Details
|
|
|
12-29-2019
|
2.50
|
Install Left fuel line & pitot/static & wires
|
Details
|
|
|
12-22-2019
|
1.20
|
Working center armrest contents
|
Details
|
 |
|
12-19-2019
|
1.50
|
Install rudder cables
|
Details
|
|
|
12-18-2019
|
1.20
|
Rework to install new rudder cables
|
Details
|
|
|
12-17-2019
|
1.20
|
Create exit holes for brake lines
|
Details
|
 |
|
12-15-2019
|
1.80
|
Debur & Rivet door weatherstrip channel
|
Details
|
|
|
12-13-2019
|
0.60
|
More line fit tests
|
Details
|
 |
|
12-11-2019
|
1.20
|
Trying to run fuel / pitot / lights wires & lines
|
Details
|
 |
|
12-10-2019
|
3.20
|
More doorframe work
|
Details
|
|
|
11-25-2019
|
1.50
|
Right side lower door sill / doubler
|
Details
|
 |
|
11-23-2019
|
1.70
|
Left Door Sill / Weatherstrip channel
|
Details
|
|
|
11-22-2019
|
2.00
|
Seat belt brackets / seat rails / parts prep
|
Details
|
|
|
11-19-2019
|
1.00
|
Right side vertical fuel line
|
Details
|
  |
|
11-18-2019
|
2.40
|
Fuel line routing
|
Details
|
|
|
11-17-2019
|
1.70
|
Drill holes for fuel lines to wings
|
Details
|
  |
|
11-13-2019
|
4.00
|
Fuel drain prep
|
Details
|
 |
|
11-12-2019
|
2.30
|
Install fairleads rear torque tube / install upper
|
Details
|
|
|
11-08-2019
|
1.40
|
Misc Fuse / controls tasks
|
Details
|
|
|
11-06-2019
|
1.60
|
Rivet front torque tube bearing assy / seat uprigh
|
Details
|
|
|
11-02-2019
|
1.30
|
Fitment of torque tube forward bearing block
|
Details
|
|
|
10-30-2019
|
1.10
|
Initial fitment of front torque tube bearing block
|
Details
|
|
|
10-30-2019
|
2.00
|
Fuel Planning / Rear Torque Tube Fitment
|
Details
|
|
|
10-28-2019
|
1.30
|
Panel design, continued
|
Details
|
|
|
10-28-2019
|
0.40
|
Drill and fit rear torque tube bearing block stop
|
Details
|
  |
|
10-27-2019
|
1.20
|
Panel Planning
|
Details
|
  |
|
10-26-2019
|
1.30
|
Prep parts
|
Details
|
|
|
10-22-2019
|
1.00
|
Correct Nose gear items; set on gear
|
Details
|
 |
|
10-21-2019
|
2.60
|
Nose fork / steering rods / lower bearing bracket
|
Details
|
|
|
10-20-2019
|
1.20
|
Steering Rods / Paint Nose Fork / Bolt Lower Nose
|
Details
|
|
|
10-18-2019
|
1.50
|
Drill axle shaft, mount nose strut
|
Details
|
|
|
10-17-2019
|
2.80
|
Paint Vertical Stab, Nose Strut base, & upper door
|
Details
|
|
|
10-14-2019
|
0.80
|
Inner motor mounts
|
Details
|
  |
|
10-13-2019
|
1.70
|
Riveting / motor mount / parts prep
|
Details
|
|
|
10-12-2019
|
1.20
|
Rivet Firewall / Fwd Fuse Sides / Cabin Frame
|
Details
|
|
|
10-11-2019
|
1.20
|
Re-install firewall, fwd fuselage stiffeners
|
Details
|
|
|
10-11-2019
|
1.00
|
Pack main wheel bearings, mount MLG wheels
|
Details
|
|
|
10-10-2019
|
1.90
|
Finished main gear axles, test fit nose, drilled n
|
Details
|
|
|
10-08-2019
|
1.50
|
Finished rudder pedal center bearing / cotter keys
|
Details
|
|
|
09-28-2019
|
1.50
|
Mount tires
|
Details
|
|
|
09-27-2019
|
1.30
|
Nose Strut Donuts / Start to mount tire
|
Details
|
|
|
09-27-2019
|
1.00
|
Correctly mount MLG leaf
|
Details
|
|
|
09-26-2019
|
2.10
|
Rudder Pedal Install / MLG Mount
|
Details
|
|
|
09-15-2019
|
0.50
|
Install rubber donuts for front suspension
|
Details
|
  |
|
09-09-2019
|
1.30
|
Configure MLG mounting pads
|
Details
|
 |
|
09-08-2019
|
1.90
|
Install left gear saddle weldment & rivet
|
Details
|
|
|
09-06-2019
|
0.30
|
Finish bolting in right gear saddle
|
Details
|
 |
|
09-04-2019
|
1.90
|
Right side gear attach point bolts
|
Details
|
|
|
08-17-2019
|
1.00
|
Install MLG mount hardware
|
Details
|
 |
|
08-15-2019
|
2.80
|
Prepping Main Landing Gear
|
Details
|
|
|
08-13-2019
|
1.30
|
Riveting in gear channel
|
Details
|
|
|
08-11-2019
|
1.40
|
Prep / Prime Motor Mount & Aliodine Upper Panel
|
Details
|
 |
|
08-08-2019
|
1.60
|
Motor Mount fitment
|
Details
|
|
|
08-07-2019
|
1.90
|
Reinstall Cabin Frame / mate with motor mount
|
Details
|
|
|
08-02-2019
|
2.10
|
Nose Gear Bearing Block
|
Details
|
|
|
06-24-2019
|
2.30
|
Secure comm cables & initial fit motor mount
|
Details
|
|
|
06-23-2019
|
1.60
|
Drill Nose Gear Fork for Axle
|
Details
|
 |
|
06-20-2019
|
1.20
|
Nose Strut Lower Bearing Block
|
Details
|
|
|
06-18-2019
|
2.00
|
Setting up stripper / crimping comm ant
|
Details
|
|
|
06-13-2019
|
1.00
|
Rework: Antenna mount
|
Details
|
 |
|
06-08-2019
|
1.00
|
Install Comm Antenna
|
Details
|
|
|
06-06-2019
|
2.00
|
Misc Avionic tasks
|
Details
|
  |
|
06-04-2019
|
1.00
|
Test New Used Comm
|
Details
|
|
|
06-03-2019
|
1.30
|
Up-drill front fork attachment holes
|
Details
|
|
|
05-30-2019
|
2.80
|
Motor mounts / donut suspension / drill nosewheel
|
Details
|
|
|
05-28-2019
|
0.80
|
Prep for new donut suspension
|
Details
|
  |
|
05-27-2019
|
1.80
|
Back to building
|
Details
|
|
|
05-24-2019
|
2.00
|
Paint left side fuselage - 3rd coat
|
Details
|
 |
|
05-22-2019
|
1.50
|
Sand left side as prep for 3rd coat
|
Details
|
  |
|
05-12-2019
|
1.80
|
3rd coat top of fuselage
|
Details
|
 |
|
05-10-2019
|
1.80
|
Finish (?) sanding upper fuselage skin
|
Details
|
 |
|
05-07-2019
|
0.50
|
Sand top fuselage
|
Details
|
  |
|
05-02-2019
|
1.70
|
Paint - second coat, top & left side
|
Details
|
  |
|
04-26-2019
|
2.20
|
Misc cleanup / sanding
|
Details
|
  |
|
04-22-2019
|
2.00
|
Paint fuselage sides
|
Details
|
|
|
04-21-2019
|
2.20
|
Start of Painting
|
Details
|
|
|
04-20-2019
|
4.60
|
Paint Prep
|
Details
|
|
|
04-18-2019
|
3.20
|
Misc Catch-up paint prep stuff
|
Details
|
|
|
04-03-2019
|
1.40
|
Add nutplates to wing inspection cover
|
Details
|
 |
|
03-29-2019
|
8.00
|
Investigate Paint Processes
|
Details
|
|
|
03-25-2019
|
1.50
|
Iniital fitment of brake pedals to rudder pedals
|
Details
|
 |
|
03-21-2019
|
1.00
|
Misc Fuselage tasks
|
Details
|
 |
|
03-18-2019
|
1.50
|
Rivet mated fuselage
|
Details
|
|
|
03-15-2019
|
0.80
|
Mate fuselage
|
Details
|
 |
|
03-14-2019
|
3.20
|
Final riveting forward fuselage
|
Details
|
|
|
03-12-2019
|
0.90
|
Final steps for rivet prep
|
Details
|
 |
|
03-10-2019
|
1.50
|
Updrill / rivet landing gear channel doublers
|
Details
|
 |
|
03-09-2019
|
1.00
|
Fwd Fuse Cleanup / rivet prep
|
Details
|
  |
|
03-07-2019
|
2.30
|
More debur, reassembly, some riveting
|
Details
|
|
|
03-05-2019
|
1.70
|
Continued parts prep for assembly
|
Details
|
 |
|
03-02-2019
|
1.00
|
More fwd fuselge prep
|
Details
|
 |
|
02-28-2019
|
2.00
|
Finish rudder pedal fixtures / deburr / fwd side c
|
Details
|
|
|
02-25-2019
|
2.20
|
Disassemble FWD fuse, start debur, lay-out rudder
|
Details
|
|
|
02-24-2019
|
0.80
|
Up-drill foward side skins
|
Details
|
 |
|
02-22-2019
|
0.00
|
Install motor mounts
|
Details
|
|
|
02-22-2019
|
3.40
|
Finish up initial trial fitments
|
Details
|
|
|
02-20-2019
|
1.20
|
Re-mic crankshaft journals
|
Details
|
  |
|
02-18-2019
|
2.30
|
Cabin Frame to FW and Right Side Fwd Angles
|
Details
|
|
|
02-15-2019
|
2.00
|
Fwd Fuselage L angles & forward angles
|
Details
|
 |
|
01-29-2019
|
1.40
|
Forward skin L angles, miscellany
|
Details
|
 |
|
01-28-2019
|
1.70
|
Drill-out foward skin; mount L skin, mount firewal
|
Details
|
|
|
01-24-2019
|
2.30
|
Seat side rail fitment
|
Details
|
|
|
01-23-2019
|
2.30
|
Install 4 gear channel doublers
|
Details
|
|
|
01-22-2019
|
1.80
|
Left gear mount, left cabin frame reinforcement
|
Details
|
|
|
01-19-2019
|
1.10
|
More fuselage prep work
|
Details
|
|
|
01-18-2019
|
2.00
|
Misc forward fuselage fitment tasks
|
Details
|
 |
|
01-17-2019
|
1.10
|
Install right gear mount weldment
|
Details
|
|
|
01-16-2019
|
1.00
|
Fuselage mate prep
|
Details
|
  |
|
01-15-2019
|
1.10
|
Up-drill cockpit frame
|
Details
|
|
|
01-15-2019
|
1.10
|
Drill cabin frame
|
Details
|
|
|
01-14-2019
|
1.40
|
Mate Fuselage
|
Details
|
|
|
01-13-2019
|
2.10
|
Prep for fuselage mate
|
Details
|
|
|
01-12-2019
|
1.70
|
Finish installing left seat base
|
Details
|
 |
|
01-10-2019
|
2.70
|
Add L-angles to supports & initial seat base insta
|
Details
|
|
|
01-08-2019
|
1.00
|
Initial install Left fwd fuse side
|
Details
|
|
|
01-07-2019
|
3.20
|
More pass side fwd fuselage work
|
Details
|
|
|
01-06-2019
|
1.10
|
Remove powder coating - rudder pedals
|
Details
|
  |
|
01-05-2019
|
2.00
|
Finish L-angle reinforcements, drill seat base
|
Details
|
|
|
01-04-2019
|
2.20
|
Fab L angles & Drill R fuse side
|
Details
|
|
|
12-31-2018
|
1.00
|
Fwd Fuse Alignment
|
Details
|
|
|
12-30-2018
|
0.50
|
Trial fit of Right Fwd Fuse Side Assy
|
Details
|
|
|
12-29-2018
|
1.80
|
More Fwd Fuse initial install
|
Details
|
 |
|
12-23-2018
|
1.50
|
More prep for fwd fuselage
|
Details
|
|
|
12-22-2018
|
0.80
|
Fwd Fuse Longerons
|
Details
|
|
|
12-21-2018
|
1.00
|
Start of Forward Fuselage
|
Details
|
|
|
12-19-2018
|
2.70
|
Finish Firewall
|
Details
|
|
|
12-18-2018
|
1.70
|
Prep firewall for riveting
|
Details
|
 |
|
12-17-2018
|
3.50
|
Firewall Initial Construction
|
Details
|
|
|
12-15-2018
|
1.10
|
Misc parts cleanup
|
Details
|
  |
|
12-13-2018
|
2.70
|
More aft fuselage finish-up work
|
Details
|
|
|
12-12-2018
|
1.20
|
Baggage Compartment wrap-up for now
|
Details
|
|
|
12-01-2018
|
1.50
|
Installing flaperon control tube
|
Details
|
|
|
11-30-2018
|
2.00
|
Prep fitment of flaperon torque tube
|
Details
|
|
|
11-27-2018
|
2.80
|
Cleanup, rivet upper skin, rivet baggage back, pre
|
Details
|
|
|
11-26-2018
|
3.20
|
Upper fwd fuse riveting
|
Details
|
|
|
11-25-2018
|
2.30
|
Flaperon control tube bracket and upper fwd fusela
|
Details
|
  |
|
11-24-2018
|
2.00
|
Flaperon Mixer Control & Brackets
|
Details
|
 |
|
11-22-2018
|
2.00
|
Rivet upper fuse longerons; install ELT antenna do
|
Details
|
|
|
11-21-2018
|
1.70
|
Finish L-angles for baggage floor
|
Details
|
  |
|
11-19-2018
|
1.50
|
More baggage compartment
|
Details
|
|
|
11-18-2018
|
1.30
|
Baggage area buildup
|
Details
|
|
|
11-17-2018
|
3.10
|
Misc aft fuselage cleanup tasks
|
Details
|
|
|
11-16-2018
|
2.50
|
Finish up baggage back, rivet front upper crossmem
|
Details
|
|
|
11-15-2018
|
2.70
|
Baggage Compartment
|
Details
|
|
|
11-10-2018
|
1.00
|
Join sides and bottom panels
|
Details
|
|
|
11-09-2018
|
1.50
|
Finish top aft fuselage panel, prep bottom panel
|
Details
|
|
|
11-08-2018
|
0.80
|
Top Fuse panel "finessing"
|
Details
|
  |
|
11-07-2018
|
2.70
|
Wrapped up right side, started top panel
|
Details
|
 |
|
11-02-2018
|
2.50
|
Start Right Aft Fuselage Panel
|
Details
|
 |
|
11-01-2018
|
2.70
|
Finish up left aft fuse side
|
Details
|
|
|
10-30-2018
|
0.90
|
Parts prep
|
Details
|
  |
|
10-29-2018
|
2.40
|
Stiffeners & longeron for left fuse skin
|
Details
|
|
|
10-28-2018
|
2.40
|
Wrap up bottom panel; start side 1
|
Details
|
 |
|
10-27-2018
|
2.20
|
Almost finished fuselage bottom
|
Details
|
|
|
10-24-2018
|
1.50
|
Most riveting complete
|
Details
|
|
|
10-23-2018
|
0.90
|
Initial riveting
|
Details
|
  |
|
10-20-2018
|
2.30
|
More parts cleanup; initial riveting: Bottom surfa
|
Details
|
|
|
10-19-2018
|
2.90
|
Initial Aft Fuselage Prep Work
|
Details
|
|
|
10-18-2018
|
2.30
|
Leak test fuel tank, rivet top skin,
|
Details
|
|
|
10-14-2018
|
1.60
|
Debur root skins, trial fit upper skin brace, add
|
Details
|
|
|
10-11-2018
|
1.50
|
Left wing fwd root skin
|
Details
|
|
|
09-06-2018
|
0.80
|
Begin fitment of Left Wing inner root skin
|
Details
|
 |
|
08-04-2018
|
1.50
|
Plumb tank, install upper root inner skin
|
Details
|
|
|
08-01-2018
|
1.80
|
Finish Tank Install
|
Details
|
|
|
07-20-2018
|
2.00
|
Left Gas tank prep
|
Details
|
|
|
07-08-2018
|
1.00
|
Prep left wing fuel tank
|
Details
|
  |
|
07-06-2018
|
3.30
|
Rivet Upper Skins
|
Details
|
|
|
07-04-2018
|
1.30
|
Finesse Pitot Tube / Clean FOD / clamp skins for r
|
Details
|
|
|
07-03-2018
|
0.80
|
Prep for riveting
|
Details
|
  |
|
07-02-2018
|
1.00
|
Un-Cleco upper skins; begin debur
|
Details
|
  |
|
07-01-2018
|
2.10
|
Fold outer nose skin; prep for drilling spar; dril
|
Details
|
|
|
06-30-2018
|
1.30
|
Finish up pitot tube routing; folded and fastened
|
Details
|
|
|
06-29-2018
|
2.50
|
Flaperon Brackets & Pitot Tube routing
|
Details
|
|
|
06-28-2018
|
1.50
|
Bolt in strut fitting; check flaperon bracket dist
|
Details
|
  |
|
06-26-2018
|
2.60
|
Rivet Lower Skins - Left Wing
|
Details
|
|
|
06-25-2018
|
2.40
|
Continued wing prep
|
Details
|
|
|
06-22-2018
|
2.00
|
Spar Repair / Skin
|
Details
|
|
|
06-14-2018
|
2.70
|
Prep for riveting
|
Details
|
|
|
06-13-2018
|
3.40
|
Work left wing bottom skins
|
Details
|
|
|
06-11-2018
|
3.80
|
Work lower skin L-angles, mount tiedown ring, inst
|
Details
|
|
|
06-10-2018
|
3.30
|
Rear Spar Rivet; Skin Fit; Skin Angles
|
Details
|
|
|
06-08-2018
|
1.80
|
Wing Skeleton Assembly
|
Details
|
|
|
06-07-2018
|
1.80
|
Prep work for skeleton (left)
|
Details
|
|
|
06-06-2018
|
3.30
|
Parts prep, debur, mating, and inspection covers
|
Details
|
|
|
06-05-2018
|
1.00
|
Left Wing Started!
|
Details
|
 |
|
06-03-2018
|
0.00
|
Wing Rack
|
Details
|
|
|
05-30-2018
|
0.00
|
Text Continuation from other 5/30 post
|
Details
|
  |
|
05-30-2018
|
2.30
|
Misc: strut attach, crankshaft measurement, traili
|
Details
|
|
|
05-29-2018
|
0.50
|
Mic the journals
|
Details
|
  |
|
05-17-2018
|
1.30
|
Replace Root Nose Skin
|
Details
|
|
|
05-16-2018
|
1.30
|
Remove root nose skin
|
Details
|
|
|
05-15-2018
|
2.30
|
More Root Nose Skin work
|
Details
|
|
|
05-14-2018
|
2.00
|
Root Nose Skin
|
Details
|
|
|
05-11-2018
|
0.80
|
Rivet trailing edges & fuel tank top skin; prep ro
|
Details
|
|
|
05-08-2018
|
1.90
|
Finish tank install; wiring, plumbing
|
Details
|
|
|
05-07-2018
|
1.70
|
Tank cushioning / trial install / install rivets i
|
Details
|
|
|
05-06-2018
|
2.50
|
Leak test fuel tank, block extra port, rivet brace
|
Details
|
|
|
05-05-2018
|
2.00
|
Prep Right Wing Fuel Tank
|
Details
|
|
|
04-30-2018
|
0.80
|
Test Fit fuel tank; test fit trailing edges
|
Details
|
|
|
04-29-2018
|
2.40
|
Rivet Upper Skins
|
Details
|
 |
|
04-28-2018
|
2.80
|
More debur, flaperon brackets, reassemble
|
Details
|
|
|
04-27-2018
|
1.30
|
Debur Nose Rib Skin & Main Spar; initial fit flape
|
Details
|
|
|
04-25-2018
|
1.20
|
Finish Drilling Main Spar; begin debur
|
Details
|
 |
|
04-22-2018
|
1.00
|
Drill main spar
|
Details
|
 |
|
04-22-2018
|
1.10
|
Cleco nose rib skins in place for drilling main sp
|
Details
|
|
|
04-19-2018
|
0.70
|
Upper Skin Prep
|
Details
|
|
|
04-17-2018
|
3.40
|
Rivet Bottom Skins
|
Details
|
|
|
04-08-2018
|
1.50
|
Rivet Upper Skin L-angles
|
Details
|
  |
|
04-05-2018
|
2.40
|
Prep / Drill Upper Skin L-angles
|
Details
|
|
|
04-04-2018
|
2.30
|
Debur, more Debur, and still more debur
|
Details
|
  |
|
04-03-2018
|
1.30
|
Finish Strut Fitting / Cut L-angles
|
Details
|
|
|
03-29-2018
|
0.70
|
Finish up-drilling main spar; inital fit of strut
|
Details
|
 |
|
03-28-2018
|
0.80
|
More main spar drilling
|
Details
|
  |
|
03-27-2018
|
1.70
|
Up-drill nose ribs, install nose skins, and drill
|
Details
|
|
|
03-26-2018
|
3.40
|
Rivet L-Angles, updrill ribs, trial fit lower inbo
|
Details
|
|
|
03-24-2018
|
3.20
|
Begin wing skins
|
Details
|
|
|
03-21-2018
|
1.50
|
Almost finish rear spar
|
Details
|
|
|
03-19-2018
|
2.80
|
Skeleton Rivet / Spar Debur & Rivet
|
Details
|
|
|
03-18-2018
|
0.60
|
Started Riveting Ribs
|
Details
|
  |
|
03-17-2018
|
2.30
|
Add'l Skeleton Detail parts
|
Details
|
|
|
03-16-2018
|
2.30
|
Wing details
|
Details
|
|
|
03-15-2018
|
3.40
|
First wing work
|
Details
|
|
|
03-13-2018
|
0.00
|
Prep for wings
|
Details
|
  |
|
03-12-2018
|
3.00
|
Finish Left Inner Flaperon
|
Details
|
 |
|
03-07-2018
|
2.10
|
Build left inner flaperon skeleton
|
Details
|
|
|
03-06-2018
|
0.50
|
Install Left Outer Flaperon ABS tip
|
Details
|
  |
|
03-05-2018
|
1.20
|
Just about finish up Left Outer Flaperon
|
Details
|
 |
|
03-04-2018
|
1.20
|
Fab hinge attach brackets, debur skin
|
Details
|
 |
|
03-03-2018
|
1.70
|
Debur left outboard flaperon skeleton; rivet doubl
|
Details
|
|
|
03-02-2018
|
1.30
|
Finish Right Outer Flaperon
|
Details
|
|
|
03-01-2018
|
1.00
|
Debur / Rivet / Know when to call it quits
|
Details
|
|
|
02-26-2018
|
2.50
|
Prep / Debur / Rivet Right Outboard Flaperon Skele
|
Details
|
|
|
02-12-2018
|
1.50
|
Finish Right Inner Flaperon; Start Right Outter
|
Details
|
|
|
02-07-2018
|
1.70
|
Rivet inboard right side flaperon / trial fit skin
|
Details
|
|
|
02-07-2018
|
2.20
|
Finish Pass Inboard Flaperon - almost
|
Details
|
  |
|
02-04-2018
|
0.80
|
Debur / fab flaperon parts
|
Details
|
 |
|
02-03-2018
|
1.80
|
Check Alignment / Rivet Stab Hinge / Start Flapero
|
Details
|
|
|
02-01-2018
|
2.00
|
Rework Trim Tab Operation
|
Details
|
  |
|
01-31-2018
|
2.10
|
Rivet Elevator
|
Details
|
|
|
01-30-2018
|
3.10
|
Debur, Final Fit, Final Cleco, some Manual Rivetin
|
Details
|
|
|
01-29-2018
|
2.00
|
Finish Trial Fitment of Elevator
|
Details
|
|
|
01-27-2018
|
3.20
|
Elevator Control Arms / Bracing / Trim Tab
|
Details
|
|
|
01-27-2018
|
0.00
|
Continuation of Elevator population
|
Details
|
|
|
01-24-2018
|
1.80
|
Drill Elevator Hinge
|
Details
|
 |
|
01-23-2018
|
2.50
|
Parts Fitment on Elevator / Mate with Horizontal S
|
Details
|
|
|
01-21-2018
|
1.30
|
Finish Elevator Parts Prep / Cam Bevel Gear
|
Details
|
 |
|
01-20-2018
|
1.00
|
Debur / Sort / De-label elevator parts
|
Details
|
  |
|
01-19-2018
|
0.00
|
Vertical Fin Completed (second part)
|
Details
|
|
|
01-19-2018
|
2.30
|
Finish Vertical Fin
|
Details
|
|
|
01-17-2018
|
0.50
|
Debur spar; remove wrong rivet, test fit hinge to
|
Details
|
 |
|
01-15-2018
|
1.20
|
Cleanup / Debur / Label removal / Riveting
|
Details
|
|
|
01-13-2018
|
1.50
|
Prep Case for Shipment
|
Details
|
 |
|
01-13-2018
|
4.50
|
Finish Horizontal Stabilizer
|
Details
|
|
|
01-11-2018
|
2.30
|
Finish right tip; disassemble & debur
|
Details
|
  |
|
01-10-2018
|
0.00
|
Crankshaft checkout
|
Details
|
  |
|
01-09-2018
|
2.30
|
Finish drilling elevator hinge; mount tips
|
Details
|
|
|
01-09-2018
|
1.00
|
Crankshaft Dimension Checks
|
Details
|
  |
|
01-08-2018
|
0.80
|
Remove rods; test fit crank in case; bag lifters
|
Details
|
  |
|
01-08-2018
|
0.80
|
Drilled elevator hinge
|
Details
|
 |
|
01-06-2018
|
0.20
|
Separated case halves
|
Details
|
|
|
01-06-2018
|
0.40
|
Close top of Horiz Stab
|
Details
|
  |
|
01-04-2018
|
1.70
|
Replace 2 Rivets, install end ribs, fab L-angles
|
Details
|
|
|
01-03-2018
|
2.30
|
Skin Lower Side Horiz Stab
|
Details
|
|
|
01-01-2018
|
1.20
|
Add'l Riveting, Angle Trim, Skin Prep
|
Details
|
|
|
12-30-2017
|
1.30
|
Finished Preliminary Riveting Horiz Stab Skeleton
|
Details
|
 |
|
12-29-2017
|
2.70
|
Horiz Stab Skeleton
|
Details
|
|
|
12-24-2017
|
2.00
|
Removed Pistons, Valve Stuff, split case
|
Details
|
|
|
12-23-2017
|
2.50
|
Remove Cylinders & other misc parts
|
Details
|
|
|
12-20-2017
|
1.20
|
Debur Horizontal Tail Skeleton
|
Details
|
  |
|
12-20-2017
|
0.30
|
Cylinder removal progress
|
Details
|
  |
|
12-16-2017
|
3.00
|
Finish Table / Find Parts
|
Details
|
|
|
12-15-2017
|
4.00
|
Workbench Construction
|
Details
|
|
|
11-17-2017
|
7.00
|
Completed Rudder / Attended Workshop
|
Details
|
|
|
11-03-2017
|
2.00
|
Engine Choice Made! (and purchased!)
|
Details
|
|
|
10-02-2017
|
0.00
|
Ordered Kit
|
Details
|
  |
|
10-01-2017
|
0.00
|
Demo Flight
|
Details
|
  |
|
07-27-2017
|
0.00
|
Took the Plunge
|
Details
|
  |