KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
Work Logs Found: 54
Category Work Time: 107 Hours
 Date
Hours
Work Log Summary

Details

 05-04-2023
2.10
Set rudder deflection
Details
       

 05-03-2023
1.00
Struggle to adjust rudder swing
Details

 12-15-2022
2.40
Finish empennage
Details
       

 12-02-2022
2.00
Riveted vertical fin parts
Details
       

 11-29-2022
1.50
Finalizing Vertical stab installation
Details

 11-23-2022
1.70
Wing Rack / continue rudder cable outlets
Details
       

 11-11-2022
1.50
Install rudder, start rudder cable fairing install
Details
       

 10-25-2022
2.20
Misc Tail tasks
Details
       

 10-22-2022
3.30
Tail finish-up activities
Details
       

 10-20-2022
2.00
Up-drill / fit lower fin skin & vert stab lower ed
Details

 10-18-2022
2.50
finishing up (closer) to the lower vertical fin
Details
       

 10-14-2022
1.50
Fit lower vertical fin
Details
     

 10-13-2022
2.10
Add lower vertical fin brackets
Details
       

 10-11-2022
1.00
Vertical stab
Details

 09-29-2022
2.80
More tail work / misc
Details
       

 09-20-2022
2.30
More elevator finish tasks
Details
       

 09-17-2022
2.00
Work on elevator travel / attach counterweights /
Details
       

 09-15-2022
1.80
Prep elevator for cables / Start wing tip strobe m
Details
       

 09-13-2022
2.30
More elevator prep
Details
       

 09-10-2022
2.00
Worked on elevator cable pulleys.
Details
       

 09-08-2022
2.00
More work on horizontal
Details

 09-05-2022
2.00
Drill Horizontal Stab to Fuselage
Details
       

 12-17-2020
2.00
Prepping tail for closure
Details
     

 11-30-2020
0.50
"finessing" the elevator to horiz stab clearance
Details

 11-28-2020
1.30
Start rivet of horizontal stab tips to stabilizer
Details
     

 11-04-2020
2.80
Continuation of Horiz Stab Service Builletin
Details
       

 11-03-2020
3.60
Horiz Stab Service Bulletin
Details
       

 02-03-2018
1.80
Check Alignment / Rivet Stab Hinge / Start Flapero
Details
       

 02-01-2018
2.00
Rework Trim Tab Operation
Details

 01-31-2018
2.10
Rivet Elevator
Details
       

 01-30-2018
3.10
Debur, Final Fit, Final Cleco, some Manual Rivetin
Details
       

 01-29-2018
2.00
Finish Trial Fitment of Elevator
Details
       

 01-27-2018
3.20
Elevator Control Arms / Bracing / Trim Tab
Details
       

 01-27-2018
0.00
Continuation of Elevator population
Details
       

 01-24-2018
1.80
Drill Elevator Hinge
Details
     

 01-23-2018
2.50
Parts Fitment on Elevator / Mate with Horizontal S
Details
       

 01-21-2018
1.30
Finish Elevator Parts Prep / Cam Bevel Gear
Details
     

 01-20-2018
1.00
Debur / Sort / De-label elevator parts
Details

 01-19-2018
0.00
Vertical Fin Completed (second part)
Details
       

 01-19-2018
2.30
Finish Vertical Fin
Details
       

 01-17-2018
0.50
Debur spar; remove wrong rivet, test fit hinge to
Details
     

 01-15-2018
1.20
Cleanup / Debur / Label removal / Riveting
Details
       

 01-13-2018
4.50
Finish Horizontal Stabilizer
Details
       

 01-11-2018
2.30
Finish right tip; disassemble & debur
Details

 01-09-2018
2.30
Finish drilling elevator hinge; mount tips
Details
       

 01-08-2018
0.80
Drilled elevator hinge
Details
     

 01-06-2018
0.40
Close top of Horiz Stab
Details

 01-04-2018
1.70
Replace 2 Rivets, install end ribs, fab L-angles
Details
       

 01-03-2018
2.30
Skin Lower Side Horiz Stab
Details
       

 01-01-2018
1.20
Add'l Riveting, Angle Trim, Skin Prep
Details
       

 12-30-2017
1.30
Finished Preliminary Riveting Horiz Stab Skeleton
Details
     

 12-29-2017
2.70
Horiz Stab Skeleton
Details
       

 12-20-2017
1.20
Debur Horizontal Tail Skeleton
Details

 11-17-2017
7.00
Completed Rudder / Attended Workshop
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.