Zenith CruZer & Sonex Logs
Work Logs Found: 20
Category Work Time: 41 Hours
 Date
Hours
Work Log Summary

Details

 11-11-2021
1.00
Securing wires FWF
Details
     

 11-07-2021
2.80
Finished wiring (almosdt)
Details
       

 10-01-2020
1.60
Fuel Selector installation
Details
       

 07-06-2020
1.70
Finish fuselage wiring
Details
       

 06-17-2020
2.00
Cabin side heater details & crankcase breather
Details
       

 03-23-2020
1.80
More GRT digging
Details

 03-22-2020
2.00
Avionics Architecture Connections
Details

 03-15-2020
1.60
Fuel Line Manifold / upper door frame
Details
       

 03-14-2020
2.90
ELT Harness and Bracket
Details
       

 03-07-2020
1.80
Minor cleanup stuff
Details

 03-05-2020
2.40
Finish securing fuel / brake / pitot-static lines
Details
       

 03-02-2020
2.60
Work line placement in controls tunnel
Details
       

 03-01-2020
1.20
Brake lines / Pitot-static
Details
       

 02-28-2020
1.20
Gascolator installation
Details
       

 02-26-2020
2.60
fuel selector / adel clamps on lines / manifold
Details
       

 02-23-2020
3.80
Trying to figure out pump/gascolator locations
Details
     

 02-19-2020
2.80
Brainstorming fuel lines/fittings/etc
Details

 01-08-2020
1.10
Make up fuel lines
Details

 01-05-2020
1.30
Install Right Side Fuel & electric lines
Details
       

 12-29-2019
2.50
Install Left fuel line & pitot/static & wires
Details
       