KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
Work Logs Found: 188
Category Work Time: 336 Hours
 Date
Hours
Work Log Summary

Details

 06-08-2023
2.80
Prep for weight and balance
Details
       

 06-05-2023
2.90
Install seatbelts, final window rivet, baffle seal
Details
       

 06-03-2023
4.00
Rivet Baggage Compt / Rivet Rear Windows
Details
       

 05-31-2023
3.00
more close-out tasks
Details
       

 05-12-2023
3.60
punchlist items
Details
       

 10-08-2022
2.30
Attach Horizontal Stab / install door latches
Details

 08-27-2022
2.00
Door inge pins / route elevator cables / adjust ho
Details

 08-25-2022
1.70
Finish Cowl & Start Horiz Stab Install
Details
       

 08-23-2022
0.00
Part II of Finish Cowl
Details
       

 08-23-2022
5.00
Finish Cowl
Details
       

 08-20-2022
1.30
More cowl work
Details

 08-18-2022
2.30
Finish Cowl nutplates; start inspection door
Details
       

 08-16-2022
2.50
Nutplates for Cowl
Details
       

 08-13-2022
1.20
Install cowl with clecos
Details
       

 08-12-2022
2.00
More cowl fitting
Details

 08-06-2022
3.00
Still more cowl fit work
Details
       

 07-18-2022
2.30
More cowl fitment
Details
       

 07-16-2022
2.70
IInitial fitment lower cowl
Details
       

 07-13-2022
0.00
Trim upper cowl
Details
       

 07-13-2022
3.00
Trim Door fit and first trim of cowl
Details
       

 05-16-2022
1.50
Install windshield
Details
       

 05-13-2022
1.40
Rivet upper window sides / debur windshield
Details
     

 05-11-2022
1.90
Start final install of upper window
Details
     

 05-05-2022
2.60
Finish windshield and mapped-out upper window
Details
       

 05-04-2022
0.70
Drill WS acrylic for left side cabin frame
Details
     

 05-02-2022
2.40
Prep windshield for attachment
Details
       

 01-02-2021
1.60
More upper window fitting / bench cleanup
Details
     

 12-31-2020
1.60
Windshiled trim and upper window install
Details

 12-21-2020
1.60
Rivet upper window side pieces
Details

 12-20-2020
2.80
Upper fuse skin rivet / tail rivet / paint upper p
Details
       

 11-23-2020
0.80
Motor mount bolts / throttle cable
Details

 11-15-2020
2.00
More motor mount alignment & vinyl side trim
Details
     

 11-14-2020
1.50
Finalize (?) Motor Mount angle
Details
     

 11-13-2020
0.80
Trial install of motor mount
Details
     

 08-06-2020
0.60
Misc Riveting
Details

 07-18-2020
1.00
Work on torque tube assemblies & area
Details

 07-17-2020
2.70
Nutplates on torque tube tunnel top
Details
       

 07-13-2020
1.40
Install right side seat sliders / install grommets
Details
       

 07-11-2020
1.10
Seat adjuster install / misc other items
Details
       

 07-10-2020
3.40
Install seat bases
Details
       

 07-01-2020
1.10
Fab GPS antenna shelf / rivet seat back stops / fa
Details
       

 06-21-2020
1.60
Add cabin heat cable bracket / rivet vertical post
Details
       

 06-11-2020
0.50
Safety-wire lower bearing block for nose wheel
Details
       

 06-04-2020
0.70
Finalized gascolator
Details

 06-02-2020
2.00
Nutplates for right side of center console
Details

 05-30-2020
1.60
Install left angle for console side panel / clean
Details
       

 05-28-2020
2.10
Install remainder of left side nutplates
Details
       

 05-27-2020
0.80
Nutplates for console
Details

 05-25-2020
2.50
Wire routing change / Console L-angle install
Details
       

 05-10-2020
1.40
Upper Panel Skin finess
Details
     

 05-09-2020
1.00
Upper panel skin drill
Details
     

 05-07-2020
1.50
Add L angle stiffeners to underside of upper panel
Details
     

 05-06-2020
1.80
Finish right door / cut upper panel skin L angles
Details
       

 05-05-2020
1.60
Finish left door; work right door; drill firewall
Details
       

 05-04-2020
1.20
Door finesse work
Details

 05-01-2020
2.70
Completion tasks right door; final trim & fittings
Details
       

 04-30-2020
1.20
Fit left door plexiglass
Details
     

 04-29-2020
1.90
Finish reconstruction of right door
Details

 04-27-2020
1.80
Re-do right door glass
Details
     

 04-26-2020
2.40
Final pre-install fitting of windshield
Details

 04-24-2020
1.90
Windshield
Details
       

 04-20-2020
1.00
Drill thru upper panel skin
Details
     

 04-18-2020
0.80
Fit upper panel to foreward fuse sides
Details
     

 04-16-2020
2.20
Upper instrument panel cover install
Details
       

 04-15-2020
1.40
Completed right door glass trim & drilling
Details
       

 04-14-2020
1.40
Trim right side door plexiglass
Details
       

 04-12-2020
2.60
Drilled right door "glass", drilled for doorknob,
Details
       

 04-11-2020
1.00
Play with unibit and harness parts
Details

 04-10-2020
2.10
More paint, drilled rivet holes, cracked window
Details
     

 04-09-2020
1.00
More door prep
Details

 04-08-2020
1.50
Right door frame prep
Details

 04-07-2020
1.50
Adjust right door frame, a lot of painting
Details
       

 04-06-2020
3.30
Initial riveting right door frame
Details
     

 04-02-2020
1.60
Initial Drilling Right door gussets
Details
       

 03-31-2020
1.30
Finalize metal on left doorframe
Details
       

 03-29-2020
1.80
Rivet left door inner gussets, prep right door
Details
       

 03-28-2020
2.30
Left Door frame assembly
Details
       

 03-24-2020
2.80
Finalize GRT port assignments / create L door fram
Details
       

 03-21-2020
2.00
Attach hinge for right side door
Details

 03-20-2020
2.80
Install left door upper frame & prep right side hi
Details
       

 03-18-2020
1.10
Upper Door Frame fab
Details
       

 02-16-2020
2.40
Front seat support / panel redesign
Details
       

 12-22-2019
1.20
Working center armrest contents
Details
     

 12-17-2019
1.20
Create exit holes for brake lines
Details
     

 12-15-2019
1.80
Debur & Rivet door weatherstrip channel
Details
       

 12-13-2019
0.60
More line fit tests
Details
     

 12-11-2019
1.20
Trying to run fuel / pitot / lights wires & lines
Details
     

 12-10-2019
3.20
More doorframe work
Details
       

 11-25-2019
1.50
Right side lower door sill / doubler
Details
     

 11-23-2019
1.70
Left Door Sill / Weatherstrip channel
Details
       

 11-22-2019
2.00
Seat belt brackets / seat rails / parts prep
Details
       

 11-19-2019
1.00
Right side vertical fuel line
Details

 11-18-2019
2.40
Fuel line routing
Details
       

 11-17-2019
1.70
Drill holes for fuel lines to wings
Details

 11-12-2019
2.30
Install fairleads rear torque tube / install upper
Details
       

 11-08-2019
1.40
Misc Fuse / controls tasks
Details
       

 11-06-2019
1.60
Rivet front torque tube bearing assy / seat uprigh
Details
       

 10-17-2019
2.80
Paint Vertical Stab, Nose Strut base, & upper door
Details
       

 10-14-2019
0.80
Inner motor mounts
Details

 10-13-2019
1.70
Riveting / motor mount / parts prep
Details
       

 10-12-2019
1.20
Rivet Firewall / Fwd Fuse Sides / Cabin Frame
Details
       

 10-11-2019
1.20
Re-install firewall, fwd fuselage stiffeners
Details
       

 09-08-2019
1.90
Install left gear saddle weldment & rivet
Details
       

 09-06-2019
0.30
Finish bolting in right gear saddle
Details
     

 09-04-2019
1.90
Right side gear attach point bolts
Details
       

 08-13-2019
1.30
Riveting in gear channel
Details
       

 08-11-2019
1.40
Prep / Prime Motor Mount & Aliodine Upper Panel
Details
     

 08-08-2019
1.60
Motor Mount fitment
Details
       

 08-07-2019
1.90
Reinstall Cabin Frame / mate with motor mount
Details
       

 05-28-2019
0.80
Prep for new donut suspension
Details

 05-27-2019
1.80
Back to building
Details
       

 03-25-2019
1.50
Iniital fitment of brake pedals to rudder pedals
Details
     

 03-21-2019
1.00
Misc Fuselage tasks
Details
     

 03-18-2019
1.50
Rivet mated fuselage
Details
       

 03-15-2019
0.80
Mate fuselage
Details
     

 03-14-2019
3.20
Final riveting forward fuselage
Details
       

 03-12-2019
0.90
Final steps for rivet prep
Details
     

 03-10-2019
1.50
Updrill / rivet landing gear channel doublers
Details
     

 03-09-2019
1.00
Fwd Fuse Cleanup / rivet prep
Details

 03-07-2019
2.30
More debur, reassembly, some riveting
Details
       

 03-05-2019
1.70
Continued parts prep for assembly
Details
     

 03-02-2019
1.00
More fwd fuselge prep
Details
     

 02-28-2019
2.00
Finish rudder pedal fixtures / deburr / fwd side c
Details
       

 02-25-2019
2.20
Disassemble FWD fuse, start debur, lay-out rudder
Details
       

 02-24-2019
0.80
Up-drill foward side skins
Details
     

 02-22-2019
0.00
Install motor mounts
Details
       

 02-22-2019
3.40
Finish up initial trial fitments
Details
       

 02-18-2019
2.30
Cabin Frame to FW and Right Side Fwd Angles
Details
       

 02-15-2019
2.00
Fwd Fuselage L angles & forward angles
Details
     

 01-29-2019
1.40
Forward skin L angles, miscellany
Details
     

 01-28-2019
1.70
Drill-out foward skin; mount L skin, mount firewal
Details
       

 01-24-2019
2.30
Seat side rail fitment
Details
       

 01-23-2019
2.30
Install 4 gear channel doublers
Details
       

 01-22-2019
1.80
Left gear mount, left cabin frame reinforcement
Details
       

 01-19-2019
1.10
More fuselage prep work
Details
       

 01-18-2019
2.00
Misc forward fuselage fitment tasks
Details
     

 01-17-2019
1.10
Install right gear mount weldment
Details
       

 01-16-2019
1.00
Fuselage mate prep
Details

 01-15-2019
1.10
Up-drill cockpit frame
Details
       

 01-15-2019
1.10
Drill cabin frame
Details
       

 01-14-2019
1.40
Mate Fuselage
Details
       

 01-13-2019
2.10
Prep for fuselage mate
Details
       

 01-12-2019
1.70
Finish installing left seat base
Details
     

 01-10-2019
2.70
Add L-angles to supports & initial seat base insta
Details
       

 01-08-2019
1.00
Initial install Left fwd fuse side
Details
       

 01-07-2019
3.20
More pass side fwd fuselage work
Details
       

 01-06-2019
1.10
Remove powder coating - rudder pedals
Details

 01-05-2019
2.00
Finish L-angle reinforcements, drill seat base
Details
       

 01-04-2019
2.20
Fab L angles & Drill R fuse side
Details
       

 12-31-2018
1.00
Fwd Fuse Alignment
Details
       

 12-30-2018
0.50
Trial fit of Right Fwd Fuse Side Assy
Details
       

 12-29-2018
1.80
More Fwd Fuse initial install
Details
     

 12-23-2018
1.50
More prep for fwd fuselage
Details
       

 12-22-2018
0.80
Fwd Fuse Longerons
Details
       

 12-21-2018
1.00
Start of Forward Fuselage
Details
       

 12-19-2018
2.70
Finish Firewall
Details
       

 12-18-2018
1.70
Prep firewall for riveting
Details
     

 12-17-2018
3.50
Firewall Initial Construction
Details
       

 12-15-2018
1.10
Misc parts cleanup
Details

 12-13-2018
2.70
More aft fuselage finish-up work
Details
       

 12-12-2018
1.20
Baggage Compartment wrap-up for now
Details
       

 12-01-2018
1.50
Installing flaperon control tube
Details
       

 11-30-2018
2.00
Prep fitment of flaperon torque tube
Details
       

 11-27-2018
2.80
Cleanup, rivet upper skin, rivet baggage back, pre
Details
       

 11-26-2018
3.20
Upper fwd fuse riveting
Details
       

 11-25-2018
2.30
Flaperon control tube bracket and upper fwd fusela
Details

 11-24-2018
2.00
Flaperon Mixer Control & Brackets
Details
     

 11-22-2018
2.00
Rivet upper fuse longerons; install ELT antenna do
Details
       

 11-21-2018
1.70
Finish L-angles for baggage floor
Details

 11-19-2018
1.50
More baggage compartment
Details
       

 11-18-2018
1.30
Baggage area buildup
Details
       

 11-17-2018
3.10
Misc aft fuselage cleanup tasks
Details
       

 11-16-2018
2.50
Finish up baggage back, rivet front upper crossmem
Details
       

 11-15-2018
2.70
Baggage Compartment
Details
       

 11-10-2018
1.00
Join sides and bottom panels
Details
       

 11-09-2018
1.50
Finish top aft fuselage panel, prep bottom panel
Details
       

 11-08-2018
0.80
Top Fuse panel "finessing"
Details

 11-07-2018
2.70
Wrapped up right side, started top panel
Details
     

 11-02-2018
2.50
Start Right Aft Fuselage Panel
Details
     

 11-01-2018
2.70
Finish up left aft fuse side
Details
       

 10-30-2018
0.90
Parts prep
Details

 10-29-2018
2.40
Stiffeners & longeron for left fuse skin
Details
       

 10-28-2018
2.40
Wrap up bottom panel; start side 1
Details
     

 10-27-2018
2.20
Almost finished fuselage bottom
Details
       

 10-24-2018
1.50
Most riveting complete
Details
       

 10-23-2018
0.90
Initial riveting
Details

 10-20-2018
2.30
More parts cleanup; initial riveting: Bottom surfa
Details
       

 10-19-2018
2.90
Initial Aft Fuselage Prep Work
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.