KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
Work Logs Found: 32
Category Work Time: 63 Hours
 Date
Hours
Work Log Summary

Details

 12-17-2020
2.00
Prepping tail for closure
Details
     

 11-30-2020
0.50
"finessing" the elevator to horiz stab clearance
Details

 11-28-2020
1.30
Start rivet of horizontal stab tips to stabilizer
Details
     

 11-04-2020
2.80
Continuation of Horiz Stab Service Builletin
Details
       

 11-03-2020
3.60
Horiz Stab Service Bulletin
Details
       

 02-03-2018
1.80
Check Alignment / Rivet Stab Hinge / Start Flapero
Details
       

 02-01-2018
2.00
Rework Trim Tab Operation
Details

 01-31-2018
2.10
Rivet Elevator
Details
       

 01-30-2018
3.10
Debur, Final Fit, Final Cleco, some Manual Rivetin
Details
       

 01-29-2018
2.00
Finish Trial Fitment of Elevator
Details
       

 01-27-2018
3.20
Elevator Control Arms / Bracing / Trim Tab
Details
       

 01-27-2018
0.00
Continuation of Elevator population
Details
       

 01-24-2018
1.80
Drill Elevator Hinge
Details
     

 01-23-2018
2.50
Parts Fitment on Elevator / Mate with Horizontal S
Details
       

 01-21-2018
1.30
Finish Elevator Parts Prep / Cam Bevel Gear
Details
     

 01-20-2018
1.00
Debur / Sort / De-label elevator parts
Details

 01-19-2018
0.00
Vertical Fin Completed (second part)
Details
       

 01-19-2018
2.30
Finish Vertical Fin
Details
       

 01-17-2018
0.50
Debur spar; remove wrong rivet, test fit hinge to
Details
     

 01-15-2018
1.20
Cleanup / Debur / Label removal / Riveting
Details
       

 01-13-2018
4.50
Finish Horizontal Stabilizer
Details
       

 01-11-2018
2.30
Finish right tip; disassemble & debur
Details

 01-09-2018
2.30
Finish drilling elevator hinge; mount tips
Details
       

 01-08-2018
0.80
Drilled elevator hinge
Details
     

 01-06-2018
0.40
Close top of Horiz Stab
Details

 01-04-2018
1.70
Replace 2 Rivets, install end ribs, fab L-angles
Details
       

 01-03-2018
2.30
Skin Lower Side Horiz Stab
Details
       

 01-01-2018
1.20
Add'l Riveting, Angle Trim, Skin Prep
Details
       

 12-30-2017
1.30
Finished Preliminary Riveting Horiz Stab Skeleton
Details
     

 12-29-2017
2.70
Horiz Stab Skeleton
Details
       

 12-20-2017
1.20
Debur Horizontal Tail Skeleton
Details

 11-17-2017
7.00
Completed Rudder / Attended Workshop
Details
       










Copyright © 2001-2021 Matronics. All Rights Reserved.