KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs

Builder:
Carl Orton
Location:
DFW, TX -
Aircraft:
Zenith - 750 Cruzer
Manufacturer:   
http://www.zenithair.com/
Engine:
Probably O-200 -
Prop:
Undecided
Total Build Time:
738 Hours

Well, you can't keep a builder down for long! As some of you may know, I built and documented here a Sonex which I owned from 2008-2015. I guess I drove my wife nuts not having a project so she told me to build a new airplane!

Why a Zenith Cruzer? While the Sonex was fun, I really prefer a high-wing. The Cruzer also has a bit more room in the shoulders, especially with the bubble doors. It's amazing how the kit manufacturers have really matured their products over the past several years. Final-sized holes, CNC punched holes, match-hole drilled, etc. It's really more of an assembly than a fabrication.

Recent Activity
 Date Hours Work Log Summary Details
 10-20-2020
1.6
More Wiring Harness Finalization
Details
       

 10-18-2020
1.2
Add Connectors To Stick Grip Harness
Details
     

 10-17-2020
2.0
Still Wiring Cleanup
Details

 10-16-2020
4.8
Start Of Wiring Cleanup
Details
       

 10-14-2020
1.1
Wiring Mag Switch Harnesses
Details
       

 10-13-2020
1.0
3rd Redeisgn Of Stick Grip Wiring
Details
     

 10-12-2020
2.3
Wiring Close To The End
Details

 10-11-2020
2.2
More Wiring
Details

 10-07-2020
3.0
Various Panel Tasks
Details
       

 10-04-2020
2.0
Getting Close To Finishing The Wiring
Details










Copyright © 2001-2020 Matronics. All Rights Reserved.