KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
Work Logs Found: 109
Category Work Time: 215 Hours
 Date
Hours
Work Log Summary

Details

 05-01-2023
3.30
Rivet upper root inner skins & rig flaperons
Details
       

 04-29-2023
1.70
Flaperon rigging / misc other
Details
       

 04-27-2023
3.10
Rivet upper inner skin / adjust flaperons
Details
     

 04-24-2023
1.70
Check seat fit / start flaperon rig
Details

 04-20-2023
3.30
upper wing skins / flaperon pivot arc trimming / t
Details
       

 04-03-2023
3.00
Install wingtips
Details
       

 03-27-2023
3.50
More flaperon fitting / pitot tube / join flaperon
Details
       

 03-23-2023
2.20
Wing connections, flaperon adjustments
Details
       

 03-22-2023
2.30
More work finessing flaperons
Details
       

 03-18-2023
2.80
Continued work to balance flaperons
Details

 03-09-2023
1.20
More flaperon counterweight trim
Details

 03-07-2023
2.00
Work right side flaperons
Details

 02-28-2023
2.80
Finish left flaperons / start right flaperons
Details
       

 02-23-2023
1.80
Work left flaperons
Details
       

 02-21-2023
2.20
Finish right spar, start left flaperons
Details
       

 02-19-2023
2.30
More strut work
Details
       

 02-17-2023
1.50
Work left strut
Details

 02-15-2023
3.00
Cut struts to length
Details
       

 02-13-2023
3.00
Continued wing / strut stuff
Details
       

 02-09-2023
3.00
Drill / install rear wing spar bolt / start struts
Details
       

 02-07-2023
1.30
Set wing dihedral and wing sweep
Details

 02-03-2023
1.30
Cleanup wing-to-fuse junction
Details

 01-17-2023
2.50
Setting wing dihedral
Details

 01-13-2023
3.00
More wing prep
Details
       

 01-10-2023
2.50
Fuel Drain / Strut Fittings / Spar Adjust
Details
       

 01-07-2023
1.00
Initial Install of Wings
Details
       

 01-05-2023
1.80
misc prep for wing install
Details

 12-31-2022
1.80
Misc wing hang prep
Details
     

 11-28-2022
2.00
Build Wing stands for wing installation
Details
     

 10-29-2022
2.20
Install 3 flaperon counterweights
Details
     

 10-12-2022
1.50
Install Left Wingtip
Details
       

 09-23-2022
2.50
Install right wingtip
Details
     

 09-19-2022
2.00
Wiring for wingtip lights/strobes
Details

 04-03-2019
1.40
Add nutplates to wing inspection cover
Details
     

 10-18-2018
2.30
Leak test fuel tank, rivet top skin,
Details
       

 10-14-2018
1.60
Debur root skins, trial fit upper skin brace, add
Details
       

 10-11-2018
1.50
Left wing fwd root skin
Details
       

 09-06-2018
0.80
Begin fitment of Left Wing inner root skin
Details
     

 08-04-2018
1.50
Plumb tank, install upper root inner skin
Details
       

 08-01-2018
1.80
Finish Tank Install
Details
       

 07-20-2018
2.00
Left Gas tank prep
Details
       

 07-08-2018
1.00
Prep left wing fuel tank
Details

 07-06-2018
3.30
Rivet Upper Skins
Details
       

 07-04-2018
1.30
Finesse Pitot Tube / Clean FOD / clamp skins for r
Details
       

 07-03-2018
0.80
Prep for riveting
Details

 07-02-2018
1.00
Un-Cleco upper skins; begin debur
Details

 07-01-2018
2.10
Fold outer nose skin; prep for drilling spar; dril
Details
       

 06-30-2018
1.30
Finish up pitot tube routing; folded and fastened
Details
       

 06-29-2018
2.50
Flaperon Brackets & Pitot Tube routing
Details
       

 06-28-2018
1.50
Bolt in strut fitting; check flaperon bracket dist
Details

 06-26-2018
2.60
Rivet Lower Skins - Left Wing
Details
       

 06-25-2018
2.40
Continued wing prep
Details
       

 06-22-2018
2.00
Spar Repair / Skin
Details
       

 06-14-2018
2.70
Prep for riveting
Details
       

 06-13-2018
3.40
Work left wing bottom skins
Details
       

 06-11-2018
3.80
Work lower skin L-angles, mount tiedown ring, inst
Details
       

 06-10-2018
3.30
Rear Spar Rivet; Skin Fit; Skin Angles
Details
       

 06-08-2018
1.80
Wing Skeleton Assembly
Details
       

 06-07-2018
1.80
Prep work for skeleton (left)
Details
       

 06-06-2018
3.30
Parts prep, debur, mating, and inspection covers
Details
       

 06-05-2018
1.00
Left Wing Started!
Details
     

 05-30-2018
2.30
Misc: strut attach, crankshaft measurement, traili
Details
       

 05-17-2018
1.30
Replace Root Nose Skin
Details
       

 05-16-2018
1.30
Remove root nose skin
Details
       

 05-15-2018
2.30
More Root Nose Skin work
Details
       

 05-14-2018
2.00
Root Nose Skin
Details
       

 05-11-2018
0.80
Rivet trailing edges & fuel tank top skin; prep ro
Details
       

 05-08-2018
1.90
Finish tank install; wiring, plumbing
Details
       

 05-07-2018
1.70
Tank cushioning / trial install / install rivets i
Details
       

 05-06-2018
2.50
Leak test fuel tank, block extra port, rivet brace
Details
       

 05-05-2018
2.00
Prep Right Wing Fuel Tank
Details
       

 04-30-2018
0.80
Test Fit fuel tank; test fit trailing edges
Details
       

 04-29-2018
2.40
Rivet Upper Skins
Details
     

 04-28-2018
2.80
More debur, flaperon brackets, reassemble
Details
       

 04-27-2018
1.30
Debur Nose Rib Skin & Main Spar; initial fit flape
Details
       

 04-25-2018
1.20
Finish Drilling Main Spar; begin debur
Details
     

 04-22-2018
1.00
Drill main spar
Details
     

 04-22-2018
1.10
Cleco nose rib skins in place for drilling main sp
Details
       

 04-19-2018
0.70
Upper Skin Prep
Details
       

 04-17-2018
3.40
Rivet Bottom Skins
Details
       

 04-08-2018
1.50
Rivet Upper Skin L-angles
Details

 04-05-2018
2.40
Prep / Drill Upper Skin L-angles
Details
       

 04-04-2018
2.30
Debur, more Debur, and still more debur
Details

 04-03-2018
1.30
Finish Strut Fitting / Cut L-angles
Details
       

 03-29-2018
0.70
Finish up-drilling main spar; inital fit of strut
Details
     

 03-28-2018
0.80
More main spar drilling
Details

 03-27-2018
1.70
Up-drill nose ribs, install nose skins, and drill
Details
       

 03-26-2018
3.40
Rivet L-Angles, updrill ribs, trial fit lower inbo
Details
       

 03-24-2018
3.20
Begin wing skins
Details
       

 03-21-2018
1.50
Almost finish rear spar
Details
       

 03-19-2018
2.80
Skeleton Rivet / Spar Debur & Rivet
Details
       

 03-18-2018
0.60
Started Riveting Ribs
Details

 03-17-2018
2.30
Add'l Skeleton Detail parts
Details
       

 03-16-2018
2.30
Wing details
Details
       

 03-15-2018
3.40
First wing work
Details
       

 03-13-2018
0.00
Prep for wings
Details

 03-12-2018
3.00
Finish Left Inner Flaperon
Details
     

 03-07-2018
2.10
Build left inner flaperon skeleton
Details
       

 03-06-2018
0.50
Install Left Outer Flaperon ABS tip
Details

 03-05-2018
1.20
Just about finish up Left Outer Flaperon
Details
     

 03-04-2018
1.20
Fab hinge attach brackets, debur skin
Details
     

 03-03-2018
1.70
Debur left outboard flaperon skeleton; rivet doubl
Details
       

 03-02-2018
1.30
Finish Right Outer Flaperon
Details
       

 03-01-2018
1.00
Debur / Rivet / Know when to call it quits
Details
       

 02-26-2018
2.50
Prep / Debur / Rivet Right Outboard Flaperon Skele
Details
       

 02-12-2018
1.50
Finish Right Inner Flaperon; Start Right Outter
Details
       

 02-07-2018
1.70
Rivet inboard right side flaperon / trial fit skin
Details
       

 02-07-2018
2.20
Finish Pass Inboard Flaperon - almost
Details

 02-04-2018
0.80
Debur / fab flaperon parts
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.