Date
|
Hours
|
Work Log Summary

|
Details

|
04-03-2019
|
1.40
|
Add nutplates to wing inspection cover
|
Details
|
 |
|
10-18-2018
|
2.30
|
Leak test fuel tank, rivet top skin,
|
Details
|
|
|
10-14-2018
|
1.60
|
Debur root skins, trial fit upper skin brace, add
|
Details
|
|
|
10-11-2018
|
1.50
|
Left wing fwd root skin
|
Details
|
|
|
09-06-2018
|
0.80
|
Begin fitment of Left Wing inner root skin
|
Details
|
 |
|
08-04-2018
|
1.50
|
Plumb tank, install upper root inner skin
|
Details
|
|
|
08-01-2018
|
1.80
|
Finish Tank Install
|
Details
|
|
|
07-20-2018
|
2.00
|
Left Gas tank prep
|
Details
|
|
|
07-08-2018
|
1.00
|
Prep left wing fuel tank
|
Details
|
  |
|
07-06-2018
|
3.30
|
Rivet Upper Skins
|
Details
|
|
|
07-04-2018
|
1.30
|
Finesse Pitot Tube / Clean FOD / clamp skins for r
|
Details
|
|
|
07-03-2018
|
0.80
|
Prep for riveting
|
Details
|
  |
|
07-02-2018
|
1.00
|
Un-Cleco upper skins; begin debur
|
Details
|
  |
|
07-01-2018
|
2.10
|
Fold outer nose skin; prep for drilling spar; dril
|
Details
|
|
|
06-30-2018
|
1.30
|
Finish up pitot tube routing; folded and fastened
|
Details
|
|
|
06-29-2018
|
2.50
|
Flaperon Brackets & Pitot Tube routing
|
Details
|
|
|
06-28-2018
|
1.50
|
Bolt in strut fitting; check flaperon bracket dist
|
Details
|
  |
|
06-26-2018
|
2.60
|
Rivet Lower Skins - Left Wing
|
Details
|
|
|
06-25-2018
|
2.40
|
Continued wing prep
|
Details
|
|
|
06-22-2018
|
2.00
|
Spar Repair / Skin
|
Details
|
|
|
06-14-2018
|
2.70
|
Prep for riveting
|
Details
|
|
|
06-13-2018
|
3.40
|
Work left wing bottom skins
|
Details
|
|
|
06-11-2018
|
3.80
|
Work lower skin L-angles, mount tiedown ring, inst
|
Details
|
|
|
06-10-2018
|
3.30
|
Rear Spar Rivet; Skin Fit; Skin Angles
|
Details
|
|
|
06-08-2018
|
1.80
|
Wing Skeleton Assembly
|
Details
|
|
|
06-07-2018
|
1.80
|
Prep work for skeleton (left)
|
Details
|
|
|
06-06-2018
|
3.30
|
Parts prep, debur, mating, and inspection covers
|
Details
|
|
|
06-05-2018
|
1.00
|
Left Wing Started!
|
Details
|
 |
|
05-30-2018
|
2.30
|
Misc: strut attach, crankshaft measurement, traili
|
Details
|
|
|
05-17-2018
|
1.30
|
Replace Root Nose Skin
|
Details
|
|
|
05-16-2018
|
1.30
|
Remove root nose skin
|
Details
|
|
|
05-15-2018
|
2.30
|
More Root Nose Skin work
|
Details
|
|
|
05-14-2018
|
2.00
|
Root Nose Skin
|
Details
|
|
|
05-11-2018
|
0.80
|
Rivet trailing edges & fuel tank top skin; prep ro
|
Details
|
|
|
05-08-2018
|
1.90
|
Finish tank install; wiring, plumbing
|
Details
|
|
|
05-07-2018
|
1.70
|
Tank cushioning / trial install / install rivets i
|
Details
|
|
|
05-06-2018
|
2.50
|
Leak test fuel tank, block extra port, rivet brace
|
Details
|
|
|
05-05-2018
|
2.00
|
Prep Right Wing Fuel Tank
|
Details
|
|
|
04-30-2018
|
0.80
|
Test Fit fuel tank; test fit trailing edges
|
Details
|
|
|
04-29-2018
|
2.40
|
Rivet Upper Skins
|
Details
|
 |
|
04-28-2018
|
2.80
|
More debur, flaperon brackets, reassemble
|
Details
|
|
|
04-27-2018
|
1.30
|
Debur Nose Rib Skin & Main Spar; initial fit flape
|
Details
|
|
|
04-25-2018
|
1.20
|
Finish Drilling Main Spar; begin debur
|
Details
|
 |
|
04-22-2018
|
1.00
|
Drill main spar
|
Details
|
 |
|
04-22-2018
|
1.10
|
Cleco nose rib skins in place for drilling main sp
|
Details
|
|
|
04-19-2018
|
0.70
|
Upper Skin Prep
|
Details
|
|
|
04-17-2018
|
3.40
|
Rivet Bottom Skins
|
Details
|
|
|
04-08-2018
|
1.50
|
Rivet Upper Skin L-angles
|
Details
|
  |
|
04-05-2018
|
2.40
|
Prep / Drill Upper Skin L-angles
|
Details
|
|
|
04-04-2018
|
2.30
|
Debur, more Debur, and still more debur
|
Details
|
  |
|
04-03-2018
|
1.30
|
Finish Strut Fitting / Cut L-angles
|
Details
|
|
|
03-29-2018
|
0.70
|
Finish up-drilling main spar; inital fit of strut
|
Details
|
 |
|
03-28-2018
|
0.80
|
More main spar drilling
|
Details
|
  |
|
03-27-2018
|
1.70
|
Up-drill nose ribs, install nose skins, and drill
|
Details
|
|
|
03-26-2018
|
3.40
|
Rivet L-Angles, updrill ribs, trial fit lower inbo
|
Details
|
|
|
03-24-2018
|
3.20
|
Begin wing skins
|
Details
|
|
|
03-21-2018
|
1.50
|
Almost finish rear spar
|
Details
|
|
|
03-19-2018
|
2.80
|
Skeleton Rivet / Spar Debur & Rivet
|
Details
|
|
|
03-18-2018
|
0.60
|
Started Riveting Ribs
|
Details
|
  |
|
03-17-2018
|
2.30
|
Add'l Skeleton Detail parts
|
Details
|
|
|
03-16-2018
|
2.30
|
Wing details
|
Details
|
|
|
03-15-2018
|
3.40
|
First wing work
|
Details
|
|
|
03-13-2018
|
0.00
|
Prep for wings
|
Details
|
  |
|
03-12-2018
|
3.00
|
Finish Left Inner Flaperon
|
Details
|
 |
|
03-07-2018
|
2.10
|
Build left inner flaperon skeleton
|
Details
|
|
|
03-06-2018
|
0.50
|
Install Left Outer Flaperon ABS tip
|
Details
|
  |
|
03-05-2018
|
1.20
|
Just about finish up Left Outer Flaperon
|
Details
|
 |
|
03-04-2018
|
1.20
|
Fab hinge attach brackets, debur skin
|
Details
|
 |
|
03-03-2018
|
1.70
|
Debur left outboard flaperon skeleton; rivet doubl
|
Details
|
|
|
03-02-2018
|
1.30
|
Finish Right Outer Flaperon
|
Details
|
|
|
03-01-2018
|
1.00
|
Debur / Rivet / Know when to call it quits
|
Details
|
|
|
02-26-2018
|
2.50
|
Prep / Debur / Rivet Right Outboard Flaperon Skele
|
Details
|
|
|
02-12-2018
|
1.50
|
Finish Right Inner Flaperon; Start Right Outter
|
Details
|
|
|
02-07-2018
|
1.70
|
Rivet inboard right side flaperon / trial fit skin
|
Details
|
|
|
02-07-2018
|
2.20
|
Finish Pass Inboard Flaperon - almost
|
Details
|
  |
|
02-04-2018
|
0.80
|
Debur / fab flaperon parts
|
Details
|
 |