KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  8-18-2022
Number of Hours:  2.30
Manual Reference:  n/a
Brief Description:  Finish Cowl nutplates; start inspection door

2 days ago, I installed the cowl nutplates on the passenger side of the plane. Today I installed the pilot side nutplates. I still need to install nutplates along the seam between the upper and lower cowl halves.

I also started the installation of the oil/inspection door. I measured roughly the distance of the oil fill pipe from the firewall. I then used a 1" hole saw to drill a hole in that general location. I hit it right; I could see the oil filler pipe right under it. So I measured-out the full door dimensions, then made a second set of measurements just inside that to allow the door to sit on top of the cowl.

I cut open the "hatch" and then realized I didn't leave enough room for the Dzus fastener that keeps it shut. I also noted the hinge is a bit too long, so wantd to get home to review the builder's guide and figure out corrective action.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.