Powered By Kitlog Pro v2.0
Building Integrity
Long Ez
Nose and Nose gear
Work Logs Found:
111
Category Work Time:
236 Hours
Date
Hours
Work Log Summary
Details
06-11-2018
2.00
The all new nose gear install is complete
Details
06-09-2018
1.50
Upgrades require upgrades
Details
04-19-2018
1.50
The all new nose wheel fork has arrived
Details
03-28-2018
1.00
More Grease and less noise
Details
01-14-2018
0.50
Nose re-contour begins
Details
01-13-2018
1.00
Re-shaping the nose
Details
12-14-2017
1.00
The perfect time to tackle those little jobs
Details
12-10-2017
0.50
Big Changes coming
Details
10-17-2016
1.00
Clean up
Details
10-13-2016
1.00
Time for an inspection and cleanup
Details
04-29-2016
2.00
Nose wheel gets 100hr maintenance and a bit more
Details
11-05-2015
1.00
new Lens is good enough
Details
11-05-2015
1.00
landing light lens round 3
Details
10-30-2015
2.00
New landing light lense
Details
09-26-2015
1.50
2 Plies UNI inside
Details
09-25-2015
1.50
Nose Hatch Re-do
Details
04-18-2015
0.50
Nose wheel grease
Details
03-17-2015
2.00
Problem solved...I think
Details
11-21-2014
1.00
Pedal restraints
Details
09-13-2014
0.50
Static line relocation
Details
07-19-2014
2.00
Actuator cover and weather seal
Details
07-10-2014
1.50
Actuator cover glass and pedals grip tape
Details
07-09-2014
3.00
Annoying annoying.
Details
07-07-2014
1.00
Nose hatch finished and installed
Details
07-07-2014
4.00
Fine tuning the pedals and brakes
Details
07-06-2014
3.00
Brakes get fluid and pedals get paint.
Details
05-31-2014
4.00
New Lens and the lost is found!
Details
05-30-2014
3.00
Small doors and foggy windows
Details
05-28-2014
2.20
Nose gear strut door
Details
05-27-2014
0.00
Nose Gear update
Details
05-27-2014
0.00
Landing Light Lens 2
Details
05-27-2014
4.00
Landing Light Lens
Details
05-27-2014
2.00
Harness is alive and bearings are packed
Details
05-15-2014
1.00
hmmm...
Details
05-11-2014
0.50
Bad Swtich
Details
04-14-2014
1.00
Actuator cover trim and planning
Details
03-28-2014
0.00
Pitot tube backplate and landing light cover 2
Details
03-28-2014
8.00
Pitot tube backplate and landing light cover
Details
03-24-2014
3.00
Pedal Foot pads
Details
03-14-2014
3.00
Where's that noise coming from??
Details
02-24-2014
0.00
Pitot Tube install 2
Details
02-24-2014
3.00
Pitot Tube install
Details
06-21-2013
0.50
Gear Grease
Details
06-16-2013
0.00
Actuator cover and brake line routing 2
Details
06-16-2013
6.00
Actuator cover and brake line routing
Details
06-15-2013
0.50
Static line
Details
06-10-2013
0.00
Nose bumper "roller" 2
Details
06-10-2013
3.00
Nose bumper "roller"
Details
06-10-2013
1.00
Clear Coat
Details
06-08-2013
3.00
The nose gear is IN!
Details
06-08-2013
1.50
Painting the pedal rails
Details
05-31-2013
1.50
Chop it off
Details
05-29-2013
2.00
Stronger nose gear
Details
05-20-2013
0.50
New Paint
Details
04-13-2013
1.50
The final layup!
Details
04-09-2013
0.75
Trimming the glass
Details
04-08-2013
0.00
Underside Nose Glass 2
Details
04-08-2013
5.50
Underside Nose Glass
Details
03-11-2013
1.20
Knife trim and more BID tape
Details
03-10-2013
3.00
Interior Bid Tape
Details
03-09-2013
2.00
Re-Attaching the nose piece
Details
03-08-2013
0.00
Door finishing and anchor nuts 2
Details
03-08-2013
3.00
Door finishing and anchor nuts
Details
03-06-2013
1.00
More Filler
Details
03-05-2013
1.00
Hatch Door Install
Details
03-04-2013
2.50
Final prep and paint
Details
03-03-2013
1.00
Floxing the Hinge in place
Details
03-02-2013
1.75
Hatch door sand and prep for hinge
Details
03-02-2013
0.00
Glass, Flox, Filler and paint 2
Details
03-02-2013
2.00
Glass, Flox, Filler and paint
Details
03-01-2013
0.00
Hinge and Filler 2
Details
03-01-2013
3.50
Hinge and Filler
Details
02-26-2013
2.00
Hatch door headaches
Details
02-25-2013
0.75
Hatch Hinge
Details
02-24-2013
0.00
More Hatch and Pedal work 2
Details
02-24-2013
7.00
More Hatch and Pedal work
Details
02-23-2013
0.25
Hatch and Pedals 2
Details
02-23-2013
7.00
Hatch and Pedals
Details
02-22-2013
2.00
More Glass work
Details
02-20-2013
6.00
Rudder Pedals
Details
02-20-2013
3.00
Nose hatch prepped for glass
Details
02-19-2013
1.00
Trimmed up
Details
02-17-2013
10.50
Interior glass work
Details
02-16-2013
0.00
Nose Hatch Construction 2
Details
02-16-2013
7.00
Nose Hatch Construction
Details
02-15-2013
0.00
Back to the nose 2
Details
02-15-2013
3.50
Back to the nose
Details
01-28-2013
4.00
Glassing the Nose
Details
01-19-2013
1.00
Fickle
Details
01-05-2013
3.00
Final nose shaping
Details
01-03-2013
3.50
Shaping the nose
Details
01-02-2013
3.00
shaping the nose
Details
01-01-2013
3.50
X30 and carving the nose
Details
12-31-2012
2.00
Hologram f14
Details
12-30-2012
0.00
Building up the nose 3
Details
12-30-2012
0.00
Building up the nose 2
Details
12-30-2012
6.00
Building up the nose
Details
12-16-2012
1.00
NG3 Bolt through
Details
12-07-2012
0.00
FInal adjustments and install 2
Details
12-07-2012
4.50
FInal adjustments and install
Details
12-06-2012
0.00
Installing the strut and actuator 2
Details
12-06-2012
3.50
Installing the strut and actuator
Details
12-03-2012
3.00
Floxing the assembly
Details
12-02-2012
2.00
Paint
Details
11-08-2012
5.00
Wiring the Nose lift
Details
10-22-2012
1.00
Test fit and smile
Details
10-21-2012
6.00
Test fitting the actuator etc..
Details
10-20-2012
4.00
Ez Nose Lift
Details
10-14-2012
3.00
Out with the old, in with the new
Details
06-06-2012
2.00
Time for a Nose Job 2
Details
05-31-2012
2.50
Time for a Nose Job
Details
SITE NAVIGATION
Contact Builder
Long Ez Home
Category
# Logs
# Hours
All
2163
5429
Airframe Tweaking
4
6
Avionics
89
262
Canard
44
65
Canopy
94
226
Control System
95
279
Cowling
129
363
Electrical System
36
102
Elevators
5
15
Engine
421
934
Finishing
561
1584
Firewall
32
92
FLIGHT TESTING
41
58
Fuel system
24
48
Fuse Exterior
11
16
Fuselage
126
246
Instrument Panel
4
15
Landing Brake
14
21
Main Landing Gear
64
162
Miscellaneous
31
43
Nose and Nose gear
111
236
Plans
2
43
Prop
26
32
Scheduled Maintenanc
2
3
Seat Belts
2
3
Shop Supplies
18
57
Spar
19
41
Strakes
73
228
The Beginning
1
The Shop
18
57
Throttle
3
8
Weight and Balance
6
10
Winglets and Rudders
16
44
Wings
41
130
Copyright © 2001-2024 Matronics. All Rights Reserved.