The Inside got 1 ply of Bid Tape at every seam after thoroughly injecting Flox into all the gaps. The areas on top where the canard meets the nose got 2 plies BID tape. This took a bit longer due to the fact that last night as the top nose piece cured it shifted 2mm to the right. This meant I had to remove the nose again and reposition it. This time I used 5 minute epoxy so I KNOW it won't move again. :)