KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  3-2-2013
Number of Hours:  1.75
Manual Reference:  ch 13
Brief Description:  Hatch door sand and prep for hinge

I sanded down the second coat of Z-Grip and used my Fein Multimaster to cut a thin access hole for the hinge to be installed. Now I'm just waiting for the hinge paint and flox jobs to cure.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.