KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  4-13-2013
Number of Hours:  1.50
Manual Reference:  ch 13
Brief Description:  The final layup!

Today I layed up the final 1 ply of UNI over the top of the nose. The UNI was the last piece left on the role to it was kinked pretty bad which made it VERY stubborn to work with. Being that this is a "safety" measure layup, vs. required, I'm not going to stress a few air pockets here and there, but I'll be keeping an eye on it while it cures.
' style=

Sanded and ready for glass

Sanded and ready for glass

' style=

1 ply UNI with peel ply

1 ply UNI with peel ply

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.