KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  10-20-2012
Number of Hours:  4.00
Manual Reference:  ch 13
Brief Description:  Ez Nose Lift

Jack Wilhelmson's Nose lift system is pretty amazing. I spend time disassembling all the parts to clean and re-grease them. (Jack isn't as picky as me :) I then sanded down and cleaned up the Strut and prepared it for the new hardware. First on the list was NG15A. I ordered almost everything he makes and I'm Glad I did. Huge advances in hardware that will last a LOT longer. Clamped down and embedded in flox, the NG15A will cure over night. I will then ad the An bolts and tighten it up even further. The biggest surprise was trying to drill a measley 2 holes in the SS NG3 that he sent. Holy crap, I ruined 4 drill bits and it took me 2.5 hrs. Of course making sure it was dead on, was important and took time as well. I also drilled a new backplate for the NG6 which will seal off the nosegear much better. More on this later...
' style=

Jacks new hardware

Jacks new hardware

' style=

Pain is the @ss

Pain is the @ss

' style=

curing in a bed of flox

curing in a bed of flox

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.