KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
< Previous Log Entry          Next Log Entry >
' style=
Date:  5-31-2012
Number of Hours:  2.50
Manual Reference:  ch 13
Brief Description:  Time for a Nose Job

First and foremost, it is well known that the longer nose mod is better looking and much more practical. I'm going to be puting in the EzNose Lift system from http://www.eznoselift.com and front cylinder brake system from http://www.long-ez.com/. These 2 mods are a heck of a lot easier to put in with the nose removed and so before adding a longer nose, I'll be installing these parts. First step is to remove all the old hardware and I was glas to see it go!
' style=

Cutoff the majority of the original nose

Cutoff the majority of the original nose

' style=

removed the parts

removed the parts

' style=

cleaned up and ready for upgrades

cleaned up and ready for upgrades

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.