Date:  2-17-2013
Number of Hours:  10.50
Manual Reference:  ch 13
Brief Description:  Interior glass work

Tell ya what, 10 hour layups make me cross-eyed. I slurried every square inch of inside foam, sanded the glass to glass areas and laid up the interior glass per Eric Cobb's build log. I did 2 plies bid everywhere but added another 2 plies to the critical corners with 2.5" strips. Naturally these strips leave a pretty obvious edge so in the spirit of looking "pretty" I added peel ply to all the obvious transitions. I also took this time to add the required 1 ply strips to the outside edges of the forward turtle deck. I included a flox corner to the forward side per plans. The aft edge will be done when canopy work resumes.
' style=

slurried

slurried

' style=

layups in

layups in

' style=

peel ply and cure

peel ply and cure

' style=