Powered By Kitlog Pro v2.0
Building Integrity
Long Ez
Control System
Work Logs Found:
95
Category Work Time:
279 Hours
Date
Hours
Work Log Summary
Details
09-10-2019
3.00
Dangit Burt!
Details
09-09-2019
3.00
Ailerons and rudders are installed
Details
09-07-2019
3.00
Right wing hardware is in
Details
10-01-2018
1.00
Uh oh
Details
05-15-2018
4.00
New rudder cables finished and controls are in
Details
05-09-2018
1.00
All new Rudder cables
Details
03-06-2018
5.00
Topside finishing begins
Details
04-25-2017
0.50
Rudder cable adjustments
Details
02-29-2016
3.00
Bellcrank clearances
Details
02-01-2016
0.50
New Heim Bearings for the Elevator
Details
12-09-2015
6.00
Rockin and ROLLIN
Details
04-06-2015
2.00
Trim springs
Details
04-02-2015
4.00
Lets try again
Details
01-31-2015
2.00
Pitch trim springs
Details
01-29-2015
2.50
Rudder cables are done
Details
01-28-2015
2.00
Firewall pulleys and new cables
Details
01-14-2015
1.00
Cable pulleys are in!
Details
01-12-2015
5.00
Rudder cable pulley brackets
Details
01-11-2015
0.00
Something new
Details
12-21-2014
2.00
New bellcranks installed
Details
12-20-2014
1.00
The cozy girls are lost
Details
12-15-2014
2.00
Marco...POLO!
Details
11-03-2014
4.00
Making new Rudder cables
Details
09-23-2014
4.00
Rudder cable complete and AP Servo
Details
09-22-2014
8.00
Proper rigging and clearance issues
Details
09-22-2014
0.00
Proper rigging and clearance issues
Details
09-21-2014
3.00
Not a bad fix, and a needed good day
Details
09-20-2014
2.00
The previous Builder needs to be jailed
Details
09-18-2014
3.00
Left wing is ready
Details
09-17-2014
0.00
Left wing adjustments and prep for heat shield 2
Details
09-17-2014
8.00
Left wing adjustments and prep for heat shield
Details
09-16-2014
2.50
Right wing adjustments and left wing begins
Details
09-15-2014
0.00
Aileron torque tube, pushrods and teflon 2
Details
09-15-2014
8.00
Aileron torque tube, pushrods and teflon
Details
09-14-2014
4.50
Blessing and Curse
Details
09-13-2014
0.00
Pushrods and Canard install 2
Details
09-13-2014
8.00
Pushrods and Canard install
Details
09-12-2014
0.00
Prepping the parts and helping out a buddy 2
Details
09-12-2014
6.00
Prepping the parts and helping out a buddy
Details
09-05-2014
2.00
Rudder cable springs.
Details
09-03-2014
0.00
Rudder cable fabrication begins 2
Details
09-03-2014
6.00
Rudder cable fabrication begins
Details
08-29-2014
2.00
Stick grip and roll trim knob installed
Details
08-25-2014
2.00
Pilot Stick grip assembly
Details
06-07-2014
0.00
Throttle cable and console install 2
Details
06-07-2014
5.00
Throttle cable and console install
Details
05-25-2014
0.00
Stick Grips are done!!!!!
Details
04-15-2014
2.00
Aileron Torque tube installation
Details
04-12-2014
3.00
All grips accounted for
Details
01-06-2014
3.00
Stick grip sanding
Details
05-29-2013
0.50
Torque tube bearing install
Details
02-19-2013
1.00
Roll trim titanium is in
Details
02-15-2013
0.50
Better than expected!
Details
02-12-2013
0.00
Roll Trim rolls on 2
Details
02-12-2013
25.00
Roll Trim rolls on
Details
01-13-2013
2.00
Final Controls install
Details
12-16-2012
0.50
Rudder conduit glass reinforcements
Details
12-09-2012
3.00
Aileron torque tube routing
Details
12-08-2012
3.50
Rudder conduits
Details
11-07-2012
0.25
Final Trim wheel install. hooray!
Details
11-06-2012
5.50
Pitch trim wheel finishing
Details
11-04-2012
5.50
Pitch trim wheel installed
Details
11-03-2012
0.00
Pitch trim wheel construction 3
Details
11-03-2012
0.00
Pitch trim wheel construction 2
Details
11-03-2012
8.20
Pitch trim wheel construction 1
Details
11-01-2012
8.00
Pitch trim wheel
Details
10-28-2012
4.00
A new idea brewing
Details
10-17-2012
2.50
Roll Trim Success
Details
10-15-2012
4.00
Roll Trim woes
Details
10-07-2012
7.00
Roll Trim 95% complete
Details
10-04-2012
1.00
Roll Trim
Details
08-06-2012
1.50
Elevator pushrods
Details
08-02-2012
2.00
Fine tuning
Details
07-28-2012
1.00
Elevator connection
Details
07-25-2012
1.00
Glassing the brackets
Details
07-23-2012
1.00
Controls and consoles assembly
Details
07-22-2012
5.00
Floxing the brackets
Details
07-21-2012
5.50
Controls have arrived!
Details
06-23-2012
1.00
Stick grip lookin good
Details
06-15-2012
3.50
A new grip
Details
06-05-2012
2.00
Shaping the stick grip
Details
05-24-2012
2.00
Elevator Trim adjusted
Details
05-22-2012
1.00
Glassing the Throttle grip
Details
05-17-2012
6.00
An unsuccessful evening
Details
05-16-2012
8.50
Installing pitch trim system
Details
05-16-2012
1.50
Cutting out acces to pitch trim lever
Details
05-15-2012
1.50
Roll trim construction
Details
05-15-2012
3.50
Pitch trim glass and metal work
Details
05-15-2012
3.00
Making a custom throttle grip
Details
05-12-2012
1.00
Roll trim construction
Details
05-11-2012
1.00
Trial fit of trim system to fuselage
Details
05-10-2012
1.50
Trial assembly of elev. trim system
Details
05-10-2012
1.50
Polishing Trim lever
Details
05-10-2012
1.00
Control system brackets
Details
05-03-2012
1.00
Control system brackets
Details
SITE NAVIGATION
Contact Builder
Long Ez Home
Category
# Logs
# Hours
All
2163
5429
Airframe Tweaking
4
6
Avionics
89
262
Canard
44
65
Canopy
94
226
Control System
95
279
Cowling
129
363
Electrical System
36
102
Elevators
5
15
Engine
421
934
Finishing
561
1584
Firewall
32
92
FLIGHT TESTING
41
58
Fuel system
24
48
Fuse Exterior
11
16
Fuselage
126
246
Instrument Panel
4
15
Landing Brake
14
21
Main Landing Gear
64
162
Miscellaneous
31
43
Nose and Nose gear
111
236
Plans
2
43
Prop
26
32
Scheduled Maintenanc
2
3
Seat Belts
2
3
Shop Supplies
18
57
Spar
19
41
Strakes
73
228
The Beginning
1
The Shop
18
57
Throttle
3
8
Weight and Balance
6
10
Winglets and Rudders
16
44
Wings
41
130