KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  7-28-2012
Number of Hours:  1.00
Manual Reference:  ch 16
Brief Description:  Elevator connection

I spent a lot of time trying to decide exactly what position I want my hand to be in when the elevators are neutral however I've concluded that until my seats arrive I really can't know for sure. I also too time to meaure the canard sweep and was glad to see that without any shims it's only 1/4" off which is MUCH less than the 3" the plans allows so instead of adding washers, I'll stick with the 1/4". Much more adjusting coming soon...
' style=

Connected

Connected

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.