KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  1-13-2013
Number of Hours:  2.00
Manual Reference:  ch 16
Brief Description:  Final Controls install

I opted to install the control system permanently at this stage in the build due to the firewall about to be floxed in place. The control system was removed, greased, bolts torqued to spec, cotter pins installed, and torque tubes drilled and bolted. :) Again, time flies when you're building something that flies. :)
' style=





' style=




' style=

Notice the rudder cable conduit and firewall bearing.

Notice the rudder cable conduit and firewall bearing.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.