KitLog pro

Powered By Kitlog Pro v2.0

Bob Leffler's RV-10
Work Logs Found: 118
Category Work Time: 375 Hours
 Date
Hours
Work Log Summary

Details

 07-12-2013
2.00
Finished Stick Grip Wiring
Details
       

 05-03-2013
0.00
AFS 4500
Details

 04-28-2013
3.00
Heat Shields and Heater Cable Adel Clamps
Details
       

 04-25-2013
0.50
GTN650
Details

 04-21-2013
8.00
Lower Console, Engine Mount, & Purge Valve
Details
       

 04-20-2013
7.00
Lower Console
Details
       

 04-17-2013
2.00
AFS EFIS and GTN650
Details
     

 04-16-2013
2.00
GPS Troubleshooting
Details
       

 04-15-2013
3.00
GTN650 Configuration
Details
       

 04-14-2013
8.00
Panel, Heat, Nav, and Magnetos
Details
       

 04-13-2013
8.00
Panel, GPS Antenna, and Magneto Timing
Details
       

 04-12-2013
1.00
Upgrade AFS 3400
Details
     

 04-07-2013
8.00
Mags, Throttle Quadrant, Glareshield, Heater Contr
Details
       

 04-06-2013
8.00
Panel Wiring
Details
       

 04-05-2013
3.00
Panel Wiring
Details

 04-03-2013
3.00
Left Panel Insert and Throttle Quadrant
Details
       

 04-02-2013
3.00
GTN650 Fan and Final Panel Wiring
Details
       

 04-01-2013
2.50
Center Panel
Details
     

 03-31-2013
8.00
Central Panel / Radio Stack
Details
       

 03-30-2013
6.00
Rudder Trim and Panel Switches
Details
       

 03-29-2013
5.00
Panel Wiring
Details

 03-24-2013
4.00
Throttle Quadrant
Details
       

 03-24-2013
1.00
Rudder Trim and Alternate Static Air Switch
Details
       

 02-21-2013
1.00
Labeled Inserts and Clear Coat
Details
     

 02-20-2013
1.00
Paint Panel Inserts
Details
     

 01-23-2013
2.00
Passenger Headset Jacks
Details
     

 01-20-2013
6.00
Wing Root Connectors & Audio Panel Connector
Details
       

 01-13-2013
2.00
Panel Inserts
Details
       

 01-12-2013
2.00
Tape Gray Line on Wheel Pants
Details
       

 12-09-2012
1.00
Started to install panel components
Details
       

 12-08-2012
6.00
Left Wing Connector
Details
       

 11-26-2012
1.50
Left Wing Root Connector
Details
       

 11-24-2012
0.00
Moved Fuselage back to the hangar #2
Details
       

 11-18-2012
2.00
Clear Coat Panel Inserts and Clean Hangar
Details
       

 10-01-2012
1.00
Stick & Nose Wheel
Details
       

 09-30-2012
5.00
Sticks and Cabin Cover Door Frame
Details
       

 09-27-2012
2.60
Stick Wiring & Cleaning Tail Feathers
Details
       

 06-17-2012
1.00
Glareshield Template
Details
     

 04-09-2012
3.00
Autopilot Wiring
Details
       

 04-08-2012
5.00
Fairings, ADSB, ADSB Antenna
Details
       

 03-09-2012
1.00
ADSB DB-37
Details
     

 02-28-2012
2.00
Crossbow Magnetometers wired
Details
       

 02-27-2012
1.50
Install Magentometers
Details
     

 02-26-2012
4.00
Magnetomer Tray
Details
       

 02-25-2012
6.00
Misc Panel
Details
       

 02-23-2012
1.00
Magnetometers
Details
     

 02-22-2012
1.50
Annuciator Wiring Change
Details
     

 02-21-2012
1.50
Auto Pilot Switch
Details
       

 02-19-2012
4.00
More Panel Wiring
Details
     

 02-18-2012
5.00
CO & CLA Wiring, Upgrading Adel Clamps
Details
       

 02-16-2012
2.00
CO Wiring
Details
     

 02-12-2012
4.00
Ignition Switch Wiring, Magnetometer Mount, & Door
Details
       

 02-05-2012
5.00
Panel Switch Wiring and Door Remount
Details
       

 02-04-2012
5.00
Panel Switch Wiring and Compressor Repair
Details
     

 02-02-2012
3.00
Switch Wiring
Details
     

 01-29-2012
4.00
Switch & LED wiring
Details
       

 01-28-2012
6.00
Switch & LED Wiring
Details
       

 01-24-2012
1.50
Panel switch assembly
Details
     

 01-22-2012
4.00
Panel Supports
Details
       

 01-21-2012
4.00
Radio Stack Support
Details
       

 01-17-2012
2.00
More nutplates on the panel
Details
       

 01-15-2012
4.00
Misc Panel Tasks
Details
       

 01-10-2012
2.00
Panel Wiring
Details
     

 01-09-2012
1.50
Right Side Panel Wiring
Details
     

 01-08-2012
5.00
Panel & Wiring
Details
       

 01-07-2012
6.00
Panel Inserts & Misc
Details
       

 01-04-2012
0.00
Center Panel Insert
Details
     

 12-31-2011
4.00
More Panel #2 and Riveting
Details
       

 12-28-2011
2.00
Cutting holes in the carbon fiber panel
Details
       

 12-26-2011
4.00
More wiring and some riveting
Details
       

 12-25-2011
0.00
Panel Layout
Details
     

 12-24-2011
4.00
Pulling wire
Details
       

 12-24-2011
2.00
Panel Inserts and Firewall Passthrough
Details
     

 12-23-2011
0.00
Picked up panel inserts from Aerosport Products
Details
     

 12-19-2011
4.00
Started to install upper fuselage assembly
Details
       

 12-18-2011
6.00
More Panel Wiring
Details
       

 12-17-2011
2.00
More wiring support
Details
       

 12-14-2011
2.00
Cleaning up the wiring
Details
       

 12-13-2011
2.00
Wired Strobes Circuit & AFS EFIS
Details
     

 12-04-2011
4.00
Fans and Door Relays
Details
       

 12-03-2011
1.00
Install defroster fans
Details
       

 11-30-2011
2.00
Wire Mgmt and Fuel Lines
Details
       

 11-29-2011
2.00
Finish radio stack mount
Details
       

 11-28-2011
2.50
Radio Stack Mount
Details
       

 11-25-2011
4.00
Moved Upper Fueselage Assembly back to the hangar
Details
       

 11-24-2011
6.00
More panel work
Details
       

 11-06-2011
10.00
Working on the harness
Details
       

 10-29-2011
6.00
GTN 650, PSE 8000B, and GTX 327 wiring
Details
       

 10-27-2011
0.00
AFS AP arrives
Details

 10-02-2011
4.00
AFS Main EFIS Connectors Completed
Details
       

 09-17-2011
2.00
VP-X J-2 Connector
Details
       

 09-14-2011
4.00
VP-X J1 Connector Completed
Details
       

 09-11-2011
10.00
Panel Wiring #2
Details
       

 09-05-2011
20.00
Wiring of VP-X power connectors
Details
     

 08-29-2011
1.50
Mounting panel devices #2
Details
       

 08-28-2011
4.00
Mounting more devices
Details
       

 08-27-2011
6.00
VP-X, Electronic Ignition, Wire Pass Throughs
Details
       

 08-26-2011
2.00
VP-X Pro installation
Details
       

 08-19-2011
2.00
Installing the VP-X Pro
Details
       

 08-15-2011
2.00
Misc Panel Tasks
Details
       

 10-30-2010
3.00
Sub Panel Access Hole and VP-200 CU
Details
       

 10-25-2010
1.50
Misc Sub Panel Supports
Details
       

 07-10-2010
2.00
Sub Panel Access Hole
Details
       

 07-08-2010
0.50
Sub Panel Access Hole for Radio Stack
Details
     

 05-25-2010
1.00
Panel design
Details
     

 01-25-2010
1.00
Panel Planning
Details
     

 01-12-2010
2.00
Mounting Andair Fuel Valve in Center Arm Rest
Details
       

 01-11-2010
1.00
Lower console side panel and Andair installation
Details
       

 01-10-2010
1.00
Attach throttle quadrant
Details
       

 12-25-2009
1.00
Throttle quadrant #2
Details
       

 12-19-2009
1.00
Throttle Quadrant
Details
       

 12-17-2009
1.00
Throttle quandrant insert
Details
       

 12-10-2009
1.00
Nutplates on lower console
Details
       

 12-06-2009
1.00
Rivet nutplates on panel
Details
     

 12-05-2009
1.00
Working on panel mounts
Details
       

 12-02-2009
1.00
Instrument Panel Insert
Details
       

 11-06-2009
3.00
Instrument Panel
Details
       

 12-28-2008
0.00
Started panel planning
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.