KitLog pro

Powered By Kitlog Pro v2.0

Bob Leffler's RV-10
' style=
Date:  12-9-2012
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Started to install panel components

Installed the AFS EFIST, CO detector, and the ELT remote in the right panel insert.

Installed the Gemini EFIS, the AFS Pilot autopilot, switches, and the LED annuciator lights in the left panel insert.

Installed a bank of switches in the center panel insert.

The other components will wait until the inserts are installed in the panel.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.