KitLog pro

Powered By Kitlog Pro v2.0

Bob Leffler's RV-10
' style=
Date:  4-8-2012
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Fairings, ADSB, ADSB Antenna

Janice sanded the vertical stabilizer and rudder.

I finished wiring the ADSB connector and the ADSB antenna connector.

I also fabricate the doubler for the ADSB antenna doubler and then I primed it.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.