Date
|
Hours
|
Work Log Summary
|
Details
|
05-03-2015
|
1.00
|
First flight!
|
Details
|
|
|
04-30-2015
|
1.00
|
Airworthiness Certificate!
|
Details
|
|
|
03-15-2015
|
1.00
|
First Engine Start!
|
Details
|
|
|
03-07-2015
|
1.00
|
Pre-Certification Condition Inspection
|
Details
|
|
|
12-09-2014
|
1.00
|
N-numbers and data plate
|
Details
|
|
|
12-08-2014
|
1.00
|
Pitot-static and transponder inspections
|
Details
|
|
|
12-06-2014
|
1.00
|
Panel Fired up
|
Details
|
|
|
12-03-2014
|
1.00
|
Finishing panel wiring
|
Details
|
|
|
12-02-2014
|
1.00
|
Exhaust
|
Details
|
|
|
12-01-2014
|
1.00
|
FWF wrap-up
|
Details
|
|
|
11-29-2014
|
1.00
|
Brake bleeding
|
Details
|
|
|
10-04-2014
|
1.00
|
Door install
|
Details
|
|
|
09-02-2013
|
1.00
|
Exhaust headers
|
Details
|
|
|
09-02-2013
|
1.00
|
Completed oil acess door
|
Details
|
|
|
08-02-2013
|
1.00
|
Completing the air scoop
|
Details
|
|
|
07-29-2013
|
1.00
|
Baffe seal templates and install
|
Details
|
|
|
07-14-2013
|
1.00
|
Baffles, cont.
|
Details
|
|
|
07-10-2013
|
1.00
|
Air Scoop extension
|
Details
|
|
|
07-08-2013
|
1.00
|
Red Cube fuel flow transducer
|
Details
|
|
|
07-07-2013
|
1.00
|
Match drilled the emp fairing
|
Details
|
|
|
07-03-2013
|
1.00
|
Mounting filter tabs to FAB top
|
Details
|
|
|
07-01-2013
|
1.00
|
Initial oil access door fitting
|
Details
|
|
|
06-30-2013
|
1.00
|
Establishing FAB alignment
|
Details
|
|
|
06-27-2013
|
1.00
|
Fitting the baffles
|
Details
|
|
|
06-26-2013
|
1.00
|
Cutting out the hole for the oil filler door
|
Details
|
|
|
06-15-2013
|
1.00
|
Connecting throttle & mixture cables
|
Details
|
|
|
06-07-2013
|
1.00
|
Fabricating a new baffle bracket
|
Details
|
|
|
06-04-2013
|
1.00
|
Installing the camloc support strips
|
Details
|
|
|
06-03-2013
|
1.00
|
Matching camloc support strips
|
Details
|
|
|
06-03-2013
|
1.00
|
Baffle assembly
|
Details
|
|
|
06-02-2013
|
1.00
|
Lower Cowl Vent Slots
|
Details
|
|
|
05-25-2013
|
1.00
|
Drilling/riveting the horizontal support strips
|
Details
|
|
|
05-18-2013
|
1.00
|
Trimming inlets
|
Details
|
|
|
05-18-2013
|
1.00
|
Lower Cowl
|
Details
|
|
|
05-11-2013
|
1.00
|
Top cowl inlet ramps
|
Details
|
|
|
05-10-2013
|
1.00
|
Cutting the slot in the lower cowl
|
Details
|
|
|
05-06-2013
|
1.00
|
Fitting the top cowl, continued
|
Details
|
|
|
05-05-2013
|
1.00
|
Fitting the top cowl
|
Details
|
|
|
05-04-2013
|
1.00
|
Cowl inlet trimming
|
Details
|
|
|
04-27-2013
|
1.00
|
Prop hanging, continued
|
Details
|
|
|
04-26-2013
|
1.00
|
Prop hanging
|
Details
|
|
|
04-16-2013
|
1.00
|
Spinner cutouts
|
Details
|
|
|
04-15-2013
|
1.00
|
Spinner backplate
|
Details
|
|
|
03-16-2013
|
1.00
|
Pitch trim servo
|
Details
|
|
|
03-10-2013
|
1.00
|
Starter install
|
Details
|
|
|
02-13-2013
|
1.00
|
Final wing install
|
Details
|
|
|
02-12-2013
|
1.00
|
Initial wing install
|
Details
|
|
|
02-11-2013
|
1.00
|
Prop governor
|
Details
|
|
|
02-09-2013
|
1.00
|
Primary Alternator install
|
Details
|
|
|
01-25-2013
|
1.00
|
VOR/LOC Antenna
|
Details
|
|
|
12-15-2012
|
1.00
|
Standby alternator install
|
Details
|
|
|
11-17-2012
|
1.00
|
Moving to the Airport, cont.
|
Details
|
|
|
11-17-2012
|
1.00
|
Moving to the airport
|
Details
|
|
|
11-13-2012
|
1.00
|
Windscreen install
|
Details
|
|
|
11-12-2012
|
1.00
|
Rear window install
|
Details
|
|
|
11-11-2012
|
1.00
|
Door window install
|
Details
|
|
|
10-21-2012
|
1.00
|
Hanging the engine, cont.
|
Details
|
|
|
10-21-2012
|
1.00
|
Hanging the engine
|
Details
|
|
|
10-17-2012
|
1.00
|
Finishing the latch mechanism
|
Details
|
|
|
10-16-2012
|
1.00
|
Installing center latch
|
Details
|
|
|
10-15-2012
|
1.00
|
Center latch, cont.
|
Details
|
|
|
10-14-2012
|
1.00
|
Center latch
|
Details
|
|
|
10-13-2012
|
1.00
|
Door pin guides. cont.
|
Details
|
|
|
10-12-2012
|
1.00
|
Door pin guides
|
Details
|
|
|
10-11-2012
|
1.00
|
Latch pocket and pointers
|
Details
|
|
|
10-10-2012
|
1.00
|
Door racks and rods
|
Details
|
|
|
10-09-2012
|
1.00
|
Fitting the doors, cont.
|
Details
|
|
|
10-08-2012
|
1.00
|
Fitting the doors to the fuse
|
Details
|
|
|
10-01-2012
|
1.00
|
My prop arrives
|
Details
|
|
|
09-22-2012
|
1.00
|
Door trimming
|
Details
|
|
|
09-21-2012
|
1.00
|
Glueing the doors together
|
Details
|
|
|
09-20-2012
|
1.00
|
Drilling door halves to each other
|
Details
|
|
|
09-19-2012
|
1.00
|
Rough trimming door & window cutouts
|
Details
|
|
|
09-08-2012
|
1.00
|
Nosegear install
|
Details
|
|
|
09-04-2012
|
1.00
|
Canopy install
|
Details
|
|
|
09-02-2012
|
1.00
|
ELT and aft fuse block
|
Details
|
|
|
08-29-2012
|
1.00
|
Battery, GPP, and contactor install
|
Details
|
|
|
08-28-2012
|
1.00
|
Installing copper tape groundplane
|
Details
|
|
|
08-25-2012
|
1.00
|
Installing the canopy headliner
|
Details
|
|
|
08-22-2012
|
1.00
|
Painting the OHC
|
Details
|
|
|
08-14-2012
|
1.00
|
Fitting the windscreen
|
Details
|
|
|
08-13-2012
|
1.00
|
Creating eyeball vent mount brackets
|
Details
|
|
|
08-12-2012
|
1.00
|
Drilling the canopy brace
|
Details
|
|
|
08-11-2012
|
1.00
|
Drilling the canopy to the fuse
|
Details
|
|
|
08-05-2012
|
1.00
|
GPS antenna mounts
|
Details
|
|
|
07-08-2012
|
1.00
|
More OHC fairing, filling, & sanding
|
Details
|
|
|
07-03-2012
|
1.00
|
Avionics test fit
|
Details
|
|
|
07-02-2012
|
1.00
|
Riveting radio stack supports
|
Details
|
|
|
07-01-2012
|
1.00
|
Drilling panel radio stack supports
|
Details
|
|
|
06-30-2012
|
1.00
|
Fairing in the OHC to the canopy
|
Details
|
|
|
06-09-2012
|
1.00
|
OHC Install
|
Details
|
|
|
06-08-2012
|
1.00
|
OHC wiring
|
Details
|
|
|
06-06-2012
|
1.00
|
Brake caliper install
|
Details
|
|
|
05-23-2012
|
1.00
|
Making the air manifold
|
Details
|
|
|
05-21-2012
|
1.00
|
Air manifold, cont.
|
Details
|
|
|
05-20-2012
|
1.00
|
OHC coat hanger rod install
|
Details
|
|
|
05-20-2012
|
1.00
|
OHC Air duct manifold
|
Details
|
|
|
05-20-2012
|
1.00
|
More work on the OHC
|
Details
|
|
|
05-19-2012
|
1.00
|
OHC Eyeball vent, reading light & switch holes
|
Details
|
|
|
05-16-2012
|
1.00
|
OHC air ducting
|
Details
|
|
|
05-12-2012
|
1.00
|
Transponder antenna
|
Details
|
|
|
05-11-2012
|
1.00
|
More tailcone items
|
Details
|
|
|
05-06-2012
|
1.00
|
Ground Power Point
|
Details
|
|
|
05-05-2012
|
1.00
|
Cabin Top
|
Details
|
|
|
04-26-2012
|
1.00
|
Cabin Doors
|
Details
|
|
|
04-24-2012
|
1.00
|
Instrument Panel #2
|
Details
|
|
|
04-21-2012
|
1.00
|
NACA vents
|
Details
|
|
|
04-14-2012
|
1.00
|
Instrument Panel #1
|
Details
|
|
|
03-24-2012
|
1.00
|
Floors and cover panels
|
Details
|
|
|
03-23-2012
|
1.00
|
Engine mount and landing gear
|
Details
|
|
|
01-22-2012
|
1.00
|
Rear Seat backs
|
Details
|
|
|
01-19-2012
|
1.00
|
Upper Forward fuse install
|
Details
|
|
|
01-09-2012
|
1.00
|
Flap system
|
Details
|
|
|
01-07-2012
|
1.00
|
Control System
|
Details
|
|
|
01-02-2012
|
1.00
|
Brake lines
|
Details
|
|
|
12-31-2011
|
1.00
|
Brakes
|
Details
|
|
|
11-19-2011
|
1.00
|
Fuel Lines
|
Details
|
|
|
10-30-2011
|
1.00
|
Baggage door
|
Details
|
|
|
10-23-2011
|
1.00
|
Baggage Area
|
Details
|
|
|
10-02-2011
|
1.00
|
Upper Forward Fuse
|
Details
|
|
|
09-25-2011
|
1.00
|
Mating the tailcone to the fuse
|
Details
|
|
|
09-10-2011
|
1.00
|
Step Install
|
Details
|
|
|
08-04-2011
|
1.00
|
Began riveting the right side mid skin
|
|
|
|
08-03-2011
|
1.00
|
Riveting baggage floor support angles
|
|
|
|
08-03-2011
|
1.00
|
Clecoed fuse side skins in-place
|
|
|
|
08-01-2011
|
1.00
|
Riveting upper and lower fuse channels
|
Details
|
|
|
07-23-2011
|
1.00
|
Primed side skins, longerons, and channels
|
Details
|
|
|
07-21-2011
|
1.00
|
Cutting out the baqgage door
|
Details
|
|
|
06-30-2011
|
1.00
|
Fwd side skins removed
|
Details
|
|
|
06-29-2011
|
1.00
|
Drilling the fuse forward side skins
|
Details
|
|
|
06-28-2011
|
1.00
|
Drilling fuse mid side skins, cont.
|
Details
|
|
|
06-27-2011
|
1.00
|
Drilling fuse mid side skins
|
Details
|
|
|
06-24-2011
|
1.00
|
Install of comm antenna doublers
|
Details
|
|
|
06-23-2011
|
1.00
|
Fab comm antenna doublers
|
Details
|
|
|
06-22-2011
|
1.00
|
Drilling the mid-cabin decks
|
Details
|
|
|
06-20-2011
|
1.00
|
Baggage door seal angles
|
Details
|
|
|
06-19-2011
|
1.00
|
Checking the side skin bends
|
Details
|
|
|
06-19-2011
|
1.00
|
Bending the mid fuse side skins
|
Details
|
|
|
06-18-2011
|
1.00
|
Cutting and bending the longerons
|
Details
|
|
|
06-17-2011
|
1.00
|
Drilling landing gear weldment braces
|
Details
|
|
|
06-16-2011
|
1.00
|
Mid seat rail supports
|
Details
|
|
|
06-12-2011
|
1.00
|
Side channels, seat supports, cntrl col
|
Details
|
|
|
06-11-2011
|
1.00
|
Permanently mating fuse assemblies
|
Details
|
|
|
06-09-2011
|
1.00
|
Seat floor covers and heater boxes
|
Details
|
|
|
06-05-2011
|
1.00
|
Completed forward fuse subassembly
|
Details
|
|
|
06-04-2011
|
1.00
|
Riveting the firewall assembly
|
Details
|
|
|
06-03-2011
|
1.00
|
Riveting forward floor ribs, cont.
|
Details
|
|
|
05-30-2011
|
1.00
|
Riveting forward floor ribs
|
Details
|
|
|
05-29-2011
|
1.00
|
Fab'd boost pump & filter mounts, cont.
|
Details
|
|
|
05-29-2011
|
1.00
|
Fab'd boost pump & filter mounts
|
Details
|
|
|
05-23-2011
|
1.00
|
Priming forward fuse parts
|
Details
|
|
|
05-12-2011
|
1.00
|
Match drilling, cont.
|
Details
|
|
|
05-05-2011
|
1.00
|
Mating mid and forward fuse assemblies
|
Details
|
|
|
05-01-2011
|
1.00
|
Drilling forward fuse components
|
Details
|
|
|
04-26-2011
|
1.00
|
Completed riveting the firewall
|
Details
|
|
|
04-25-2011
|
1.00
|
Riveting the Firewall
|
Details
|
|
|
04-24-2011
|
1.00
|
Forward fuse floor ribs
|
Details
|
|
|
04-23-2011
|
1.00
|
Match drilling the seat supports/contrl mnts
|
Details
|
|
|
04-22-2011
|
1.00
|
Fab'ing the control column mounts
|
Details
|
|
|
04-21-2011
|
1.00
|
Attach angles and forward seat rail support
|
Details
|
|
|
04-17-2011
|
1.00
|
Finishing the pass-throughs, firewall dimpling
|
Details
|
|
|
04-17-2011
|
1.00
|
Control Cable pass-throughs
|
Details
|
|
|
04-16-2011
|
1.00
|
Supplemental tunnel access panel
|
Details
|
|
|
04-07-2011
|
1.00
|
SCAT tube support and parking brake
|
Details
|
|
|
04-06-2011
|
1.00
|
Match drilling the firewwall
|
Details
|
|
|
03-06-2011
|
1.00
|
Riveting bottom skins on
|
Details
|
|
|
02-27-2011
|
1.00
|
Floor stiffeners and dimpling skins
|
Details
|
|
|
02-23-2011
|
1.00
|
Riveting the step brackets
|
Details
|
|
|
02-23-2011
|
1.00
|
Mid-fuse bottom skins
|
Details
|
|
|
02-21-2011
|
1.00
|
Riveting rear seat ribs in-place
|
Details
|
|
|
02-21-2011
|
1.00
|
Baggage ribs and step brackets
|
Details
|
|
|
02-20-2011
|
1.00
|
Match drilling outboard seat ribs
|
Details
|
|
|
02-20-2011
|
1.00
|
Drilling rear seat ribs
|
Details
|
|
|
02-17-2011
|
1.00
|
Riveting flap actuator bracket
|
Details
|
|
|
02-16-2011
|
1.00
|
Rear seat rib intercostals and seat ribs
|
Details
|
|
|
02-16-2011
|
1.00
|
Outboard/inboard seat assemblies
|
Details
|
|
|
02-15-2011
|
1.00
|
Rear seat ribs, cont.
|
Details
|
|
|
02-13-2011
|
1.00
|
Rear seat rib assemblies
|
Details
|
|
|
02-11-2011
|
1.00
|
Riveting fuselage bulkhead components
|
Details
|
|
|
02-10-2011
|
1.00
|
Drilling rear spar attach bar
|
Details
|
|
|
02-09-2011
|
1.00
|
Drilling the fuse bulkhead assembly
|
Details
|
|
|
02-07-2011
|
1.00
|
Drilling, priming, & riveting of upright bars
|
Details
|
|
|
02-06-2011
|
1.00
|
Riveting aft seat rail supports
|
Details
|
|
|
02-01-2011
|
1.00
|
Modifing the Hat stiffeners
|
Details
|
|
|
01-31-2011
|
1.00
|
Riveting fwd center section blkhd parts
|
Details
|
|
|
01-31-2011
|
1.00
|
Drilling lng gear & riveting seat rail supports
|
Details
|
|
|
01-30-2011
|
1.00
|
Drilling the landing gear weldments
|
Details
|
|
|
01-29-2011
|
1.00
|
Match drilling seat rail supports/bulkheads
|
Details
|
|
|
01-28-2011
|
1.00
|
Locating mid-fuse bulkhead parts
|
Details
|
|
|
01-28-2011
|
1.00
|
Fab'd stiffener angles
|
Details
|
|
|
01-27-2011
|
1.00
|
Riveting ail trim attach brackets
|
Details
|
|
|
01-26-2011
|
1.00
|
Aileron trim to push rod attch brackets
|
Details
|
|
|
01-25-2011
|
1.00
|
Riveting the aileron trim assembly
|
Details
|
|
|
01-25-2011
|
1.00
|
Aileron trim servo install
|
Details
|
|
|
01-24-2011
|
1.00
|
Priming aileron trim links
|
Details
|
|
|
01-22-2011
|
1.00
|
Gretz Pitot attach
|
Details
|
|
|
01-21-2011
|
1.00
|
Aileron torque tube assembly
|
Details
|
|
|
01-20-2011
|
1.00
|
Drilling the aileron torque tubes
|
Details
|
|
|
01-19-2011
|
1.00
|
Cutting the torque tubes
|
Details
|
|
|
01-17-2011
|
1.00
|
Finished riveting wing bottom skins
|
Details
|
|
|
01-15-2011
|
1.00
|
Priming aileron push rod exteriors
|
Details
|
|
|
01-14-2011
|
1.00
|
Riveting rod ends on aileron push rods
|
Details
|
|
|
01-13-2011
|
1.00
|
Priming the inside of the push rods
|
Details
|
|
|
01-12-2011
|
1.00
|
Dilling the rod ends, cont.
|
Details
|
|
|
01-11-2011
|
1.00
|
Drilling the rod ends
|
Details
|
|
|
01-08-2011
|
1.00
|
Double flush riveting the flap trailing edges
|
Details
|
|
|
01-04-2011
|
1.00
|
Riveting flap leading edges, bottom skins
|
Details
|
|
|
01-02-2011
|
1.00
|
Wing and flap close-out inspections
|
Details
|
|
|
01-01-2011
|
1.00
|
Riveting flap top skins
|
|
|
|
12-31-2010
|
1.00
|
Riveting flap top skins, cont.
|
|
|
|
12-31-2010
|
1.00
|
Riveting flap skins
|
|
|
|
12-31-2010
|
1.00
|
Flap riveting, cont.
|
|
|
|
12-27-2010
|
1.00
|
Riveting flap nose ribs/hinge brackets, cont.
|
|
|
|
12-27-2010
|
1.00
|
Riveting flap nose ribs
|
|
|
|
12-24-2010
|
1.00
|
Dimpling, cont., riveting nose ribs/hinge brackets
|
|
|
|
12-21-2010
|
1.00
|
Dimpling flap skins
|
Details
|
|
|
12-18-2010
|
1.00
|
Prepping flaps for riveting
|
Details
|
|
|
12-18-2010
|
1.00
|
Flap lightening holes and dimpling
|
Details
|
|
|
12-16-2010
|
1.00
|
Drilling the flap components, cont.
|
Details
|
|
|
12-15-2010
|
1.00
|
Drilling the flap components, cont.
|
Details
|
|
|
12-14-2010
|
1.00
|
Drilling the flap components
|
Details
|
|
|
11-02-2010
|
1.00
|
Ailerons
|
|
|
|
11-01-2010
|
1.00
|
Fuel tanks
|
Details
|
|
|
10-31-2010
|
1.00
|
Fuel tank close-out inspection
|
Details
|
|
|
06-01-2010
|
1.00
|
Wing leading edge close-out inspections
|
Details
|
|
|
05-30-2010
|
1.00
|
Match drilling the leading edge ribs
|
Details
|
|
|
05-28-2010
|
1.00
|
Riveting the ailreon brackets
|
Details
|
|
|
05-23-2010
|
1.00
|
Drilling the leading edges
|
Details
|
|
|
05-14-2010
|
1.00
|
Riveting left top skins
|
Details
|
|
|
05-13-2010
|
1.00
|
Deburring attach Zee's
|
Details
|
|
|
05-08-2010
|
1.00
|
Riveting top skins, cont.
|
Details
|
|
|
05-06-2010
|
1.00
|
Dimpling leading edge splice strips
|
Details
|
|
|
04-26-2010
|
1.00
|
Installed wiring conduit in right wing
|
Details
|
|
|
04-25-2010
|
1.00
|
Finished drilling left ribs, stiffener & skin
|
Details
|
|
|
04-25-2010
|
1.00
|
Clecoed left wing top skins on
|
Details
|
|
|
04-24-2010
|
1.00
|
Drilling left leading edge assembly, cont.
|
Details
|
|
|
04-23-2010
|
1.00
|
Drilling left leading edge assembly
|
Details
|
|
|
04-19-2010
|
1.00
|
Completed riveting right top skins
|
Details
|
|
|
04-18-2010
|
1.00
|
Riveting top right wing skins
|
Details
|
|
|
04-17-2010
|
1.00
|
Cut attch zee's and tank stiffeners
|
Details
|
|
|
04-07-2010
|
1.00
|
Riveting in-board top skin
|
Details
|
|
|
03-31-2010
|
1.00
|
Assembled LE cradle
|
Details
|
|
|
03-28-2010
|
1.00
|
Cut out parts for LE cradle
|
Details
|
|
|
03-27-2010
|
1.00
|
Primed faying surfaces, LE Ribs
|
Details
|
|
|
03-27-2010
|
1.00
|
Completed scarf joints and dimpling
|
Details
|
|
|
03-24-2010
|
1.00
|
Left wing skin dimpling
|
Details
|
|
|
03-18-2010
|
1.00
|
Dimpling the outboard skin
|
Details
|
|
|
03-11-2010
|
1.00
|
Dimpling in-board skin and stiffeners
|
Details
|
|
|
03-08-2010
|
1.00
|
Creating scarf joint and dimpling
|
Details
|
|
|
03-07-2010
|
1.00
|
Countersinking screw s& rivet hole
|
Details
|
|
|
03-06-2010
|
1.00
|
Top skin drilling complete
|
Details
|
|
|
03-05-2010
|
1.00
|
Match drilling right top skins, cont.
|
Details
|
|
|
03-04-2010
|
1.00
|
Match drilling right top skins
|
Details
|
|
|
03-02-2010
|
1.00
|
Removed plastic from rivet lines
|
Details
|
|
|
02-28-2010
|
1.00
|
Riveting the rear spar, cont.
|
Details
|
|
|
02-27-2010
|
1.00
|
Finshed riveting doublers
|
Details
|
|
|
02-26-2010
|
1.00
|
Riveting on right rear spar
|
Details
|
|
|
02-15-2010
|
1.00
|
Finishing up some replacement parts
|
Details
|
|
|
02-13-2010
|
1.00
|
Deburring rear spar doublers
|
Details
|
|
|
02-12-2010
|
1.00
|
Clecoed rear spar to ribs
|
Details
|
|
|
02-11-2010
|
1.00
|
Completing aileron brackets
|
Details
|
|
|
02-10-2010
|
1.00
|
Aileron hinge brackets & doublers
|
Details
|
|
|
02-09-2010
|
1.00
|
Riveted & bolted ribs to right spar
|
Details
|
|
|
02-07-2010
|
2.00
|
Primed ribs and torque tube parts
|
Details
|
|
|
02-06-2010
|
2.00
|
Deburred ribs & torque tube components
|
Details
|
|
|
02-05-2010
|
3.00
|
Matched drilled right ribs to right spar
|
Details
|
|
|
02-04-2010
|
1.00
|
Match drilled flap hinge brackets
|
Details
|
|
|
02-03-2010
|
2.00
|
Finshed bolting on left ribs
|
Details
|
|
|
02-02-2010
|
1.00
|
Re-riveted the inboard rib
|
Details
|
|
|
02-01-2010
|
1.00
|
Started completion of attaching ribs
|
Details
|
|
|
01-31-2010
|
6.00
|
Riveted left wing ribs to spar
|
Details
|
|
|
01-30-2010
|
6.00
|
Prepped and primed left ribs
|
Details
|
|
|
01-29-2010
|
2.00
|
More rib deburring
|
Details
|
|
|
01-28-2010
|
1.00
|
Rib deburring
|
Details
|
|
|
01-27-2010
|
1.50
|
Enlarged tooling holes for pitot & conduit
|
Details
|
|
|
01-26-2010
|
2.00
|
Matched drilled left wing ribs and spar
|
Details
|
|
|
01-25-2010
|
1.50
|
Drilled flap hinge brackets
|
Details
|
|
|
01-24-2010
|
6.00
|
Finished fluting ribs, assembled torque tube brack
|
Details
|
|
|
01-23-2010
|
4.00
|
Primed screw holes
|
Details
|
|
|
01-23-2010
|
2.00
|
Fluted/straightened all the ribs
|
Details
|
|
|
01-21-2010
|
2.00
|
Attached tiedowns and misc nutplates
|
Details
|
|
|
01-20-2010
|
2.00
|
CSK'd screw holes
|
Details
|
|
|
01-19-2010
|
6.00
|
Riveted on nutplates
|
Details
|
|
|
01-17-2010
|
6.00
|
Countersinking rivet holes
|
Details
|
|
|
01-14-2010
|
2.00
|
Match drilled j-stiffeners
|
Details
|
|
|
01-12-2010
|
2.00
|
Cut j-stiffeners to length
|
Details
|
|
|
01-11-2010
|
2.00
|
Fab'd tiedown brackets
|
Details
|
|
|
01-10-2010
|
2.00
|
Riveted on wing spar extensions
|
Details
|
|
|
01-09-2010
|
3.00
|
Prepped/primed splice plates & spar extensions
|
Details
|
|
|
01-08-2010
|
1.00
|
Match drilling spar extensions
|
Details
|
|
|
01-06-2010
|
4.00
|
Inventory
|
Details
|
|
|
01-04-2010
|
1.00
|
Wing Kit arrives
|
Details
|
|
|
01-04-2010
|
2.00
|
Bottom rudder fairing
|
Details
|
|
|
10-09-2009
|
1.50
|
Added interior layups to the HS fairings
|
Details
|
|
|
10-06-2009
|
2.00
|
Added micro fillets
|
Details
|
|
|
10-05-2009
|
2.00
|
Fitting and glassing in the foam ribs
|
Details
|
|
|
10-04-2009
|
2.00
|
Initial fitting of HS/Elevator fairings
|
Details
|
|
|
10-03-2009
|
2.00
|
Final sanding of VS and rudder fairings
|
Details
|
|
|
09-07-2009
|
3.00
|
Sanding the VS fairing to shape
|
Details
|
|
|
08-30-2009
|
2.00
|
Adding micro to the VS fairing
|
Details
|
|
|
08-23-2009
|
6.00
|
Fitting VS fairing
|
Details
|
|
|
02-12-2009
|
3.00
|
Added micro fillets, finshed closing off aft side
|
Details
|
|
|
02-09-2009
|
2.00
|
Glassed in the temp rib
|
Details
|
|
|
02-08-2009
|
6.00
|
Temp foam rib for the VS fairing
|
Details
|
|
|
10-22-2008
|
3.00
|
Sanding the top rudder fairing
|
Details
|
|
|
10-17-2008
|
4.00
|
Match drilled top rudder fairing
|
Details
|
|
|
10-10-2008
|
2.00
|
Fitting rudder top fairing
|
Details
|
|
|
09-15-2008
|
1.00
|
Rudder adjust & elevator pushrod install
|
Details
|
|
|
09-14-2008
|
4.00
|
Attached HS, Elevators, VS, and rudder
|
Details
|
|
|
09-12-2008
|
2.00
|
Match drilling the elevator horns
|
Details
|
|
|
09-11-2008
|
2.00
|
HS mounted to work table
|
Details
|
|
|
09-10-2008
|
1.00
|
Elevator push rod assembly
|
Details
|
|
|
09-09-2008
|
2.00
|
Primed the elevator push rod and rod ends
|
Details
|
|
|
09-07-2008
|
1.00
|
Push rod priming prep
|
Details
|
|
|
09-06-2008
|
2.00
|
Drilling the elevator push rods
|
Details
|
|
|
09-05-2008
|
2.00
|
Elevator push rod fabrication
|
Details
|
|
|
09-03-2008
|
2.00
|
Assembled trim tab servo components
|
Details
|
|
|
09-02-2008
|
1.50
|
Drilled and CSK'd servo spacer
|
Details
|
|
|
08-30-2008
|
0.50
|
Drilled servo link and bell brank
|
Details
|
|
|
08-29-2008
|
3.00
|
Fabricated trim cable and bellcrank brackets
|
Details
|
|
|
08-24-2008
|
3.00
|
Riveted on aft top skin
|
Details
|
|
|
08-23-2008
|
2.00
|
Rear deck finished
|
Details
|
|
|
08-22-2008
|
2.00
|
Riveting the rear deck, continued
|
Details
|
|
|
08-20-2008
|
2.00
|
Riveting the rear deck and associated parts
|
Details
|
|
|
08-19-2008
|
3.00
|
Tailcone riveting, continued
|
Details
|
|
|
08-16-2008
|
1.50
|
Installed bell crank, more tailcone riveting
|
Details
|
|
|
08-15-2008
|
4.00
|
Began partner riveting
|
Details
|
|
|
08-13-2008
|
2.50
|
Riveted bellcrank ribs together
|
Details
|
|
|
08-12-2008
|
3.00
|
Begain riveting the tailcone
|
Details
|
|
|
08-11-2008
|
3.50
|
Began tailcone assembly
|
Details
|
|
|
08-10-2008
|
4.00
|
Primed the stiffeners, longerons, and skins
|
Details
|
|
|
08-09-2008
|
4.00
|
More priming prep
|
Details
|
|
|
07-13-2008
|
3.00
|
Riveted frames together
|
Details
|
|
|
07-10-2008
|
0.75
|
Riveted elevator bellcrank
|
Details
|
|
|
07-08-2008
|
8.00
|
Pirmed interior parts
|
Details
|
|
|
06-29-2008
|
0.50
|
Initial work on SB 06-08
|
Details
|
|
|
05-18-2008
|
1.00
|
Finished the VOR antenna doubler
|
Details
|
|
|
05-17-2008
|
1.00
|
Began building a doubler for the VOR antenna
|
Details
|
|
|
05-13-2008
|
1.00
|
All skins deburred and dimpled
|
Details
|
|
|
05-10-2008
|
0.75
|
And the deburring and dimpling continues
|
Details
|
|
|
05-08-2008
|
2.00
|
Finished the right skin, deburred/dimpled the left
|
Details
|
|
|
05-04-2008
|
3.50
|
Finished edge deburring skins, on to holes
|
Details
|
|
|
05-03-2008
|
2.50
|
Deburring complete except skins, dimpling
|
Details
|
|
|
04-27-2008
|
4.00
|
Deburring, continued
|
Details
|
|
|
04-19-2008
|
2.00
|
Disassembled the tailcone, began deburring
|
Details
|
|
|
04-18-2008
|
0.50
|
Final drilled seat belt anchors, cover plates
|
Details
|
|
|
04-15-2008
|
2.00
|
Misc drilling and fabrication while awaiting drill
|
Details
|
|
|
04-14-2008
|
1.00
|
Drilled aft deck to longerons
|
Details
|
|
|
04-13-2008
|
3.00
|
Attached and drilled top skins
|
Details
|
|
|
04-09-2008
|
1.00
|
Fabricated HS attachment bar support angle
|
Details
|
|
|
04-07-2008
|
0.50
|
Drilled static ports, fab'd up elevator stop
|
Details
|
|
|
04-06-2008
|
1.00
|
Attached F-1075 top skin to frame
|
Details
|
|
|
04-05-2008
|
4.50
|
Drilled the longerons and skins to frames
|
Details
|
|
|
04-04-2008
|
0.50
|
Rebent the left longeron
|
Details
|
|
|
04-03-2008
|
1.00
|
Attached longerons, spacer, and aft deck
|
Details
|
|
|
04-02-2008
|
0.30
|
Fabricated F-1010B spacer
|
Details
|
|
|
04-01-2008
|
2.00
|
Final drilled & CSK'd bell crank angle
|
Details
|
|
|
03-31-2008
|
2.00
|
Leveled tailcone and drilled rudder stop brace
|
Details
|
|
|
03-30-2008
|
0.00
|
Initial Tech counselor visit
|
Details
|
|
|
02-23-2008
|
3.00
|
Finished match drilling right-side stiffeners
|
Details
|
|
|
02-22-2008
|
2.00
|
Set bottom skin on sawhorses
|
Details
|
|
|
02-16-2008
|
0.50
|
Started on longerons
|
Details
|
|
|
02-15-2008
|
3.00
|
Fabricated stiffeners
|
Details
|
|
|
02-09-2008
|
3.00
|
Rolled elevator leading edges, more deburring
|
Details
|
|
|
02-08-2008
|
1.00
|
Corrosion clean-up
|
Details
|
|
|
02-02-2008
|
1.00
|
Installed trim tabs, bent hinge pins
|
Details
|
|
|
01-31-2008
|
0.50
|
Continued to deburr bulkheads
|
Details
|
|
|
01-29-2008
|
0.45
|
Finished riveting hinges, drilled safety wire hole
|
Details
|
|
|
01-28-2008
|
3.00
|
Cut hinges, drilled, deburred, and began riveting
|
Details
|
|
|
01-27-2008
|
2.00
|
Finished skin to tip rib rivets, more deburring
|
Details
|
|
|
01-26-2008
|
2.00
|
Riveted trailing edges
|
Details
|
|
|
01-20-2008
|
1.50
|
Trimmed elevator counter-weights, deburred blkhd
|
Details
|
|
|
01-19-2008
|
0.75
|
Riveted trim cable attch brackets and fab'd HS att
|
Details
|
|
|
01-18-2008
|
2.00
|
Pro-sealed the foam ribs and AEX wedge
|
Details
|
|
|
01-17-2008
|
1.00
|
Riveted trim tab horns and spar to bottom skin
|
Details
|
|
|
01-13-2008
|
3.00
|
Prepped and primed trim tab parts
|
Details
|
|
|
01-12-2008
|
1.50
|
Bulkhead stiffener and VS attachment bars
|
Details
|
|
|
01-11-2008
|
1.00
|
Finshed deburring and final drilled tie down bar
|
Details
|
|
|
01-10-2008
|
0.50
|
Started tailcone construction
|
Details
|
|
|
01-05-2008
|
1.00
|
Deburring trim tabs
|
Details
|
|
|
01-01-2008
|
3.00
|
Trim tabs continued
|
Details
|
|
|
12-31-2007
|
1.50
|
Began working on the trim tabs
|
Details
|
|
|
12-30-2007
|
2.50
|
Continued riveting tip rib assembly to elevators
|
Details
|
|
|
12-29-2007
|
2.00
|
Riveted root and tip ribs in-place
|
Details
|
|
|
12-29-2007
|
2.00
|
Riveted root and tip ribs in-place
|
Details
|
|
|
12-29-2007
|
2.00
|
Continued riveting tip rib assembly to elevators
|
Details
|
|
|
12-28-2007
|
1.50
|
Riveted skins to front spar
|
Details
|
|
|
12-28-2007
|
2.00
|
Began riveting front spar to elevator assembly
|
Details
|
|
|
12-27-2007
|
1.00
|
Continued riveting skins to rear spar
|
Details
|
|
|
12-27-2007
|
2.00
|
Continued riveting skins to rear spar
|
Details
|
|
|
12-24-2007
|
1.50
|
Began riveting skins to rear spar
|
Details
|
|
|
12-23-2007
|
2.50
|
Riveted ribs to skins
|
Details
|
|
|
12-22-2007
|
1.00
|
Riveted nutplates to reinforcement plates
|
Details
|
|
|
12-16-2007
|
0.50
|
Riveted doublers, root ribs, & elev horns to front
|
Details
|
|
|
12-16-2007
|
0.50
|
Continued riveting front spar components
|
Details
|
|
|
12-13-2007
|
1.00
|
Finished tip ribs and added counterbalance skin
|
Details
|
|
|
12-12-2007
|
0.50
|
Riveted tip ribs together
|
Details
|
|
|
01-21-2007
|
3.00
|
Primed all parts
|
Details
|
|
|
01-20-2007
|
3.00
|
Dimpled all parts
|
Details
|
|
|
01-19-2007
|
1.50
|
Deburring complete! Finally
|
Details
|
|
|
01-18-2007
|
1.50
|
Deburring is now my life
|
Details
|
|
|
01-15-2007
|
1.50
|
Even more deburring (make it stop), CSK'd AEX
|
Details
|
|
|
01-11-2007
|
1.00
|
More beburring
|
Details
|
|
|
01-10-2007
|
1.00
|
Began hole deburring with rear spars
|
Details
|
|
|
01-09-2007
|
1.00
|
Disassembly complete
|
Details
|
|
|
01-08-2007
|
1.00
|
Finished final drilling, started disassembly
|
Details
|
|
|
01-07-2007
|
3.50
|
Drilled trim cable brackets, moved clecos to right
|
Details
|
|
|
01-06-2007
|
2.50
|
Began final drilling with left side
|
Details
|
|
|
01-05-2007
|
1.00
|
Cut trailing edge AEX to size, attached horns
|
Details
|
|
|
01-04-2007
|
1.00
|
Attached left top skin to skeleton
|
Details
|
|
|
01-03-2007
|
1.00
|
Attached tip rib assemblies
|
Details
|
|
|
01-02-2007
|
2.50
|
Deburring complete, bent close-out tabs
|
Details
|
|
|
01-01-2007
|
3.50
|
More deburring, celcoed/drilled internal and t-rib
|
Details
|
|
|
12-31-2006
|
2.00
|
More deburring
|
Details
|
|
|
12-30-2006
|
4.50
|
Edge deburring cont.
|
Details
|
|
|
12-29-2006
|
3.00
|
Began work on elevators
|
Details
|
|
|
12-28-2006
|
2.00
|
Riveting the HS
|
Details
|
|
|
12-27-2006
|
2.00
|
HS clecoed for riveting
|
Details
|
|
|
12-26-2006
|
1.00
|
Finished the riveting the skin to the ribs
|
Details
|
|
|
12-25-2006
|
3.00
|
More skin riveting
|
Details
|
|
|
12-24-2006
|
4.00
|
Started riveting HS skin to the spar flange
|
Details
|
|
|
12-23-2006
|
3.50
|
Riveted front spar to nose ribs
|
Details
|
|
|
12-21-2006
|
0.70
|
Riveted the nose ribs to the HS skins
|
Details
|
|
|
12-21-2006
|
1.00
|
Close-out Inspection
|
Details
|
|
|
12-20-2006
|
1.10
|
Riveted stringer assembly/1004 ribs to the front s
|
Details
|
|
|
12-19-2006
|
1.50
|
Riveted stringer assembly together
|
Details
|
|
|
12-17-2006
|
6.00
|
Primed HS parts
|
Details
|
|
|
12-15-2006
|
2.00
|
Dimpling and CSK complete
|
Details
|
|
|
12-14-2006
|
0.50
|
Dimpling cont.
|
Details
|
|
|
12-13-2006
|
1.00
|
Dimpled ribs and scuffed parts
|
Details
|
|
|
12-12-2006
|
1.00
|
Finished dimpling the skins
|
Details
|
|
|
12-11-2006
|
1.00
|
Finished deburring ribs
|
Details
|
|
|
12-09-2006
|
0.50
|
More dimpling
|
Details
|
|
|
12-06-2006
|
1.00
|
Skins deburred! On to dimpling
|
Details
|
|
|
12-05-2006
|
1.00
|
Even more deburring
|
Details
|
|
|
12-04-2006
|
1.00
|
Deburring holes
|
Details
|
|
|
12-03-2006
|
3.70
|
Disassembled the HS, began deburring
|
Details
|
|
|
12-02-2006
|
3.70
|
Moved clecos from right to left, final drilled lef
|
Details
|
|
|
12-01-2006
|
1.70
|
Final drilled right skin
|
Details
|
|
|
11-29-2006
|
1.50
|
Installed stringer web, finshed right skin attach
|
Details
|
|
|
11-28-2006
|
1.50
|
Clecoing initial HS assembly
|
Details
|
|
|
11-26-2006
|
3.00
|
Initial HS skin-rib-spar assembly
|
Details
|
|
|
11-25-2006
|
4.00
|
Cradel construction and more rib prep
|
Details
|
|
|
11-24-2006
|
4.00
|
HS inspar and nose rib fitting and prep
|
Details
|
|
|
11-22-2006
|
2.00
|
Riveted douber, spar caps, and brackets
|
Details
|
|
|
11-19-2006
|
4.00
|
Diassembled, prepped, and primed parts
|
Details
|
|
|
11-18-2006
|
3.00
|
Fab'd attach brackets and match driled to spar
|
Details
|
|
|
11-16-2006
|
1.00
|
Marked layout lines for attach brackets
|
Details
|
|
|
11-12-2006
|
3.00
|
Began building up the front spar
|
Details
|
|
|
11-09-2006
|
2.00
|
Cut stringers to size
|
Details
|
|
|
11-07-2006
|
4.00
|
Riveted hinges and doubler to spar.
|
Details
|
|
|
11-05-2006
|
3.00
|
Installed Cnter-bal rib, rolling leading edge
|
Details
|
|
|
11-02-2006
|
2.00
|
Double-flush riveted trailing edge
|
Details
|
|
|
11-01-2006
|
1.00
|
Rudder Close-out inspection
|
Details
|
|
|
11-01-2006
|
2.00
|
Riveted left stiffeners, tp & btm ribs, joined ski
|
Details
|
|
|
10-29-2006
|
0.80
|
Positioned stiffeners on left skin
|
Details
|
|
|
10-28-2006
|
6.50
|
Finished riveting VS
|
Details
|
|
|
10-28-2006
|
1.00
|
Began riveting rudder
|
Details
|
|
|
10-27-2006
|
2.00
|
Riveted rear spar components
|
Details
|
|
|
10-27-2006
|
1.00
|
Close-out Inspection
|
Details
|
|
|
10-23-2006
|
1.00
|
Riveted rudder stops
|
Details
|
|
|
10-22-2006
|
6.50
|
Primed VS, Rudder, and part of HS
|
Details
|
|
|
10-21-2006
|
2.00
|
Spar assembly and final drilling- ready to prime
|
Details
|
|
|
10-20-2006
|
1.30
|
Continued to edge deburr the rear spar
|
Details
|
|
|
10-19-2006
|
1.90
|
Started on HS.
|
Details
|
|
|
10-18-2006
|
0.70
|
VS ready for priming
|
Details
|
|
|
10-17-2006
|
2.10
|
Completed deburiing and dimpling all VS parts
|
Details
|
|
|
10-16-2006
|
2.00
|
Deburring and dimpling the VS
|
Details
|
|
|
10-15-2006
|
6.10
|
Assembled frame, attached and drilled skin
|
Details
|
|
|
10-14-2006
|
2.10
|
Restarted the VS after getting new parts
|
Details
|
|
|
10-13-2006
|
2.00
|
Trailing edge wedge CSK - rudder ready for primer
|
Details
|
|
|
10-12-2006
|
1.00
|
Rudder dimpling continued
|
Details
|
|
|
10-11-2006
|
2.00
|
Rudder teardown, deburr, and dimple
|
Details
|
|
|
10-10-2006
|
2.00
|
Final drilled rudder trailing egde
|
Details
|
|
|
10-09-2006
|
1.00
|
Match drilling rudder skin to skeleton
|
Details
|
|
|
10-08-2006
|
2.00
|
Rudder skeleton match drilling
|
Details
|
|
|
10-07-2006
|
2.00
|
Rudder match drilling and deburring
|
Details
|
|
|
10-06-2006
|
2.00
|
Rudder start -- ribs, stiffeners, and shear clips
|
Details
|
|
|
10-05-2006
|
2.50
|
Rib and spar doubler deburring
|
Details
|
|
|
10-02-2006
|
0.00
|
Ordered replacement parts
|
Details
|
|
|
09-29-2006
|
0.50
|
Match drill spar caps to spar
|
Details
|
|
|
09-28-2006
|
0.00
|
Ordered missing parts
|
Details
|
|
|
09-27-2006
|
2.00
|
VS Start
|
Details
|
|
|
09-26-2006
|
3.50
|
Kit delvery and inventory
|
Details
|
|