KitLog pro

Powered By Kitlog Pro v2.0

TODD'S WEB SITE
' style=
Date:  1-17-2010
Number of Hours:  6.00
Manual Reference:  Sec 13 - Spars
Brief Description:  Countersinking rivet holes

Ran a #40 through all the spar flange holes that had not already been match drilled. Then dialed in a #40 pilot countersink and began CSK’ing all of the nutplate rivet attach holes. This took a couple of nights to get done as there’s a huge number of CSKs that have to be made—I thought this task would never end. After the CSKs were done, I went back and dabbed a blob of Sanchem into each CSK with a small paint brush (the kind you would paint water colors or a model airplane with) for corrosion protection. Figured if the Sanchem worked (I wasn’t doing any of the prep steps like I normally would) them maybe I wouldn’t prime the holes as called for in the plans. The Sanchem worked just fine.
' style=

Rivet hole CSKs

Rivet hole CSKs

' style=

More CSKs

More CSKs

' style=

Action shot of me making the CSKs

Action shot of me making the CSKs

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.