|
|
TODD'S WEB SITE
|
Date: 12-6-2014
|
Number of Hours: 1.00
|
Manual Reference:
|
Brief Description: Panel Fired up
|
|
Now that the wiring is secured, I've re-installed all of the avionics and checked that everything turned on and no magic smoke escaped! I've comleted all of the post installation checks to include upadting all of the databases and software (VP-200, G3X, and GTN 650).
From left to right: VP-200 Dispaly W/ Switch panel underneath, G3X PFD, G3X MFD, Radio stack (PS Eng PMX 5000 Audio panel, SL 30, GTN 650, and TruTrak GX auto pliot), TrutTrak Gemini Back-up PFD.
|
|
Avionics re-installed
|
|
Fired up!
|
|
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |