Brief Description: Bulkhead stiffener and VS attachment bars
Cut the bulkhead siffener from a length of J channel and deburred it. I then bent the VS attachment bars to remove the bow from manufacturing and deburred them I then match drilled then, the stiffener and the rudder cable angle to the bulkhead. Finally I opened up two 1/8 holes to 5/8's using a uni-bit.