KitLog pro

Powered By Kitlog Pro v2.0

Bob Leffler's RV-10
Work Logs Found: 91
Category Work Time: 228 Hours
 Date
Hours
Work Log Summary

Details

 04-12-2015
0.00
New Baffles
Details
       

 06-24-2013
2.00
Backup Alternator, Fuel Gage, Fuel Vent
Details
       

 06-23-2013
1.00
Ram Air
Details
       

 06-22-2013
2.00
Engine Baffle
Details
       

 06-01-2013
5.00
Oil Lines
Details
       

 05-29-2013
6.00
Brakes
Details
       

 05-28-2013
4.00
Starter and Alternator Wiring
Details
       

 05-27-2013
4.00
Oil Cooler, ANL Fuses, Left Mag
Details
       

 05-19-2013
3.00
Secure Prop Control Cable
Details
       

 05-19-2013
3.00
Oil Cooler Vent & Fuel and Oil Pressure Sensors
Details
       

 05-18-2013
6.00
Exhaust and Engine Sensors
Details
       

 05-17-2013
2.00
Oil Cooler, RMP Sensor, and Oil Pressure Switch
Details
       

 05-16-2013
2.00
Oil Breather Tube
Details
     

 05-16-2013
3.00
Fuel Lines
Details
       

 05-15-2013
4.00
Fuel Flow Sensor Mount and Ram Air Control Cable
Details
       

 05-14-2013
4.00
Fuel Flow Sensor Mount and Excess Fuel tube
Details
       

 05-13-2013
1.00
Elevator Control and Mixture Control
Details
       

 05-11-2013
3.00
Engine Sensors and Mixture Control Cable
Details
       

 05-09-2013
4.00
Mixture Control Cable
Details
     

 05-08-2013
6.00
Governor and Mixture Control Cables
Details
       

 05-06-2013
4.00
Engine Sensor Termination
Details
     

 05-04-2013
3.00
Fuel Injection and Purge Valve Control Cable
Details
       

 05-04-2013
3.00
Control Cables #2
Details
       

 05-02-2013
6.00
Control Cables
Details
       

 04-30-2013
3.00
Heater Control Cables & Purge Valve Control Cable
Details
       

 04-30-2013
3.00
Baffling
Details
       

 04-27-2013
3.00
Trim Heater Control Cables & Engine Instrumentatio
Details
       

 04-27-2013
4.00
Heat Shields for Control Cables
Details
       

 04-23-2013
1.50
Engine Wiring
Details
     

 03-23-2013
3.00
Spark Plug Wire Holders and Engine Mount Covers
Details
       

 03-23-2013
3.00
Baffle and Engine Heater
Details
       

 03-22-2013
1.50
Baffle Install
Details
     

 01-12-2013
4.00
Install Reiff Engine Heaters
Details
       

 12-17-2011
3.00
Wired G3i Ignition
Details
       

 12-17-2011
3.00
Manifold Pressure
Details
       

 11-01-2011
2.00
Baffling & Battery
Details
       

 10-23-2011
2.00
Alternator Spacers Re-Work
Details
       

 09-25-2011
3.00
Misc items
Details
       

 08-29-2011
0.50
Drilling out stainless shields
Details
     

 08-14-2011
5.00
Baffles #20
Details
       

 08-13-2011
3.00
Baffles #19
Details
       

 08-12-2011
2.00
Baffles #18
Details
       

 08-08-2011
3.00
Baffles #17
Details
       

 08-07-2011
4.00
Baffles #16
Details
       

 08-05-2011
2.00
Air ramps fabricated
Details
       

 07-17-2011
4.00
Exhaust #4
Details
       

 07-16-2011
3.00
Exhaust #3
Details
       

 07-14-2011
1.00
AFS CHT Installation
Details
       

 07-13-2011
2.00
Exhaust #2
Details
       

 07-11-2011
2.00
Baffles #15
Details
       

 07-10-2011
4.00
Drain oil, install exhaust pipes, and EGT sensors
Details
       

 07-07-2011
1.00
Baffles #14 and Wing Tip Lights
Details
       

 07-06-2011
2.00
Baffles #13
Details
     

 07-04-2011
2.00
Baffles #12
Details
       

 07-03-2011
5.00
Baffles #11
Details
       

 07-02-2011
4.00
Baffles #10
Details
       

 07-01-2011
2.00
Baffles #9
Details
       

 06-30-2011
0.50
Baffles #8
Details
       

 06-30-2011
0.50
Baffles #7
Details
       

 06-30-2011
1.00
Baffles #6
Details
       

 06-29-2011
2.00
Baffle #5
Details
       

 06-27-2011
2.00
Wing Tip & Baffle
Details
       

 05-10-2011
2.00
Ram Air Mod
Details
       

 05-03-2011
1.50
Baffles #4
Details
       

 05-01-2011
1.00
Baffle #3
Details
     

 03-31-2011
2.00
Baffles #2
Details
       

 03-20-2011
4.00
Bower Ram Air - Throttle/Mixture Cable Bracket
Details
       

 03-20-2011
0.25
Baffles
Details
     

 03-01-2011
1.25
Hang the Propeller
Details
       

 02-27-2011
3.00
Spinner Completion and Rudder Fairing
Details
       

 02-26-2011
3.00
Spinner Filler Plates
Details
       

 02-20-2011
3.00
Spinner, Cowl, and NAV Antenna Doubler
Details
       

 02-18-2011
1.00
Spinner #5
Details
       

 02-16-2011
2.00
Spinner
Details
       

 02-15-2011
0.25
FM-200 Uninstall
Details
     

 02-12-2011
2.00
Spinner, Cowl, and Rudder Fairings
Details
       

 02-12-2011
2.00
Rod Bower Ram Air
Details
       

 02-06-2011
2.00
Alternator
Details
       

 02-05-2011
2.00
Hang engine, install governor and alternator
Details
       

 02-05-2011
1.00
Engine #2
Details
       

 02-05-2011
1.00
Backup Alternator
Details
       

 01-29-2011
2.00
Engine #1
Details
       

 01-27-2011
1.00
Firewall Forward and Engine
Details
       

 01-22-2011
2.00
Spinner Prep #3 and Fuelage on it's gear
Details
       

 01-16-2011
1.00
Spinner Prep #2
Details
     

 01-15-2011
1.00
Spinner Prep
Details
       

 01-01-2011
2.00
Re-doing the Cowl Hinges and Motor Mount
Details
     

 12-30-2010
4.00
Engine Mount and Main Tire Assembly
Details
       

 06-07-2010
1.00
Mounting Oild Cooler Mount and Finish Kit
Details
       

 06-05-2010
1.00
Oil Cooler Mount #2
Details
     

 06-03-2010
1.50
Oil Cooler Mount
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.