Date
|
Hours
|
Work Log Summary
|
Details
|
03-16-2013
|
1.00
|
Pitch trim servo
|
Details
|
|
|
01-04-2010
|
2.00
|
Bottom rudder fairing
|
Details
|
|
|
10-09-2009
|
1.50
|
Added interior layups to the HS fairings
|
Details
|
|
|
10-06-2009
|
2.00
|
Added micro fillets
|
Details
|
|
|
10-05-2009
|
2.00
|
Fitting and glassing in the foam ribs
|
Details
|
|
|
10-04-2009
|
2.00
|
Initial fitting of HS/Elevator fairings
|
Details
|
|
|
10-03-2009
|
2.00
|
Final sanding of VS and rudder fairings
|
Details
|
|
|
09-07-2009
|
3.00
|
Sanding the VS fairing to shape
|
Details
|
|
|
08-30-2009
|
2.00
|
Adding micro to the VS fairing
|
Details
|
|
|
08-23-2009
|
6.00
|
Fitting VS fairing
|
Details
|
|
|
02-12-2009
|
3.00
|
Added micro fillets, finshed closing off aft side
|
Details
|
|
|
02-09-2009
|
2.00
|
Glassed in the temp rib
|
Details
|
|
|
02-08-2009
|
6.00
|
Temp foam rib for the VS fairing
|
Details
|
|
|
10-22-2008
|
3.00
|
Sanding the top rudder fairing
|
Details
|
|
|
10-17-2008
|
4.00
|
Match drilled top rudder fairing
|
Details
|
|
|
10-10-2008
|
2.00
|
Fitting rudder top fairing
|
Details
|
|
|
08-24-2008
|
3.00
|
Riveted on aft top skin
|
Details
|
|
|
08-23-2008
|
2.00
|
Rear deck finished
|
Details
|
|
|
08-22-2008
|
2.00
|
Riveting the rear deck, continued
|
Details
|
|
|
08-20-2008
|
2.00
|
Riveting the rear deck and associated parts
|
Details
|
|
|
08-19-2008
|
3.00
|
Tailcone riveting, continued
|
Details
|
|
|
08-16-2008
|
1.50
|
Installed bell crank, more tailcone riveting
|
Details
|
|
|
08-15-2008
|
4.00
|
Began partner riveting
|
Details
|
|
|
08-13-2008
|
2.50
|
Riveted bellcrank ribs together
|
Details
|
|
|
08-12-2008
|
3.00
|
Begain riveting the tailcone
|
Details
|
|
|
08-11-2008
|
3.50
|
Began tailcone assembly
|
Details
|
|
|
08-10-2008
|
4.00
|
Primed the stiffeners, longerons, and skins
|
Details
|
|
|
08-09-2008
|
4.00
|
More priming prep
|
Details
|
|
|
07-13-2008
|
3.00
|
Riveted frames together
|
Details
|
|
|
07-10-2008
|
0.75
|
Riveted elevator bellcrank
|
Details
|
|
|
07-08-2008
|
8.00
|
Pirmed interior parts
|
Details
|
|
|
06-29-2008
|
0.50
|
Initial work on SB 06-08
|
Details
|
|
|
05-18-2008
|
1.00
|
Finished the VOR antenna doubler
|
Details
|
|
|
05-17-2008
|
1.00
|
Began building a doubler for the VOR antenna
|
Details
|
|
|
05-13-2008
|
1.00
|
All skins deburred and dimpled
|
Details
|
|
|
05-10-2008
|
0.75
|
And the deburring and dimpling continues
|
Details
|
|
|
05-08-2008
|
2.00
|
Finished the right skin, deburred/dimpled the left
|
Details
|
|
|
05-04-2008
|
3.50
|
Finished edge deburring skins, on to holes
|
Details
|
|
|
05-03-2008
|
2.50
|
Deburring complete except skins, dimpling
|
Details
|
|
|
04-27-2008
|
4.00
|
Deburring, continued
|
Details
|
|
|
04-19-2008
|
2.00
|
Disassembled the tailcone, began deburring
|
Details
|
|
|
04-18-2008
|
0.50
|
Final drilled seat belt anchors, cover plates
|
Details
|
|
|
04-15-2008
|
2.00
|
Misc drilling and fabrication while awaiting drill
|
Details
|
|
|
04-14-2008
|
1.00
|
Drilled aft deck to longerons
|
Details
|
|
|
04-13-2008
|
3.00
|
Attached and drilled top skins
|
Details
|
|
|
04-09-2008
|
1.00
|
Fabricated HS attachment bar support angle
|
Details
|
|
|
04-07-2008
|
0.50
|
Drilled static ports, fab'd up elevator stop
|
Details
|
|
|
04-06-2008
|
1.00
|
Attached F-1075 top skin to frame
|
Details
|
|
|
04-05-2008
|
4.50
|
Drilled the longerons and skins to frames
|
Details
|
|
|
04-04-2008
|
0.50
|
Rebent the left longeron
|
Details
|
|
|
04-03-2008
|
1.00
|
Attached longerons, spacer, and aft deck
|
Details
|
|
|
04-02-2008
|
0.30
|
Fabricated F-1010B spacer
|
Details
|
|
|
04-01-2008
|
2.00
|
Final drilled & CSK'd bell crank angle
|
Details
|
|
|
03-31-2008
|
2.00
|
Leveled tailcone and drilled rudder stop brace
|
Details
|
|
|
02-23-2008
|
3.00
|
Finished match drilling right-side stiffeners
|
Details
|
|
|
02-22-2008
|
2.00
|
Set bottom skin on sawhorses
|
Details
|
|
|
02-16-2008
|
0.50
|
Started on longerons
|
Details
|
|
|
02-15-2008
|
3.00
|
Fabricated stiffeners
|
Details
|
|
|
02-08-2008
|
1.00
|
Corrosion clean-up
|
Details
|
|
|
01-31-2008
|
0.50
|
Continued to deburr bulkheads
|
Details
|
|
|
01-12-2008
|
1.50
|
Bulkhead stiffener and VS attachment bars
|
Details
|
|
|
01-11-2008
|
1.00
|
Finshed deburring and final drilled tie down bar
|
Details
|
|
|
01-10-2008
|
0.50
|
Started tailcone construction
|
Details
|
|