Brief Description: Attached F-1075 top skin to frame
Began this session by attaching the F-1009 bulkhead and then laid in the 3 top-side stiffeners. I then clecoed the 1075 top skin into place. It went on without much difficulty. I then began match drilling the stiffeners and skin. I got the left one drilled and decided I really needed more clecos in order to move forward so I went on-line and placed an order with the Yard Store (went a head and ordered some more drill bits while I was at it).
F-1009 bulkhead and top stiffeners celcoed in-place