Brief Description: Drilled the longerons and skins to frames
Today I got a lot of drilling done. I started by match drilling both longerons to the side skins. I then final drilled the sides to the frames/bulkheads. Once that was done, I got a helper and we flipped the tailcone over so I could final drill all of the remaining holes on the bottom. Well, after a lot of drilling and moving clecos around I completed all of the drilling and flipped the tailcone back upright. I forget how many #40 clecos I have, but I wish I had around 75 more.