Brief Description: Drilled static ports, fab'd up elevator stop
I recieved my SafeAir Pitot-Static kit today! Went ahead and drilled the static port holes out to .250 per the instructions. I then jumped ahead in the plans and fabricated the up elevator stop. It's cut to shape an drilled but still needs to be deburred.