KitLog pro

Powered By Kitlog Pro v2.0

TODD'S WEB SITE
' style=
Date:  10-9-2009
Number of Hours:  1.50
Manual Reference:  Sec 12 - Fairings
Brief Description:  Added interior layups to the HS fairings

The micro fillets were dry so I sanded the interior of the fairings, buttered with epoxy and glassed in a 2-layer BID layup to finish off the fairings.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.