KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
Work Logs Found: 64
Category Work Time: 162 Hours
 Date
Hours
Work Log Summary

Details

 01-16-2020
2.00
Tire rotation time
Details
     

 09-11-2018
2.00
All new pads, shoes, and rubber
Details
       

 09-01-2018
1.00
Shake n Shimmy
Details
     

 07-17-2018
1.00
New Disc is on
Details
     

 07-11-2018
1.00
Brake shudder investigation
Details
       

 02-27-2018
3.00
Brakes come alive!
Details
       

 02-23-2018
0.00
A long day without conclusion 2
Details
       

 02-23-2018
7.00
A long day without conclusion
Details
       

 02-22-2018
1.00
Time for some real stopping power
Details
     

 01-25-2018
0.50
Gear Leg Fairing BID fix
Details
     

 12-13-2016
1.00
New Tires, and tubes all around
Details
     

 05-02-2016
0.25
Taxi tests are good
Details

 04-30-2016
2.00
The source is found! and shame on Matco
Details
       

 04-28-2016
1.00
Re-shaping the wheel pant
Details
     

 04-27-2016
4.00
The problem has revealed itself
Details
       

 04-23-2016
1.00
Brake MC-4 mod
Details
       

 10-14-2015
4.00
New Tires installed
Details
       

 04-27-2015
4.00
First tire rotation...right in time
Details
       

 02-10-2015
0.50
Pant trim
Details
     

 02-09-2015
1.50
Pant cleanup and post cure, w ideas
Details
       

 02-06-2015
3.00
Pant glass n carbon
Details
       

 02-04-2015
0.00
Wheel pants Mods 2
Details
       

 02-04-2015
6.00
Wheel pants Mods
Details
       

 12-15-2014
1.00
Matco Bearings are "special"
Details
     

 12-08-2014
3.00
A clue my dear Watson!
Details
       

 12-07-2014
2.00
Shuttle launch is canceled
Details
       

 05-22-2014
3.00
Fairings get contour and glass
Details
     

 05-21-2014
1.00
I have my own cheerleader
Details
       

 05-09-2014
2.00
Flocro contoured
Details
     

 05-08-2014
3.00
Flocro and trimming the TE
Details
       

 05-06-2014
4.00
More nutplates and trimming the smile
Details
       

 05-06-2014
0.00
More nutplates and trimming the smile
Details
       

 05-05-2014
3.00
Fairing trim and pants back on
Details
       

 05-02-2014
4.00
Left fairing added and pants removed
Details
       

 05-01-2014
0.00
Fairings and more fairings 2
Details
       

 05-01-2014
4.00
Fairings and more fairings
Details
       

 04-30-2014
4.00
Tedious I tell ya
Details
     

 04-29-2014
2.00
Brake line Bid and pee tube exit
Details
       

 04-28-2014
4.00
Nutplates and flox
Details
       

 04-26-2014
3.00
Let's get one thing straight...
Details
       

 04-25-2014
0.00
Pants are on...and that's always a good thing 2
Details
       

 04-25-2014
9.00
Pants are on...and that's always a good thing
Details
       

 04-24-2014
7.00
Wheel pant installation
Details
       

 04-23-2014
2.50
Wheels and Tires back on
Details
       

 04-22-2014
6.50
Wheel pants
Details
       

 04-21-2014
2.00
Irony and confessions to an engineer
Details
       

 04-19-2014
0.00
Holy Toe-in batman! 2
Details
       

 04-19-2014
8.00
Holy Toe-in batman!
Details
       

 04-18-2014
2.00
Gear leg prep for fairings
Details
       

 11-08-2013
2.00
Lets start over
Details
       

 06-16-2013
0.50
Glassing the lines
Details
     

 06-15-2013
0.00
Brake Line, Pee line, and other good stuff 2
Details
       

 06-15-2013
6.00
Brake Line, Pee line, and other good stuff
Details
       

 06-10-2013
4.00
Brakes lines and fittings
Details
       

 06-08-2013
8.00
Installing the Main Wheels/ brakes etc.
Details
       

 05-20-2013
0.00
Wheels, brakes, brake line prep 2
Details
       

 05-20-2013
8.00
Wheels, brakes, brake line prep
Details
       

 01-19-2013
0.50
Left Axle holes re-drilled
Details
     

 01-13-2013
1.00
Main gear bolts installed
Details
     

 01-09-2013
2.00
Tire woes
Details
     

 12-09-2012
1.50
Removing the axles
Details
       

 12-07-2012
0.50
Tire and Tube install
Details
     

 10-07-2012
0.50
Test Fit and Install
Details
       

 04-12-2012
0.50
Loctite
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.