KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  4-29-2014
Number of Hours:  2.00
Manual Reference:  ch 9
Brief Description:  Brake line Bid and pee tube exit

Pic #1 shows that I laid down aluminum foil tape in prep for the fairing skirt. However, before laying this up I need to hardmount the fairings onto the gear legs and I can't do that until I can verify the angles of the gear leg fairings. SO, I can't do all that until the brake lines and pee tube are under cured strips of BID tape. I laid them up in 3 places along the legs. After cure I'll get both fairings microed in place in prep for the skirts. getting closer to seeing the belly of this airplane in primer :0
The pee tube will exit through a 90 degree aluminum bend that may or may not be flared at the end. It will depend on the amount "suction" this provides. Lowest drag is the goal.
' style=

bid over lines

bid over lines

' style=

pee tube exit

pee tube exit

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.