KitLog pro

Powered By Kitlog Pro v2.0

Cowboy's RV-10
Work Logs Found: 118
Category Work Time: 357 Hours
 Date
Hours
Work Log Summary

Details

 08-15-2012
2.50
Cleaned Proseal from R-Tank Ribs
Details
       

 08-08-2012
1.50
Remove Proseal from R-Tank Ribs
Details
       

 08-07-2012
4.00
Remove Proseal from L-Wing Skin
Details
       

 08-06-2012
3.00
That's Right, Disassemble the L-Tank!!!
Details
       

 08-05-2012
2.00
Rivet L-Tank Bottom Ribs to Inner Ribs
Details
       

 08-02-2012
2.50
Rivet L-Tank Top Skin to Inner Ribs
Details
       

 07-31-2012
2.00
Proseal L-Tank Inner Ribs
Details
       

 07-30-2012
2.00
Soda Blast Tank Rib Edges for Proseal
Details
       

 07-29-2012
1.50
Cleaned and Prepped L-Tank and Ribs for Proseal
Details
       

 05-02-2012
4.00
Refine Fuel Tank Sensor Location
Details
       

 04-30-2012
2.50
Calculate Low Fuel Sensor Location
Details
       

 04-29-2012
1.00
Rivet and Proseal Xtended Tank Flanges
Details
       

 04-27-2012
0.50
Determine Low Fuel Sensor Location
Details
       

 04-25-2012
0.50
Proseal Xtra Rng Tank Bungs to Tank End Ribs
Details
       

 04-24-2012
1.00
Drill Tank End Ribs for Xtra Rng Tank Bungs
Details
       

 04-23-2012
1.00
Drill Extended RngTank Fuel Flange Adapters
Details
       

 04-22-2012
1.40
Drill Left Aileron Outboard Hinge Bracket
Details
       

 04-15-2012
4.00
Encapsulate shop heads with Proseal, rivet Tanks R
Details
       

 04-14-2012
2.00
Rivet Right Wing Drain and Fuel Cap Flanges
Details
       

 04-12-2012
2.50
Right Wing Tank Stiffener Riveting
Details
       

 04-11-2012
2.50
Right Wing Tanks Stiffener Riveting
Details
       

 04-10-2012
2.50
Left Wing Tank Bottom Stiffener Riveting
Details
       

 04-09-2012
2.00
Left Wing Bottom Stiffener Riveting
Details
       

 04-08-2012
1.50
Rivet Top Left Wing Tank Stiffeners
Details
       

 04-07-2012
4.75
Proseal Right Tank Stiffeners
Details
       

 04-06-2012
6.00
Left Wing Tank Stiffeners and End Rib Proseal
Details
       

 04-05-2012
4.50
Prep Wing Tank Hardware for Proseal
Details
       

 04-04-2012
1.00
Right Tank Attach Bracket Riveting
Details
       

 04-03-2012
1.00
Right Tank Attach Bracket Sub-Assembly
Details
       

 04-02-2012
0.60
Left Tank Attach Bracket Riveting
Details
       

 04-01-2012
4.00
Left Tank Attach Bracket Sub-Assembly
Details
       

 03-31-2012
0.10
Aileron and Flap Torsion Box Assy
Details
       

 01-02-2012
3.50
Finish Dimpling L/R Tank Skins
Details
       

 01-01-2012
3.50
Fit Check L-Tank Assy and begin Dimpling
Details
       

 12-31-2011
9.00
Wing Tanks Sub-Structure C-sink and Dimple
Details
       

 12-30-2011
2.30
Deburring, C-sink, and Dimple Tank Parts
Details
       

 12-26-2011
1.10
Scotchbrite Inside Tank Skin Rivet Lines
Details
       

 12-23-2011
7.80
R-Tank Assy, Match Drill, Label, and Disassemble
Details
       

 12-22-2011
5.50
R Tank Stiffeners and Rib Assembly
Details
       

 12-21-2011
8.50
LTank Assemble and Match/Final Drill
Details
       

 12-20-2011
6.00
Assemble L-Tank with Stiffeners and Ribs
Details
       

 12-19-2011
2.00
Fabricate Tank Attach Zees and J-Stiffeners
Details
       

 12-18-2011
5.50
Re-straighten ribs and Trim Tank Stiffeners
Details
       

 09-05-2011
2.50
Flute Fuel Tank Ribs
Details
     

 09-04-2011
3.00
Wing Cradle Contruction
Details
       

 08-28-2011
8.00
Riveted R & L Wing LE Assy to Main Spars
Details
       

 08-27-2011
2.00
Assembled R Wing LE Assy to R-Wing Spar
Details
       

 08-26-2011
3.50
Finish riveting the RightWing LE wing assembly
Details
       

 08-25-2011
1.50
Continue riveting the Right Wing LE wing assembly
Details
       

 08-24-2011
1.50
Began rivet the Right Wing LE wing assembly
Details
       

 08-23-2011
2.00
Finished riveting the Left Wing LE wing assembly
Details
       

 08-22-2011
1.50
Continue riveting the Left Wing LE wing assembly
Details
       

 08-21-2011
4.20
Left Wing LE assemble and begin riveting
Details
       

 08-07-2011
2.00
Reassembled Leading Edges after priming
Details
       

 07-24-2011
2.50
Primed all LE Wing Parts
Details
       

 07-14-2011
1.00
Dimple LE L-Wing
Details
       

 07-12-2011
2.00
Dimple all LE Parts Except L-Skin
Details
       

 07-10-2011
7.70
Debur and Prep LE of Wings for Dimpling and Primer
Details
       

 07-09-2011
11.00
Fit Outboard Leading Edge Left and Right
Details
       

 07-07-2011
1.00
Created Cradle Assy for Leading Edge and Tanks
Details
     

 07-06-2011
1.50
Leading Edge Rib Trim Left and Right
Details
     

 07-04-2011
2.00
1 Leading Edge - Flute Ribs & make J-Stiffeners
Details
       

 07-04-2011
1.50
0 Rivetted Top Skin 5 rear inner rivets
Details
       

 07-03-2011
4.50
Rivet Top Right Wing Skins
Details
       

 06-27-2011
1.50
R Wing Align and Cleco Top Skins
Details
       

 06-26-2011
6.50
L WingTop Outboard & Inboard Wing Skin Riveting
Details
       

 06-25-2011
1.50
L Wing Top Outboard Skin Riveting
Details
       

 02-13-2011
2.00
Reassemble Left Wing for Rivetting
Details
       

 01-30-2011
10.00
Scuff,Dimple, and Prime L & R Wing Top Skins
Details
       

 01-29-2011
8.50
Match Drill and Machine C-Skin R-Wing Top Skins
Details
       

 01-28-2011
2.00
Cleco on the R-Wing Skins
Details
       

 01-27-2011
1.30
Dimpled Top of L-Wing Ribs and Rear Spar
Details
       

 01-26-2011
1.50
Blend Left Top Outer Wing Skin Joint
Details
       

 01-25-2011
2.00
Blend Left Top Inner Wing Skin Joint
Details
       

 01-23-2011
6.80
Final Drill L-Wing Top Skin
Details
       

 01-22-2011
2.70
Cleco L-Wing Top Skins
Details
       

 01-22-2011
6.30
0Reassemble and Rivet L & R Spars to Wing Ribs
Details
       

 01-21-2011
5.00
Prime all Rear Spar Parts
Details
       

 01-20-2011
2.00
Disassemble and Deburr Edges and Holes of Parts
Details
       

 01-19-2011
0.50
Dimpled L & R Rear Spar Upper Flange
Details
     

 01-18-2011
2.70
Match Drill R-Wing Rear Spar and Doubler Plates
Details
       

 01-17-2011
4.00
Match Drill L-Wing Rear-Spar and Doubler Plates
Details
       

 01-16-2011
2.30
Assemble Aileron Brackets, press Brngs, Rivet Assy
Details
       

 01-15-2011
6.30
Construct Aileron Hinge Brackets
Details
       

 01-14-2011
2.60
Install and Torque L & R Wing Rib Bolts
Details
       

 01-13-2011
2.30
Rivet Ribs to R-Wing Spar
Details
       

 01-12-2011
2.00
Rivet Ribs to Left Wing Spar
Details
       

 01-11-2011
1.30
Assemble Wing Ribs to L-Spar
Details
       

 01-09-2011
3.30
Rivet Flap Hinges and Torque Tube Assy
Details
       

 01-03-2011
0.50
Assemble Flap and Aileron Torque Tube Hardware
Details
       

 12-30-2010
6.00
Clean and Prime Ribs and related Hardware
Details
       

 12-29-2010
2.50
Enlarge Pilot Holes for Conduit
Details
       

 12-24-2010
6.00
Ribs Deburred and Scotchbrite for Priming
Details
       

 12-22-2010
2.00
R-Wing Debur Lightening Holes
Details
     

 12-21-2010
2.30
L-Wing Ribs Debur Lighting Holes.
Details
       

 12-20-2010
5.50
Assemble R-Wing to Spar; Debur L-Wing Ribs
Details
       

 11-28-2010
3.00
2-Assemble Left Wing Ribs to Spar
Details
       

 11-28-2010
3.50
1-Wing Rib Preparation
Details
       

 10-14-2010
1.00
L-Wing Drill Flap Hinge and Brackets
Details
       

 10-13-2010
0.80
L-Wing Match Drill Torque Tube Support Brackets
Details
       

 10-10-2010
1.00
L-Wing Manufacture Torque Tube Bracket Spacers
Details
     

 09-26-2010
2.00
Iinstall Tie-Downs on L & R Wing
Details
       

 09-26-2010
3.50
Flute and Straighten All Wing Ribs
Details
     

 09-25-2010
6.50
Wing Tank / Wing Attach Nutplates, Tie Down
Details
       

 09-25-2010
1.00
Right Spar Upper Flange Tank Nutplates
Details
       

 09-24-2010
1.20
Right Spar Tank & Access Nutplates
Details
       

 09-23-2010
1.00
Left Spar Fuel Tank / Access Nutplates
Details
       

 09-22-2010
1.50
Left Spar Rivet Top Flange Tank Nutplates
Details
       

 09-21-2010
1.00
Left & Right Wing Spar - Spot Prime
Details
       

 09-19-2010
7.00
Left & Right Spar Lower/Upper Countersink
Details
       

 09-18-2010
3.50
Left & Right Spar Lower Flange Countersink
Details
       

 09-16-2010
1.50
Right Spar - Drilling J-Stiffeners and Spar Ext.
Details
       

 09-15-2010
1.50
Right Spar - Drilling J-Stiffeners
Details
       

 09-13-2010
0.30
Shim up Right Spar from sagging
Details
     

 09-12-2010
5.70
Fabricate Left Wing Wing Box J-Stiffeners
Details
       

 08-02-2010
1.20
Rivet Spar Splice Plates L&R
Details
       

 08-01-2010
3.10
Final Drill, Prime, Re-cleco Spar Web Extentions
Details
       

 07-25-2010
1.50
Fit L&R Main Spar Web Extentions
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.