KitLog pro

Powered By Kitlog Pro v2.0

Cowboy's RV-10
' style=
Date:  4-4-2012
Number of Hours:  1.00
Manual Reference:  18-5
Brief Description:  Right Tank Attach Bracket Riveting

18-5:
Step 4: Counter sank all nutplate attach holes for NAS 1097 AD3 rivets. Dimpled two #19 holes associated with the K1100-08 nutplates.
Step 5: Rivetted the VA-146 bearing into place using the pneumatic squeezer.
Step 4: Rivetted the two K1100-08 nutplates into place with NAS 1097 AD3-3 rivets.
Step 5: Rivetted the T-1005B and C shims, K1000-08 nutplates, and MS21051-L08 nutplates to the Tank Attach Bracket using the hand squeezer and NAS 1097 AD3-4 rivets.
' style=

VA-146 Bearing Rivetted.

VA-146 Bearing Rivetted.

' style=

Finishing up the top.

Finishing up the top.

' style=

Hard to see but that end C-sink is a little wide.

Hard to see but that end C-sink is a little wide.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.