KitLog pro

Powered By Kitlog Pro v2.0

Cowboy's RV-10
' style=
Date:  4-11-2012
Number of Hours:  2.50
Manual Reference:  18-5
Brief Description:  Right Wing Tanks Stiffener Riveting

18-5:
Step 8: The usual stiffener riveting beginning on the top tank two and continuing with six of the inner bottom sections. Did have to drill out a few rivets (four) at the end when I probably was getting a little tired and Proseal was reaching working limits (This seems tough to do each night after working a full day of software testing and a five mile run. Must be the age).
' style=

Tonights progress.

Tonights progress.

' style=

Shop heads are looking better

Shop heads are looking better

' style=

Prosealed the vent bracket prior to riveting

Prosealed the vent bracket prior to riveting

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.